Goleta Water District Ellwood Reservoir Solar Power Systems
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Goleta Water District is undertaking a solar energy project at Ellwood Reservoir in Goleta, California, to enhance energy resilience and reduce operational costs by generating renewable power on-site, particularly to mitigate the impact of public safety power shutdowns. The project involves installing solar arrays on existing reservoir property with only minor land alterations and no expansion of facility use, and it is being pursued under California Environmental Quality Act (CEQA) categorical exemptions, including statutory exemption 21080.35 for solar energy systems and exemptions for existing facilities, minor land alterations, and resource conservation projects. The district, acting as both the project applicant and lead agency, is responsible for compliance, submission of required environmental documentation, and oversight, with no indication of a competitive procurement process or private contractor involvement. Administrative requirements include filing a Notice of Exemption, obtaining a No Effect Determination from the California Department of Fish and Wildlife, paying applicable state fees, and submitting documentation to the Santa Barbara County Clerk and the Office of Planning and Research in Sacramento, all handled via paper-based, mail-in processes without electronic submission portals or federal procurement formats. No formal contract value has been established, and there are no recognized federal acquisition elements such as CLINs, FAR clauses, contracting officer roles, payment offices, invoicing systems, or evaluation criteria. The project’s funding and execution are managed internally by the district, with key contacts being Daniel Brooks, Engineering and Infrastructure Manager, and David Matson, General Manager. The place of performance is specifically identified as the Northern Limit of Glen Annie Road in Goleta, and while the project was approved on November 25, 2025, no detailed timeline, delivery schedule, or performance metrics are provided. All compliance obligations are rooted solely in state environmental law, with no federal regulatory, security, labor, or socioeconomic requirements applicable. The initiative is framed as an infrastructure improvement under local authority, relying on CEQA exemptions to streamline environmental review rather than traditional procurement pathways.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code