Solar PV and Battery Energy Storage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the installation of solar photovoltaic equipment across multiple locations on the California State University, East Bay campus in Hayward, targeting a significant reduction in the campus’s energy consumption. New solar arrays will be mounted on the rooftop of the CORE building, while additional solar canopies will be constructed over parking lots G and H on the eastern side of the campus. Alongside these installations, solar array control equipment will be placed on existing concrete pads within developed campus areas, and a dedicated non-solar canopy will be added above ADA-accessible parking spaces in the same lots to enhance accessibility and protection. A battery energy storage system will be integrated into the existing Switchgear House near the main campus entrance, enabling the storage and timely use of generated solar energy to improve grid reliability and efficiency. The combined system is designed to offset approximately 30 percent of the campus’s annual electricity use, representing a major step toward sustainability and energy independence. The project is being led by the California State University Board of Trustees, with oversight and coordination handled by the Director of Planning, Design, and Construction, Daniel No, who serves as the primary point of contact for inquiries. All work is scoped to occur within existing campus infrastructure and developed areas to minimize environmental disruption and avoid new land use. The initiative aligns with broader state goals for renewable energy adoption and climate action, leveraging underutilized spaces like parking lots to maximize energy production without compromising campus functionality. The project was posted as a forecast on October 28, 2025, and its location is firmly situated at 25800 Carlos Bee Boulevard, Hayward, California, 94542, ensuring all activities remain within the confines of the university’s owned property.

General Info

Solar panels, canopies, and battery storage installed at CSU East Bay to cut energy use by 30 percent.

Agency

California State University Board of Trustees

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Carlos Bee Blvd and Hayward Blvd, Hayward, CA, 94542

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia State University Board of Trustees
Contacts1 person available
OfficeN/A
Organization / Agency
California State University Board of Trustees
Office AddressN/A
Contacts
Daniel NoDirector, Planning Design and Construction

Full Description

Show more
The project proposes new solar photovoltaic equipment at several sites on the CSUEB campus, located at 25800 Carlos Bee Boulevard in the City of Hayward. New solar arrays will be installed on the rooftop of the existing, centrally located CORE building (Building #70) and new solar array canopies will be installed over existing surface parking lots G and H on the east side of the campus. The project would also involve installing solar array control equipment on concrete pads within existing developed areas of the campus and installing a new non-solar canopy over ADA parking spaces in the same parking lots where solar array canopies are proposed. A battery energy storage system will also be installed in the existing campus Switchgear House (Building #34), just west of the main campus entrance and north of Carlos Bee Boulevard. The project is anticipated to offset approximately 30 percent of the campus’ annual energy consumption.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for the design, installation, and maintenance of commercial-scale solar photovoltaic systems at the Eagleville Campus to meet approximately 95 percent of the site's annual electricity needs. The project requires a firm to provide comprehensive Engineering, Procurement, and Construction services, including geotechnical surveys, structural assessments, permitting, and interconnection with PECO. The County is seeking a Power Purchase Agreement using FEOC-compliant equipment, with a preference for equipment meeting Build America Buy America requirements. Selected firms must coordinate with an existing professional engineering consultant and account for approximately 160,000 dollars in remaining grant funding. The contract will be awarded based on best value, emphasizing demonstrated experience with at least five similar projects and the employment of at least three NABCEP PVIP-Certified professionals. Proposals must be submitted via the Bonfire portal as separate technical and cost documents, accompanied by a W9 and completed certifications regarding business status and conflicts of interest. The project includes strict compliance with federal grant addendums, including nondiscrimination and audit provisions. Final acceptance requires the system to be fully commissioned with drone thermal imaging and the procurement of official permission to operate.
Montgomery County Pa

POSTED

10 days ago

DEADLINE

in 18 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town's primary objective is to establish a long-term land lease or Power Purchase Agreements (PPAs) for a period not to exceed 30 years to generate financial benefits, energy savings, and ensure the protection of the landfill cap. Proposals are due by October 8, 2026, with a suggested project start date in Spring 2027. Qualified proposers must demonstrate significant technical expertise, including at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for at least 10 years and a track record of completing at least three similar projects. The selection process will be based on the most advantageous proposal, weighing price against qualifications, technical capacity, and the specific financial benefits offered to the Town. Key requirements include a detailed plan of services, a conceptual site plan, and comprehensive decommissioning financial security. Developers are also responsible for managing utility interconnection risks and adhering to strict environmental and forestry protections, as merchantable timber remains Town property. Required submissions must include signed certifications regarding non-collusion, tax compliance, and non-discrimination.
TORTH - Town of Royalston - Town Hall

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement