San Luis West Solar Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.

General Info

San Luis West Solar: 125MW solar and 30MW battery project in Fresno County, California.

Agency

California → Fresno County

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

S of West Tractor Ave, W of California Aqueduct, E of I-5, Huron, CA, 93234

Set-Aside

NONE

Documents

(23)

San Luis West Solar Project Reclamation Plan September 2024

PDFreclamation-plan

2024110679_CDFW_Comment on San Luis West Solar Project DEIR

PDFcomment-letter

San Luis West Solar Project Geology and Soils Report July 2025

PDFgeology-and-soils-report

San Luis West Solar Project Final Environmental Impact Report October 2025

PDFenvironmental-impact-report

Appendix M_SLW Sound Analysis Report July 2025

PDFsound-analysis-report

San Luis West Solar Project Agricultural Conversion Study July 2025

PDFagricultural-conversion-study

San Luis West Solar Project Environmental Summary Form

PDFenvironmental-summary

Appendix A Comment Letters for San Luis West Solar Project

PDFcomment-letters

San Luis West Solar Project SCH Summary Form

PDFenvironmental-summary

Appendix H_SLW BUOW Report_July2025

PDFreport

San Luis West Solar Project Notice of Completion

PDFnotice-of-completion

San Luis West Solar Project Visual Impact Assessment July 2025

PDFvisual-impact-assessment

San Luis West Solar Project Pest Management Plan August 2024

PDFpest-management-plan

San Luis West Solar and Storage Project Biological Resources Evaluation Revised Report July 2025

PDFbiological-resources-evaluation-report

San Luis West Solar Project Air Quality and GHG Technical Report July 2025

PDFtechnical-report

San Luis West Solar and Storage Project Wetlands Delineation Revised Report July 2025

PDFwetlands-delineation-report

San Luis West Solar Project Traffic Impact Analysis December 2024

PDFtraffic-impact-analysis

San Luis West Solar Project Negative Phase I Archaeological Survey Report August 2024

PDFcultural-resources-report

NOA and Draft EIR for San Luis West Solar Project

PDFnotice-of-completion

Notice of Completion and Availability of Final Environmental Impact Report for San Luis West Solar Project

PDFfinal-eir-notice

San Luis West Solar Project Notice of Completion

PDFnotice-of-completion

Appendix L_SLW Water Supply Assessment_July2025

PDFwater-supply-assessment

Draft Environmental Impact Report for San Luis West Solar Project August 2025

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Fresno County
Office AddressN/A
Contacts
Megan McMullenProject Manager
David AtwaterProject Manager

Interested Companies (1)

Show more
ECORP Consulting
Rocklin, CA

Full Description

Show more
San Luis West Solar, LLC proposes to construct and operate the San Luis West Solar Project (Project). The Project will consist of a 125-megawatt (mW) solar photovoltaic (PV) electric generation facility coupled with an estimated 30 mW battery energy storage system (BESS). The PV portion of the facility will produce electricity by way of the photovoltaic effect, which uses a semi-conductor material to convert photons from the Sun into electrons, for injection into the electrical grid operated by PG&E. The BESS portion of the facility will store electricity either generated by the PV arrays or absorbed from the PG&E grid. In either case, the BESS will make the stored energy available for discharge during periods of peak electrical load. The Project facility includes approximately 770 acres of solar panels and associated infrastructure, including the Project substation, BESS, operations and maintenance (O&M) building, and other associated equipment such as overhead and underground medium voltage collection lines. Project infrastructure will also include approximately 10 additional acres of transmission easement areas for underground and overhead medium voltage collection lines situated along and within existing farm roads. The Project Area, which encompasses all areas of temporary and permanent impacts, is approximately 1,100 acres. Project Site Assessor's Parcel Numbers: 075-070-54S, 078-060-85S, 078-080-55. 085-050-01S, 085-050-47S, 085-050-48S. 085-050-84S

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for the design, installation, and maintenance of commercial-scale solar photovoltaic systems at the Eagleville Campus to meet approximately 95 percent of the site's annual electricity needs. The project requires a firm to provide comprehensive Engineering, Procurement, and Construction services, including geotechnical surveys, structural assessments, permitting, and interconnection with PECO. The County is seeking a Power Purchase Agreement using FEOC-compliant equipment, with a preference for equipment meeting Build America Buy America requirements. Selected firms must coordinate with an existing professional engineering consultant and account for approximately 160,000 dollars in remaining grant funding. The contract will be awarded based on best value, emphasizing demonstrated experience with at least five similar projects and the employment of at least three NABCEP PVIP-Certified professionals. Proposals must be submitted via the Bonfire portal as separate technical and cost documents, accompanied by a W9 and completed certifications regarding business status and conflicts of interest. The project includes strict compliance with federal grant addendums, including nondiscrimination and audit provisions. Final acceptance requires the system to be fully commissioned with drone thermal imaging and the procurement of official permission to operate.
Montgomery County Pa

POSTED

10 days ago

DEADLINE

in 17 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town's primary objective is to establish a long-term land lease or Power Purchase Agreements (PPAs) for a period not to exceed 30 years to generate financial benefits, energy savings, and ensure the protection of the landfill cap. Proposals are due by October 8, 2026, with a suggested project start date in Spring 2027. Qualified proposers must demonstrate significant technical expertise, including at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for at least 10 years and a track record of completing at least three similar projects. The selection process will be based on the most advantageous proposal, weighing price against qualifications, technical capacity, and the specific financial benefits offered to the Town. Key requirements include a detailed plan of services, a conceptual site plan, and comprehensive decommissioning financial security. Developers are also responsible for managing utility interconnection risks and adhering to strict environmental and forestry protections, as merchantable timber remains Town property. Required submissions must include signed certifications regarding non-collusion, tax compliance, and non-discrimination.
TORTH - Town of Royalston - Town Hall

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS