Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

San Luis West Solar Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Luis West Solar, LLC is proposing to develop and operate a 125-megawatt solar photovoltaic facility with an accompanying 30-megawatt battery energy storage system on approximately 770 acres of land in Fresno County, California, near the city of Huron. The project will generate electricity through photovoltaic panels and store surplus energy in the battery system for discharge during peak demand periods, feeding into the Pacific Gas and Electric Company grid. The full project area, including temporary and permanent impacts, spans about 1,100 acres and encompasses multiple Assessor’s Parcel Numbers. Infrastructure will include a substation, operations and maintenance building, medium voltage collection lines running both overhead and underground along existing farm roads, and approximately 10 additional acres dedicated to transmission easements. The project is slated for construction beginning in early 2026, with an anticipated Commercial Operation Date of December 31, 2026, following a nine-month construction timeline broken into phases including site preparation, solar array and inverter installation, electrical work, substation construction, and grid interconnection. Environmental compliance is central to the project, with extensive documentation prepared under CEQA, including studies on biological resources, air quality, greenhouse gas emissions, wetlands, archaeology, geology, water supply, noise, traffic, and agricultural conversion. Mitigation measures are outlined in a Monitoring and Reporting Program, with Fresno County acting as the lead agency responsible for oversight. The project proponent, San Luis West Solar, LLC, and consultant ECORP Consulting, Inc., are coordinating with multiple state and federal agencies for permitting and regulatory approval. Although comprehensive environmental analyses and mitigation plans are established, the contract documentation lacks critical procurement elements such as a solicitation number, contract value, pricing structure, FAR clauses, award evaluation criteria, payment or invoicing procedures, contracting officer details, packaging specifications, or socioeconomic certifications. No formal contract type, delivery terms, or clauses related to security, key personnel, options, or conflicts of interest are present. Contact information is provided for key staff, including a planner with Fresno County and project managers from the developer and consultant firms, but no designated contracting officer, COR, or COTR is identified.

General Info

125-MW solar plant with 30-MW battery storage to be built in Fresno County, California, operating by end of 2026.

Agency

California → Fresno County

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

S of West Tractor Ave, W of California Aqueduct, E of I-5, Huron, CA, 93234

Set-Aside

NONE

Documents

(23)

San Luis West Solar Project Reclamation Plan September 2024

PDFreclamation-plan

2024110679_CDFW_Comment on San Luis West Solar Project DEIR

PDFcomment-letter

San Luis West Solar Project Geology and Soils Report July 2025

PDFgeology-and-soils-report

San Luis West Solar Project Final Environmental Impact Report October 2025

PDFenvironmental-impact-report

Appendix M_SLW Sound Analysis Report July 2025

PDFsound-analysis-report

San Luis West Solar Project Agricultural Conversion Study July 2025

PDFagricultural-conversion-study

San Luis West Solar Project Environmental Summary Form

PDFenvironmental-summary

Appendix A Comment Letters for San Luis West Solar Project

PDFcomment-letters

San Luis West Solar Project SCH Summary Form

PDFenvironmental-summary

Appendix H_SLW BUOW Report_July2025

PDFreport

San Luis West Solar Project Notice of Completion

PDFnotice-of-completion

San Luis West Solar Project Visual Impact Assessment July 2025

PDFvisual-impact-assessment

San Luis West Solar Project Pest Management Plan August 2024

PDFpest-management-plan

San Luis West Solar and Storage Project Biological Resources Evaluation Revised Report July 2025

PDFbiological-resources-evaluation-report

San Luis West Solar Project Air Quality and GHG Technical Report July 2025

PDFtechnical-report

San Luis West Solar and Storage Project Wetlands Delineation Revised Report July 2025

PDFwetlands-delineation-report

San Luis West Solar Project Traffic Impact Analysis December 2024

PDFtraffic-impact-analysis

San Luis West Solar Project Negative Phase I Archaeological Survey Report August 2024

PDFcultural-resources-report

NOA and Draft EIR for San Luis West Solar Project

PDFnotice-of-completion

Notice of Completion and Availability of Final Environmental Impact Report for San Luis West Solar Project

PDFfinal-eir-notice

San Luis West Solar Project Notice of Completion

PDFnotice-of-completion

Appendix L_SLW Water Supply Assessment_July2025

PDFwater-supply-assessment

Draft Environmental Impact Report for San Luis West Solar Project August 2025

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Fresno County
Office AddressN/A
Contacts
Alexander PretzerPlanner
David AtwaterSenior Environmental Planner
Megan McMullenProject Development Manager

Interested Companies (1)

Show more
ECORP Consulting
Redlands, CA

Full Description

Show more
San Luis West Solar, LLC proposes to construct and operate the San Luis West Solar Project (Project). The Project will consist of a 125-megawatt (mW) solar photovoltaic (PV) electric generation facility coupled with an estimated 30 mW battery energy storage system (BESS). The PV portion of the facility will produce electricity by way of the photovoltaic effect, which uses a semi-conductor material to convert photons from the Sun into electrons, for injection into the electrical grid operated by PG&E. The BESS portion of the facility will store electricity either generated by the PV arrays or absorbed from the PG&E grid. In either case, the BESS will make the stored energy available for discharge during periods of peak electrical load. The Project facility includes approximately 770 acres of solar panels and associated infrastructure, including the Project substation, BESS, operations and maintenance (O&M) building, and other associated equipment such as overhead and underground medium voltage collection lines. Project infrastructure will also include approximately 10 additional acres of transmission easement areas for underground and overhead medium voltage collection lines situated along and within existing farm roads. The Project Area, which encompasses all areas of temporary and permanent impacts, is approximately 1,100 acres.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
SOLAR PHOTOVOLTAIC SYSTEM DEVELOPMENT AND POWER PURCHASE AGREEMENT
Solicitation # BD-27-1355-PRC-YPRC-131972
The Town of Yarmouth is inviting qualified proposers to submit bids for the lease of a parcel of municipal property at 74 Town Brook Road in West Yarmouth, Massachusetts, to develop, install, operate, and maintain a solar photovoltaic system. The selected proposer will also enter into a Power Purchase Agreement with the Town to sell the generated electricity, ensuring a long-term, sustainable energy supply. The project aligns with the Town’s goals for renewable energy adoption and cost efficiency, with all development and operational responsibilities falling to the proposer, who must meet the technical and financial criteria outlined in the solicitation. Proposals must demonstrate proven experience in solar project development, financial viability, and compliance with local and state regulations. Bids are due by September 10, 2026, and must be submitted in response to solicitation number BD-27-1355-PRC-YPRC-131972, which was posted on August 4, 2026. The process is managed by the Massachusetts Procurement division under the agency name PRC - PROCUREMENT, with Svetlana Salemme serving as the primary point of contact. The property is located in Barnstable County, within the 02673 ZIP code, and performance is expected to occur entirely on site. While no specific set-aside or NAICS code is designated, the solicitation is open to all qualified entities and emphasizes technical expertise, project scalability, and adherence to the Town’s energy objectives. Interested parties are encouraged to review the details via the provided Commbuys link.
PRC - PROCUREMENT

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
New
SLED
Orleans Solar-Storage ProjectAdapture Renewables, Inc. through its affiliate Orleans Energy Center, LLC is proposing the Orleans Solar-Storage Project on approximately 160 acres of privately owned land in unincorporated western Fresno County, California. The project includes a 25-megawatt alternating current photovoltaic solar energy facility coupled with a 25-megawatt alternating current battery energy storage system capable of storing up to 200 megawatt-hours of electricity, providing up to eight hours of discharge capacity. The development will feature an onsite electrical substation, internal wiring and collection infrastructure, and a new 1-mile, 70-kilovolt generation-tie line to connect to the existing Pacific Gas and Electric Company Giffen Substation. The project aims to enhance grid reliability and support renewable energy goals in the region by integrating solar generation with scalable storage. All development activities are subject to regional planning and environmental review processes overseen by Fresno County. The primary point of contact for the project is Arianna Brown, Planner at Fresno County, reachable at 559-600-4245 or arbrown@fresnocountyca.gov. Additional contacts include Sarah Spann, Principal Environmental Planner at Stantec, and Chrissy Gaglione, Development Manager at Adapture Renewables. The project has been posted under a forecast notice with a public record identifier of 2026080074 and is anticipated to proceed through environmental assessments and permitting phases in the coming years. The location of performance is designated as Fresno, California, with the zip code 93608, indicating the general area of impact. No formal solicitation number or set-aside classification has been assigned, as this is a private development proposal requiring local regulatory approval rather than a competitive government procurement.
Fresno County

POSTED

4 days ago

DEADLINE

N/A
View Details
NAICS: 221114
International
ELJ2026-SolarSystems: Procurement of Solar Systems
Solicitation # ELJ2026-SolarSystems
e-Learning Jamaica Company Limited, an agency of the Ministry of Education, Skills, Youth and Information, is seeking qualified suppliers to bid for the supply, installation, maintenance, and warranty support of solar system kits across multiple lots, with bidders permitted to submit proposals for up to two lots. Participation is strictly limited to those registered on the Government of Jamaica Electronic Procurement Portal, and all tender documents, clarifications, and submissions must be completed online via www.gojep.gov.jm; no hard copies or physical submissions will be accepted. To be deemed eligible, bidders must provide a valid Tax Compliance Certificate, proof of current registration with the Public Procurement Commission or National Commercial Council in the Electrical Appliance and Equipment category, and a bid security of JMD $200,000. Tender documents became available for download on July 22, 2026, with a final deadline for clarification requests on August 24, 2026, at 11:00 a.m., and all bids must be submitted by August 31, 2026, at 11:00 a.m. local time, followed by an online bid opening at 11:15 a.m. on the same day. The awarding authority reserves the right to reject any or all bids, including the lowest-priced submission, and may terminate the procurement process at any time prior to contract award without incurring liability to participants.
e-Learning Jamaica Limited

POSTED

16 days ago

DEADLINE

in 24 days
View Details
NAICS: 221114
Federal
Preventive Maintenance Services for Photovoltaic Systems
Solicitation # PR15733540
The United States Consulate General in Hyderabad, India, is soliciting professional services to perform preventive maintenance on its photovoltaic systems under solicitation number PR15733540, with responses due by August 26, 2026. The contract, classified under NAICS code 221114 for Solar Electric Power Generation, is a commercial item acquisition governed by FAR 52.212-1 and 52.212-4, with a firm-fixed-price structure expected. The base performance period is one year, with four one-year option periods available, allowing for a potential five-year contract duration. Work involves semi-annual maintenance tasks including cleaning and inspecting DC disconnects, inverter servicing, cable polarity verification, and system performance evaluations, all aligned with IEC 62446-1:2016 standards and manufacturer guidelines. Deliverables require completion of maintenance checklists, submission of performance test results within 30 days, and ensuring no more than one customer complaint per month. Contractors must provide an operational strategic plan, evidence of qualified personnel and equipment, a plan to secure necessary licenses, and a list of clients from the past five years. Key personnel must be fluent in English, sign off on all tasks, and submit reports to the COR within five business days. All offerors must be registered in SAM, hold valid GST certification if based in India, maintain minimum liability insurance of INR 1 million, comply with Indian labor laws, and adhere to prohibitions on the use of ByteDance-covered applications such as TikTok. No formal security clearances are mandated, but physical access to the consulate requires compliance with on-site identification and conduct protocols. Contractors must avoid any misrepresentation of government affiliation and cannot use Department of State logos. Subcontractor sales restrictions, whistleblower protections, labor standards, and anti-trafficking clauses are incorporated, with electronic funds transfer required for payments submitted via email to MissionIndiaPayments@state.gov. Performance will be evaluated based on past performance, offeror responsibility including financial health and technical capability, and pricing, with award determined through a best-value trade-off process rather than lowest price technically acceptable. No packaging or marking requirements beyond electrical warning labels are specified, and no FOB terms or Incoterms are defined in the solicitation.
American Consulate Hyderabad

POSTED

17 days ago

DEADLINE

in 19 days
View Details
NAICS: 221114
SLED
CSUB Solar & Battery Advanced Shovel-Ready SLPPA
Solicitation # 0000039798
The California State University, Bakersfield is soliciting proposals for a 20-year Site License Power Purchase Agreement (SLPPA) to finance, construct, own, operate, maintain, and ultimately remove or transfer a solar photovoltaic system with an integrated battery energy storage system (BESS) on its campus. The project is designated as advanced shovel-ready, with a Notice to Proceed scheduled for late November 2026 and a firm deadline for commercial operation and Permission to Operate set for December 1, 2027. Proposals must be submitted in sealed packages to the campus procurement office by September 16, 2026, and are evaluated using a best-value trade-off approach prioritizing both technical merit and lifecycle cost, with the 20-year Levelized Cost of Energy (LCOE) carrying the single largest weight at 320 out of 1,000 total evaluation points. The SLPPA provider must demonstrate proven experience in medium-voltage electrical work at 12 kV or above, intentional islanding capability, and successful integration of BESS with microgrid controls and non-export protection systems. Licensing is strictly enforced: the primary contractor must hold active, current Class A and C-10 California contractor licenses—no substitutions permitted—and must be registered with the California Department of Industrial Relations, maintain prevailing wage compliance, and carry workers’ compensation insurance. The system must deliver a minimum of 7,675,565 kWh in Year 1 with no more than 0.50% annual degradation, achieve system availability of at least 98%, and pass comprehensive commissioning and acceptance testing verified by PG&E and local authorities. All deliverables—including as-built drawings, O&M manuals, warranties, training documentation, and lien releases—are required upon project closeout. Offerors must also submit certifications for Small Business Enterprise and Disabled Veteran Business Enterprise status if applicable, along with non-collusion and conflict-of-interest affidavits, and comply with California’s CEQA and public contract codes. The project’s bundled advancement and procurement cost is capped at $5,745,215.92, though the long-term PPA rate per kWh remains unspecified. Failure to meet any mandatory qualification, submit required documentation, or adhere to formatting and submission rules will result in automatic disqualification. The proposal must be organized into 15 carefully defined tabs with strict page limits to ensure equitable evaluation.
CSU, Bakersfield

POSTED

23 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grace Solar Energy CenterThe Grace Solar Energy Center project, formerly known as the Palo Verde Mesa Solar Project, involves a significant revision to expand its scale and infrastructure, increasing the photovoltaic facility’s capacity from 463.5 MW to 500 MW and adding a配套 500 MW battery energy storage system. The site’s land use has been adjusted from 3,250 to 3,310 acres, with transmission modifications including a new 1.9-mile 230-kV line connecting to an existing 8.6-mile right-of-way that feeds into the Southern California Edison Colorado River Substation, resulting in a total 10.5-mile transmission corridor. A portion of this line, measuring 158 feet, crosses a County of Riverside public right-of-way, necessitating a public use permit, while the remainder of the corridor operates on private or federal land outside county jurisdiction. Land use approvals under Conditional Use Permit CUP03684R01, Public Use Permit PUP00916R01, and Development Agreement DA0086A01 are integral to the project’s legal framework, with the latter being mandatory under Riverside County Ordinance No. 348 and Policy B-29, which require a binding development agreement before any solar project approval. The Bureau of Land Management land expansion from 28 to 395 acres falls outside the scope of these revisions. The project is governed by the California Environmental Quality Act, requiring a finalized Environmental Impact Report, mitigation monitoring plan, and a Statement of Overriding Considerations, with environmental compliance and ongoing oversight handled by Riverside County. All financial transactions related to permits and fees were processed through Tyler Payments, with regulatory fees totaling $4,277.50 paid to the California Department of Fish and Wildlife and other county administrative charges. The project is located approximately 2.8 miles north of Interstate 10, west of Blythe, California, with primary coordination managed by the Riverside County Planning Department and the applicant, Boulevard Associates, LLC, through Senior Project Manager Brendan Lewis and County Senior Planner Dat Tran. No federal acquisition clauses, contract types, pricing structures, or procurement-specific representations are present, as the documentation reflects state and local land-use approvals rather than a federal contract.
Riverside County

POSTED

24 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Encino Reservoir Floating Solar Pilot ProjectThe Encino Reservoir Floating Solar Pilot Project involves the installation of a 5-megawatt floating solar panel array on the southwest portion of the reservoir, complemented by a 30-kilowatt ground-mount photovoltaic system on the same property. All electrical infrastructure—including inverters, transformers, and switchgear—will be situated adjacent to the ground-mount system and connected to the existing 34.5-kilovolt above-ground distribution line within the reservoir property. Additionally, a 5-megawatt, 20-megawatt-hour iron-flow battery energy storage system will be deployed on a 6,500-square-foot area north of the reservoir to support grid stability and energy dispatch. Construction is scheduled from July 2026 through July 2027, with distinct phases for floating solar, electrical connections, inverter installation, system energization, battery deployment, and ground-mount solar completion. The project is led by the Los Angeles Department of Water and Power, with environmental compliance as a central focus under CEQA and state regulations, requiring mitigation for air quality, biological resources, water quality, noise, and greenhouse gas emissions. All environmental assessments and mitigation plans are documented in eight technical appendices covering air quality, biological resources, wetland delineation, special-status plant surveys, avian habitat impacts, cultural resources, greenhouse gas emissions, and noise and vibration. Inspection and acceptance occur on-site at the reservoir property, governed by standards from the Regional Water Quality Control Board, California Air Resources Board, South Coast Air Quality Management District, Clean Water Act, and federal NAAQS, with oversight conducted by LADWP as the Lead Agency. The primary point of contact for submittals and coordination is David Norris, Environmental Planning and Assessment Manager, reachable via mail at 111 North Hope Street, Los Angeles, CA 90012, by phone at (213) 367-3509, or by email at david.norris@ladwp.com. Proposals for public comment are due by January 13, 2026, and must be submitted either electronically through the LADWP environmental notices portal or as 15 hard copies along with a summary form. No formal contract pricing, line items, or federal procurement clauses are specified in the documentation, and while state environmental certifications under the Clean Water Act are provided, no federal acquisition representations, socioeconomic certifications, or payment terms are included. The project reflects
California Los Angeles Department of Water and Power

POSTED

25 days ago

DEADLINE

N/A
View Details