Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Padre Dam Municipal Water District is planning the Design and Installation of a Photovoltaic Solar Panel Array and Battery System alongside Level 2 Electric Vehicle Charging Stations at its Operations Yard and Employee Parking Lot in Santee, California. Solar panels will be installed on existing canopies or new carport structures built within the active employee parking area, utilizing only previously disturbed land on District property to minimize environmental disruption. The project is designed to enhance energy efficiency, reduce long-term energy expenses, and lower the environmental footprint of facility operations through clean, renewable power generation and on-site energy storage. All construction and operational activities will adhere strictly to applicable codes, regulations, and safety standards. The system will integrate solar energy production with battery storage to optimize energy use and provide resilience during peak demand or grid interruptions. Level 2 charging stations will support electric vehicle adoption among staff and fleet operations. The project is forecasted to be issued in June 2026 with Tom Bloomer, Engineer/CIP Project Manager, identified as the primary point of contact for inquiries. Work will remain confined to existing District infrastructure within the 92071 zip code area, ensuring no new land disturbance beyond established boundaries.
General Info
Agency
NAICS
Place of Performance
Carlton Oaks Drive and Fanita Parkway, Santee, CA, 92071Set-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
