Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

NABR - 15674 - Replace Failing Solar Array Panels - Construction

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Department of the Interior is seeking a contractor for project NABR 15674 to replace failing solar array panels at the Natural Bridges National Monument. This construction effort involves replacing eight 420-volt strings of monocrystalline solar panels that have exceeded their useful service life, along with the installation of 112 solar panels, 900 lineal feet of electrical wiring per panel to the junction box, 16 DC fuses, and 8 DC arresters. The scope of work includes the replacement of panels, inverters, and wiring, as well as the integration of the system with existing generators. This forecast is categorized under NAICS code 221114 and is managed by the National Park Service.

General Info

Department of the Interior contractor to replace solar panels at Natural Bridges National Monument.

Agency

Department of the Interior

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

UT, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment of the Interior
Contacts2 people available
OfficeN/A
Organization / Agency
Department of the Interior
Office AddressN/A
Contacts
Contract Support Center

Full Description

Show more
Project replaces panels, inverters, wiring and integrates system to generators. This project replaces eight (8) 420-volt strings of monocrystalline solar panels in the Natural Bridges National Monument photovoltaic array field that were installed in 1999 and is now past their useful service life, including 8 feet X 24 feet at 112 solar panels, 900 lineal feet of electrical wiring from each panel to the array field junction box, 16 each 600-volt DC fuses, and 8 each 600-volt DC arresters.

Similar Contracts

Same NAICS industry code

NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-132882
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, finance, construct, operate, and decommission a solar generating facility at the Royalston Landfill located at 6 Town Dump Road. Pursuant to M.G.L. c. 30B S.16, the Town seeks a developer to utilize the 78-acre site for a project with a capacity between 1 and 6 MW AC, though proposals up to 5 MW AC are specifically encouraged. The Town is open to various financial structures, including long-term land leases or power purchase agreements, to ensure financial benefits such as annual lease payments, revenue sharing, and energy savings. The project term is not to exceed 30 years and may include the integration of battery energy storage systems. The selected developer will be responsible for all project-related costs, including MassDEP permitting, interconnection risks, and site maintenance. Key requirements include the provision of decommissioning financial security via a surety bond or letter of credit and the procurement of an independent timber appraisal by a Massachusetts Licensed Forester before any clearing occurs. Proposals are due by 12:00 PM EST on October 8, 2026, and must be submitted in separate sealed envelopes for pricing and non-pricing information. Award selection will be based on the most advantageous proposal, weighing price against qualifications, past performance, technical capacity, and the merits of the proposed plan of services.
TORTH - Town of Royalston - Town Hall

POSTED

10 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
City Owned Solar Development – Brand LandfillThe City of Glendale and Glendale Water & Power are implementing the Brand Park Solar Photovoltaic System Project, which involves the construction and operation of a city-owned 1.815 megawatt ground-mount solar system. The project is located on a 2.1 acre portion of a 219 acre parcel at 1601 West Mountain Street in Glendale, California, situated within Pomeroy Canyon and the southern Verdugo Mountains. The installation will be placed on a manufactured flat pad of an inactive landfill, requiring only minor site preparation and leveling without significant grading. The infrastructure consists of 3,300 ground-mounted PV panels, transformers, inverters, and combiner panels reaching heights of approximately 6 feet 6 inches, with electrical distribution lines installed on new wood utility poles along existing access roads. The project is categorized as exempt from the California Environmental Quality Act under CEQA Guidelines Sections 15303 and 15304. To ensure environmental compliance and the protection of biological resources, the project requires adherence to a Biological Resources Assessment prepared by TRC. Mandatory pre-construction surveys must be completed before building permits are issued and construction begins, specifically targeting nesting birds, raptors, the Least Bell's vireo, special status wildlife, Crotch's Bumble Bee, and the Western Spadefoot Toad. The project is managed by the City of Glendale with primary coordination through the Principal Planner and Business Transformation Manager.
City of Glendale

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Santa Barbara Community College District Solar Power Array & Battery Energy Storage System MicrogridThe Santa Barbara Community College District is implementing a solar power array and battery energy storage system microgrid at the Cliff Campus in Santa Barbara, California. This project involves the installation of 1.6 megawatts of carport-mounted solar arrays, battery energy storage systems, transformers, inverters, and related electrical infrastructure. The work will be concentrated within existing parking facilities on the East and West Campuses, specifically targeting Parking Lots 1A, 1B, 4A, 4B, 4C, and 4D. The primary objectives of the installation are to provide 8 to 24 plus hours of energy resilience, reduce the district's carbon footprint, and lower long-term energy costs through renewable energy generation. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from the California Environmental Quality Act pursuant to Categorical Exemption Class 1 for Existing Facilities, as the project occurs within previously developed areas with no expansion of use or new land disturbance. Project administration is managed by the Santa Barbara Community College District, with key coordination involving Rachel Hollander and Chris Renbarger. The project is classified under NAICS code 221114 and was formally documented via a Notice of Exemption dated June 4, 2026.
Santa Barbara Community College District

POSTED

11 days ago

DEADLINE

N/A
View Details