Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Rosamond South Solar Project by Golden Fields Solar IV, LLC

Forecast
State & Local
Solicitation #
2021060079

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Rosamond South Solar Project, managed by Golden Fields Solar IV, LLC, involves the construction and operation of photovoltaic solar facilities and associated infrastructure on approximately 1,302 acres of privately owned land in unincorporated Kern County, California. The project is designed to generate up to 165 megawatt alternating current of renewable energy and includes energy storage capacity of up to 245 MW or 980 megawatt hours. A critical component of the project's regulatory compliance involves the management of the incidental take of 1,354 western Joshua trees, which are protected under the California Endangered Species Act and the Western Joshua Tree Conservation Act. The project has undergone several permit amendments to adjust the number of impacted trees and refine preservation conditions. The most recent update, Amendment No. 4 to Incidental Take Permit No. 1927-ITP-2023-018-04, modifies the Western Joshua Tree Preservation Condition of Approval and extends the deadline for the recordation of the required conservation easement.

General Info

Golden Fields Solar IV builds 165MW solar project in California, impacting Joshua trees.

Agency

California → Kern County

Place of Performance

Bakersfield, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts2 people available
OfficeN/A

Full Description

Show more
The Project includes the construction and operation of photovoltaic (PV) solar facilities and associated infrastructure necessary to generate up to 165 megawatt (MW) alternating current (MW-AC) of renewable energy, including up to 245 MW (or 980 megawatt hours (MWh)) of energy storage, on approximately 1,302 acres of privately-owned land. The Project will result in incidental take of 1,354 western Joshua trees (WJT, Yucca brevifola), which are protected under the WJTCA and the California Endangered Species Act. The WJTCA ITP referenced above as issued by CDFW authorizes incidental take of WJT that may occur as a result of Project implementation. Amendment No. 1 revised the number of impacted WJT from 1,346 to 1,347 adding one additional live Class B WJT. Amendment No. 2 revised the number of impacted WJT from 1,347 to 1,371 trees. Amendment No. 3 authorized take of an additional 229 WJT and removes take authorization for 246 WJT, further revising the number of impacted WJT from 1,371 to 1,354. Amendment No.4 amends the WJT Preservation Condition of Approval and extends the deadline for recordation of the conservation easement.

Similar Contracts

Same NAICS industry code

NAICS: 221114
SLED
RPCA Solar 17, LLC Project (PSP 25-092)
Solicitation # PSP 25-092
RPCA Solar 17, LLC is developing a small-scale utility solar generation facility in unincorporated Tulare County, California, near Porterville. The project will be situated on approximately 13.6 acres across three parcels totaling 17.6 acres within the Exclusive Agricultural zoning district. The project sponsor has secured a long-term lease agreement with the property owner, the Antoine Bechara Revocable Trust, to facilitate the construction and operation of the facility. Once complete, the project will generate up to 3 megawatts of alternating current clean energy using single-axis tracking solar modules. The generated power is intended to be sold to the Clean Power Alliance through a long-term Power Purchase Agreement, with interconnection provided via Southern California Edison's existing electrical distribution system. The facility will feature a seven-foot chain-link fence with wildlife-permeable design elements and will be accessed by a 20-foot wide all-weather gravel road. Electrical connections will transition from existing overhead lines to underground utility runs leading to a central power station and transformer. The site will be operated remotely with professional operations and maintenance contractors managing the facility and native groundcover restoration. Environmental compliance is being managed through an Initial Study and Mitigated Negative Declaration, with all mitigation measures incorporated into a formal Monitoring and Reporting Program to ensure the protection of the surrounding agricultural and rural residential landscape.
Tulare County

POSTED

8 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Request for Information Relative to the Process of Renewable Energy Programs
Solicitation # 510-27
The New Hampshire Department of Administrative Services, Bureau of Purchase and Property, has issued Request for Information (RFI) 510-27 to gather data on renewable energy programs, specifically focusing on solar projects within the state. The objective is to evaluate options such as Community Solar, Power Purchase Agreements, and Group Net Metering to refine the state's energy portfolio and reduce fossil fuel reliance in alignment with Executive Order 2016-03, NH RSA 362, and PUC 909. The state is seeking information on renewable energy rebate solutions and the availability of projects that are either immediate or expected to come online within the next six years. This solicitation is for informational purposes only and does not commit the state to issuing a formal Request for Proposal or awarding a contract. Responses are due by December 16, 2026, at 9:00 AM EST and must be submitted via email to [email hidden], with a maximum file size limit of 7 MB. Submissions must include a detailed company profile and be clearly marked with the RFI number, due date, and the purchasing agent's name. There is no set-aside status for this solicitation. All responses are subject to public records laws, and any proprietary information must be submitted as a separate redacted copy with a supporting rationale letter.
Das Purchasing (statewide Bids & Contracts)

POSTED

11 days ago

DEADLINE

in 19 days
View Details
NAICS: 221114
SLED
Solar Photovoltaic System(s)
Solicitation # CSCU 27-1409465
Connecticut State Colleges and Universities (CSCU) is soliciting proposals from qualified developers to provide a turnkey solution for the financing, design, installation, operation, and maintenance of solar photovoltaic (PV) systems. The project spans multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College campuses at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will deliver electricity to these institutions under a Power Purchase and Licensing Agreement (PPA) with a 20-year base contract term, potentially extending up to 25 years. The scope includes all engineering, materials, and labor, with a requirement that the contractor submit the project to Eversource’s large LREC/ZREC program. The project is anticipated to commence on February 8, 2027, with a completion date of December 31, 2028. Proposals are due by December 16, 2026, and will be evaluated based on factors such as generation cost per kilowatt-hour, minimum yearly kilowatt-hours provided, project readiness, and the strength of funding commitments. Technical requirements include a minimum 30-year design life for structural components, certification by Underwriter Laboratories (UL), and approval from the State Fire Marshal and FM Global. This solicitation is not a set-aside.
DAS Procurement

POSTED

24 days ago

DEADLINE

in 19 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS