Solar Infrastructure and Battery Energy Storage System Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves replacing a existing 1-megawatt ground-mounted solar array with a new up to 6-megawatt solar facility equipped with a dual-axis tracking system and a battery energy storage system with a minimum capacity of 3 megawatt-hours. The new facility will connect to the University of California, Merced campus distribution grid using the existing gen-tie line and will leverage current water infrastructure while requiring upgrades to the on-site fire water storage tank or the construction of a new one to meet regulatory requirements. Access to the site will be maintained via the existing road off Cottonwood Loop, which will be widened to at least 22 feet to comply with local fire ordinances. The entire site will be enclosed with six-foot chain-link fencing, potentially incorporating barbed wire to allow for cattle grazing, and secured with a locked gate at the entrance for controlled access. The project is forecasted by the University of California, Merced with the place of performance located in Merced, California, and inquiries should be directed to the Director of Physical and Environmental Planning or the Principal Planner listed in the contract data.

General Info

Replace 1 MW solar array with 6 MW tracked system plus 3 MWh battery, connect to campus grid, upgrade fire tank, widen road, fence site.

Agency

University of California, Merced

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

Cottonwood Loop, Merced, CA, 95343

Set-Aside

NONE

Documents

(5)

Summary Form for UCM Solar and BESS Project

PDFenvironmental-summary

NOI to Adopt MND for UC Merced Solar and BESS Project

PDFspecial-notice

UC Merced Solar and BESS Mitigation Monitoring and Reporting Program

PDFmitigation-monitoring-reporting-program

NOC_UCM Solar and BESS Project Environmental Document

PDFnotice-of-completion

UC Merced Solar and BESS Initial Study/Mitigated Negative Declaration Public Review Draft June 2026

PDFinitial-study-mitigated-negative-declaration

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyUniversity of California, Merced
Contacts2 people available
OfficeN/A
Organization / Agency
University of California, Merced
Office AddressN/A
Contacts
Phillip WoodsDirector of Physical & Environmental Planning
Lesley OwningPrincipal Planner

Interested Companies (1)

Show more
HELIX Environmental Planning
La Mesa, California

Full Description

Show more
The project would include the demolition of an existing 1-megawatt (MW) ground-mounted solar array facility, and the construction of an up to 6-MW solar facility consisting of a dual-axis tracking system and a new battery energy storage system (BESS) with a minimum storage capacity of 3 megawatt-hour (MWh). The project would interconnect to the UC Merced campus’ existing distribution system and power grid via the existing gen-tie line. The project would be served by existing water distribution infrastructure and would include upgrades to the existing fire water storage tank and/or the construction of a new water storage tank on-site to meet water storage requirements for the proposed project. Access to the project site would be provided by the existing ingress/egress access road off of Cottonwood Loop, which would be improved in accordance with the local fire ordinances to a minimum width of 22 feet. The site would be fenced with six-foot-tall chain-link fencing, which may include barbed wire to facilitate cattle grazing onsite. A locked gate would be located at the project site entrance off of Cottonwood Loop to control ingress/egress.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

6 days ago

DEADLINE

in 13 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for the design, installation, and maintenance of commercial-scale solar photovoltaic systems at the Eagleville Campus to meet approximately 95 percent of the site's annual electricity needs. The project requires a firm to provide comprehensive Engineering, Procurement, and Construction services, including geotechnical surveys, structural assessments, permitting, and interconnection with PECO. The County is seeking a Power Purchase Agreement using FEOC-compliant equipment, with a preference for equipment meeting Build America Buy America requirements. Selected firms must coordinate with an existing professional engineering consultant and account for approximately 160,000 dollars in remaining grant funding. The contract will be awarded based on best value, emphasizing demonstrated experience with at least five similar projects and the employment of at least three NABCEP PVIP-Certified professionals. Proposals must be submitted via the Bonfire portal as separate technical and cost documents, accompanied by a W9 and completed certifications regarding business status and conflicts of interest. The project includes strict compliance with federal grant addendums, including nondiscrimination and audit provisions. Final acceptance requires the system to be fully commissioned with drone thermal imaging and the procurement of official permission to operate.
Montgomery County Pa

POSTED

11 days ago

DEADLINE

in 17 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, and decommission a solar generating facility at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility size between 1 and 6 MW AC, with a focus on maximizing feasible buildout up to 5 MW AC and the optional inclusion of battery energy storage systems. The Town aims to establish a long-term land lease or Power Purchase Agreement (PPA) for a period not to exceed 30 years to generate financial benefits, including annual lease payments, revenue sharing, and host community benefits. A suggested project start date is Spring 2027. Proposers must demonstrate significant technical expertise, including at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for 10 years and a track record of completing at least three similar projects. Submissions must include a conceptual site plan, a detailed project schedule, a financial structure, and a plan of services not exceeding 20 pages. Evaluation will be based on a combination of price, technical and management capacity, and specific criteria regarding landfill cap protection, timber resource management, and interconnection feasibility. Proposals are due by 12:00 PM EST on October 8, 2026. Selected developers will be responsible for all permitting, utility interconnection risks, and providing decommissioning financial security via an irrevocable letter of credit or surety bond.
TORTH - Town of Royalston - Town Hall

POSTED

12 days ago

DEADLINE

in 16 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement