Solar Infrastructure and Battery Energy Storage System Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The project involves replacing a existing 1-megawatt ground-mounted solar array with a new up to 6-megawatt solar facility equipped with a dual-axis tracking system and a battery energy storage system with a minimum capacity of 3 megawatt-hours. The new facility will connect to the University of California, Merced campus distribution grid using the existing gen-tie line and will leverage current water infrastructure while requiring upgrades to the on-site fire water storage tank or the construction of a new one to meet regulatory requirements. Access to the site will be maintained via the existing road off Cottonwood Loop, which will be widened to at least 22 feet to comply with local fire ordinances. The entire site will be enclosed with six-foot chain-link fencing, potentially incorporating barbed wire to allow for cattle grazing, and secured with a locked gate at the entrance for controlled access. The project is forecasted by the University of California, Merced with the place of performance located in Merced, California, and inquiries should be directed to the Director of Physical and Environmental Planning or the Principal Planner listed in the contract data.
General Info
Agency
NAICS
Place of Performance
Cottonwood Loop, Merced, CA, 95343Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code