Solar Infrastructure and Battery Energy Storage System Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves replacing a existing 1-megawatt ground-mounted solar array with a new up to 6-megawatt solar facility equipped with a dual-axis tracking system and a battery energy storage system with a minimum capacity of 3 megawatt-hours. The new facility will connect to the University of California, Merced campus distribution grid using the existing gen-tie line and will leverage current water infrastructure while requiring upgrades to the on-site fire water storage tank or the construction of a new one to meet regulatory requirements. Access to the site will be maintained via the existing road off Cottonwood Loop, which will be widened to at least 22 feet to comply with local fire ordinances. The entire site will be enclosed with six-foot chain-link fencing, potentially incorporating barbed wire to allow for cattle grazing, and secured with a locked gate at the entrance for controlled access. The project is forecasted by the University of California, Merced with the place of performance located in Merced, California, and inquiries should be directed to the Director of Physical and Environmental Planning or the Principal Planner listed in the contract data.

General Info

Replace 1 MW solar array with 6 MW tracked system plus 3 MWh battery, connect to campus grid, upgrade fire tank, widen road, fence site.

Agency

University of California, Merced

Place of Performance

Cottonwood Loop, Merced, CA, 95343

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyUniversity of California, Merced
Contacts2 people available
OfficeN/A
Organization / Agency
University of California, Merced
Office AddressN/A
Contacts
Phillip WoodsDirector of Physical & Environmental Planning
Lesley OwningPrincipal Planner

Interested Companies (1)

Full Description

Show more
The project would include the demolition of an existing 1-megawatt (MW) ground-mounted solar array facility, and the construction of an up to 6-MW solar facility consisting of a dual-axis tracking system and a new battery energy storage system (BESS) with a minimum storage capacity of 3 megawatt-hour (MWh). The project would interconnect to the UC Merced campus’ existing distribution system and power grid via the existing gen-tie line. The project would be served by existing water distribution infrastructure and would include upgrades to the existing fire water storage tank and/or the construction of a new water storage tank on-site to meet water storage requirements for the proposed project. Access to the project site would be provided by the existing ingress/egress access road off of Cottonwood Loop, which would be improved in accordance with the local fire ordinances to a minimum width of 22 feet. The site would be fenced with six-foot-tall chain-link fencing, which may include barbed wire to facilitate cattle grazing onsite. A locked gate would be located at the project site entrance off of Cottonwood Loop to control ingress/egress.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS