Agency

California → San Joaquin County

Place of Performance

Lemon Avenue, Escalon, CA, 95320

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Joaquin County
Contacts3 people available
OfficeN/A
Organization / Agency
California → San Joaquin County
Office AddressN/A
Contacts
Jacob PahuleAssociate Planner
Harrison GrandProject Manager

Interested Companies (1)

Show more
AdvancedGeo
Stockton, CA

Full Description

Show more
A Conditional Use Permit application for a 4,199.040-kilowatt (kW) DC STC ground-mounted photovoltaic system occupying approximately 10.59 acres. Site access will be provided via an existing driveway located at the east of Harold Avenue, a County-maintained roadway, as well as a proposed fire access road accessed off of South Harold Avenue and East Lemon Avenue. The project site will be served by existing private water, stormwater, and septic systems. The parcel is currently subject to a Williamson Act Contract.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

14 days ago

DEADLINE

in 6 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County is soliciting proposals for Engineering, Procurement, and Construction (EPC) services to design, install, and maintain solar arrays at the Eagleville Campus. The primary objective is to supply approximately 95% of the campus electricity needs, totaling 6,800 MWH annually, through a Power Purchase Agreement (PPA) utilizing FEOC-compliant equipment. The scope of work includes geotechnical and structural assessments, permitting, sourcing equipment, and securing interconnection agreements with PECO. The project requires the successful commissioning of the system, including drone thermal imaging and obtaining Permission to Operate. The contract award will be based on the Best Value concept, prioritizing firms with demonstrated experience in commercial-scale solar PV systems, specifically those who have completed at least five similar projects and employ at least three NABCEP PVIP-Certified professionals. Proposers must coordinate with the County's existing engineering consultant and account for approximately $160,000 in remaining grant funding. Submissions must be uploaded via the Bonfire portal and include a separate technical proposal, cost proposal, W9, and Appendix A certifications. The agreement is subject to federal grant requirements, including Build America Buy America (BABA) guidelines and strict nondiscrimination and audit compliance.
Montgomery County Pa

POSTED

18 days ago

DEADLINE

in 9 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, and maintain a Solar Generating Facility at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with an optional battery energy storage system. The Town's primary objectives are to secure financial benefits through a long-term land lease or Power Purchase Agreements, while ensuring the protection of the landfill cap and the preservation of merchantable timber. The selected developer will be responsible for all due diligence, utility interconnection, and environmental compliance for a term not to exceed 30 years, with a suggested start date in Spring 2027. Proposals are due by 12:00 PM EST on October 8, 2026, and must include a plan of services, a conceptual site plan, a detailed project schedule, and a proposed financial structure. Evaluation will be based on a combination of price and qualifications, including the developer's technical capacity, past performance on similar capped landfill projects, and the specific financial benefits offered to the Town. Minimum requirements include at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for 10 years and a track record of completing at least three similar projects. Awarded developers must provide decommissioning financial security and maintain comprehensive insurance, including at least 5 million dollars in commercial general liability coverage.
TORTH - Town of Royalston - Town Hall

POSTED

19 days ago

DEADLINE

in 9 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS