Stockton East Water District (SEWD) Solar Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Stockton East Water District (SEWD) Solar Project involves the construction and operation of a behind-the-meter solar photovoltaic energy generation facility and battery energy storage system located in San Joaquin County, California. The facility features a total nameplate capacity of approximately 2 megawatts and includes a 3.3-acre ballasted solar array partially situated on an underground water tank, a 1.7-acre ground-mounted solar array, and a 2-MW battery energy storage system covering 0.14 acres with a capacity of 7,832 kWh. The project is designed to provide an alternative energy source for the SEWD Pump Station and offset energy usage from PG&E under the Net Billing Tariff. Lepton CS, LLC serves as the power provider responsible for the construction, operation, maintenance, and decommissioning of the facility and its supporting infrastructure, which includes electrical inverters, service boards, metering facilities, and interconnection to the PG&E Distribution System. Construction is expected to take approximately six months, and the facility is anticipated to generate power for 30 years or more with an option to extend. Once operational, the project will be automated with remote electronic monitoring of system health and production, requiring minimal onsite maintenance such as solar panel washing up to twice per year. The project is statutorily exempt from the California Environmental Quality Act (CEQA) as a ministerial project requiring only building permit approval and zoning compliance review. All activities must adhere to the San Joaquin County General Plan and Ordinance Code.

General Info

Lepton CS will build and operate a 2MW solar and battery facility for SEWD.

Agency

California → Stockton East Water District

Place of Performance

New Water Lane and East Main St, Stockton, CA, 95215

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Stockton East Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Stockton East Water District
Office AddressN/A
Contacts
David StrohmEngineering Technician
Garret HollingsworthProject Manager

Full Description

Show more
Construction and operation of an approximately 2.2-megawatt behind-the-meter solar photovoltaic energy generation facility across 5.3 acres with a 7,832 kWh battery energy and storage system to provide an alternative energy source for the SEWD Pump Station.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS