Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Heber 1 Parasitic Solar Energy Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Heber 1 Parasitic Solar Energy Project involves the development of a 20 megawatt solar energy facility and an interconnecting medium voltage cable line in unincorporated Imperial County, California. The facility is designed as a behind-the-meter system to provide parasitic load power to offset the auxiliary load of the existing Heber 1 Geothermal Plant, meaning it will not connect to or generate power for the transmission grid. The project will be located on approximately 121.44 acres of land, including a 106.19-acre solar field and a cable route of approximately 15.25 acres. Construction is anticipated to take 16 to 19 months starting in late 2025, spanning site preparation, project construction, and switch development and interconnection. The project is subject to a Conditional Use Permit and comprehensive environmental review under the California Environmental Quality Act. Key requirements include compliance with fugitive dust regulations, the implementation of a Water Quality Management Plan, and the execution of a Stormwater Pollution Prevention Plan. Extensive biological and cultural assessments have been conducted, including surveys for western burrowing owls, bat acoustics, and avian populations, as well as tribal cultural resource consultations. The project requires the use of approved botanical field surveyors and the implementation of a mandatory education program for all construction personnel. Additionally, the project applicant must participate in the Imperial County Public Benefit Program and enter into a public benefit agreement to cover associated costs and fees.

General Info

20MW solar project in Imperial County providing parasitic power to Heber 1 Geothermal.

Place of Performance

Dogwood Road / W. Cole Boulevard, Calexico, CA, 92249

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts3 people available
OfficeN/A
Organization / AgencyCalifornia → Imperial County
Office AddressN/A
Contacts
Sharyn HidalgoProject Manager
Alissa SanchezProject Manager

Interested Companies (1)

HDRTampa, Florida

Full Description

Show more
The project applicant proposes to develop a 20 megawatt solar energy facility and interconnecting cable line (gen-tie line) that would provide parasitic load to the existing Heber 1 Geothermal Plant. The solar energy facility would provide behind-the-meter power used to offset the auxiliary load of the existing Heber 1 Geothermal Plant. The solar energy facility would not connect to or generate power that will enter the transmission grid; rather, the solar energy facility would be entirely behind-the-meter and would serve as an integrated part of the operation of the existing Heber 1 Geothermal Plant. There are three route options proposed, of which only one will be chosen, for the medium voltage cable that would connect the new 20 MW solar energy facility to the existing Heber 1 Geothermal Plant.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → Imperial County

Same awarding agency

NAICS: 812930
SLED
Linn Parking & Storage Project (CUP #25-0015, MERG #00165, IS #25-0033)
Solicitation # CUP #25-0015, MERG #00165, IS #25-0033
The Linn Parking and Storage project, identified by Conditional Use Permit #25-0015, Lot Merger #00165, and Initial Study #25-0033, involves the expansion of a parking and storage facility located at 1624 Gateway Road in Calexico, California. The project will merge three contiguous parcels to create a 7.1-acre site designed to accommodate up to 140 trucks and trailers and 60 passenger vehicles. The facility will operate 24/7 with approximately eight employees and will include mini-storage units for receiving customer packages from delivery companies. The expansion aims to improve traffic circulation and site safety, with projected daily traffic of 60 trucks and 30 passenger vehicles accessing the site via Gateway Road. The project was approved on September 9, 2026, following an environmental review that resulted in a Negative Declaration under the California Environmental Quality Act. Construction is scheduled to begin on June 2, 2026, with a phased timeline including demolition, site preparation, grading, building construction, paving, and architectural coating, concluding in late November 2026. Key requirements include compliance with Imperial County Fire Department standards, the installation of fire-rated access roads and water systems, and the submission of hazardous material management plans. The applicant is responsible for all costs related to land acquisition, infrastructure relocations, and the payment of water, sewer, benefit impact, and traffic mitigation fees prior to the issuance of building or grading permits.
Parking Lots and Garages

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
The Towers LLC (CUP26-0006/IS26-0007)
Solicitation # CUP26-0006
The Towers, LLC is proposing the construction of a Wireless Communication Facility in Niland, California, located at 307 E. Winslow Rd. The project consists of a 120-foot-tall, non-reflective, galvanized sky-blue monopole tower and related equipment situated within a 50-foot by 50-foot leased and fenced area. The primary objective of the facility is to enhance Verizon's 5G and 4G LTE coverage in the Calipatria area, specifically along Highway 111. The installation includes a 6-foot chain-link fence for equipment screening, internal cabling, FAA-compliant aircraft warning lighting, and an adjacent IID transformer, while water and sewer services are not required. The project is managed under Conditional Use Permit CUP26-0006 and Initial Study IS26-0007 by the Imperial County Planning and Development Services Department. An environmental review conducted under CEQA guidelines resulted in a Negative Declaration, concluding that the project will not have significant environmental effects. The Imperial County Planning Commission approved the project on September 9, 2026, with a Notice of Determination filed on September 17, 2026. Key regulatory requirements include compliance with FCC RF exposure standards, National Electrical Code standards, and the ability to support the co-location of two additional carriers. The applicant has requested a 10-year permit term and is subject to site restoration requirements and potential public benefit agreements with the Imperial Valley Emergency Communication Authority.
Power and Communication Line and Related Structures Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 221116
SLED
CUP23-0020/IS23-0026-Dogwood Geothermal Energy Project
Solicitation # GEO Heber Field Co. 2 Wells 06052026
The Dogwood Geothermal Energy Project is located on approximately 125 acres about one mile south of Heber in Imperial County, California. The project encompasses the construction and operation of a geothermal plant, associated facilities, a geothermal fluid pipeline, and solar energy facilities, including a 15 MW solar facility and a 7 MW parasitic solar facility. The scope of work specifically involves the installation of geothermal production and injection wells, which includes preparing well pads, drilling and completing the wells, and connecting them to the pipeline network. Under solicitation GEO Heber Field Co. 2 Wells 06052026, CalGEM has approved permits for Heber Field Company to install two specific geothermal wells, identified by API numbers 02591586 and 02591587. The project is governed by the California Environmental Quality Act and is based on an Environmental Impact Report prepared and certified by the Imperial County Planning and Development Services in August 2025. Final approval for the project was granted by the Imperial County Board of Supervisors on August 5, 2025, with subsequent permit approvals from the California Geologic Energy Management Division issued on June 5, 2026. The project site is located at 855, 853, and 602 Dogwood Road, Heber, CA, and must adhere to all adopted mitigation measures and monitoring plans specified in the environmental documentation.
Geothermal Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02518/IS25-0022
Solicitation # PM#02518/IS#25-0022
Parcel Map #02518 and Initial Study #25-0022 involve the subdivision of an 8.83-acre agricultural property located at 604 W. Murphy Road in Imperial, California. The project, proposed by Josh Quintero and overseen by the Imperial County Planning and Development Services Department, aims to divide the land into four legal parcels to separate an existing shop and facilitate residential development. Parcel 1 will be approximately 4.85 acres, while Parcels 2, 3, and 4 will each be approximately 1.33 acres. Access to Parcel 1 and 4 will be via Murphy Road, and Parcels 2 and 3 will be accessed via Nance Road. The project has been processed under the California Environmental Quality Act, resulting in a Negative Declaration and a Notice of Determination stating that the subdivision will not have a significant environmental effect. Technical requirements include a parcel map prepared by a licensed California Land Surveyor or Civil Engineer using the North America Datum of 1983. Infrastructure mandates include the installation of an approved water supply for fire flow per California Fire Code, the construction of three driveways on Nance Road, and the installation of non-contiguous sidewalks. Additionally, the project requires a grading and drainage plan to prevent cross-parcel drainage and may necessitate financial security, such as a road improvement bond or letter of credit, for off-site improvements. Final recordation of the map is contingent upon providing a tax certificate and a subdivision guarantee.
Land Subdivision

POSTED

9 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
PM02516/IS25-0010 Edward S. & Linda L. Menvielle
Solicitation # PM#02516/IS#25-0010
Project PM#02516/IS#25-0010 involves the subdivision of a 214.31-acre agricultural property located at 1446 Carr Road in Calexico, California, into three legal parcels for family estate planning. The resulting subdivision will consist of Parcel 1 at approximately 82.65 acres, Parcel 2 at 60.69 acres, and Parcel 3 at 70.97 acres. The property will remain in active agricultural production with direct legal and physical access provided via Carr Road. The Imperial County Planning Commission approved the project on July 23, 2025, following an Initial Study and Negative Declaration under the California Environmental Quality Act which concluded that the project would not result in significant environmental effects. The project is administered by the Imperial County Planning and Development Services Department and requires the submission of a Parcel Map prepared by a California Licensed Land Surveyor or Civil Engineer to the Department of Public Works for review and recordation. Technical requirements for the survey include adherence to the North America Datum of 1983 and connections to at least two Continuously Operating Reference Stations of the California Real Time Network. Additionally, the applicant must provide a tax certificate from the Tax Collector's Office, a subdivision guarantee no older than three months, and file a corner record with the county surveyor. Compliance with standards from the Imperial Irrigation District and the Imperial County Fire/OES Department is mandatory to ensure all impacts remain less than significant.
Land Subdivision

POSTED

10 months ago

DEADLINE

N/A
View Details
NAICS: 237110
SLED
CUP25-0009/IS25-0023 Winterhaven County Water District
Solicitation # CUP25-0009
The Winterhaven County Water District is implementing project CUP25-0009/IS25-0023 to replace Water Well No. 2 and upgrade its water treatment plant at 495 Third Avenue, Winterhaven, California. This project is critical for restoring compliance with California Title 22 drinking water regulations, which require two independent water sources to ensure public health, sanitation, and fire protection. The current system relies solely on Well No. 3, as Well No. 2 failed due to structural issues. The new well will be drilled to approximately 500 feet with a 10-inch casing and an estimated production capacity of 400 gallons per minute, or 645.20 acre-feet per year. Additional improvements include a new submersible pump, electrical systems, a concrete pad, a steel shade structure, and updated perimeter fencing and gates to better remove manganese and total dissolved solids. The project was approved by the Imperial County Planning Commission on December 18, 2025, following an environmental review that resulted in a Negative Declaration, indicating no significant environmental effects. The scope of work includes adherence to Imperial County Fire Department and ICDPW drainage standards, as well as specific operational requirements for shielded night lighting and secure waste disposal. Financial estimates for the project include various construction divisions for the administration building, such as general requirements at 88,981.28 dollars and finishes at 77,402.47 dollars, along with 20,000 dollars for legal counsel and 10,164 dollars for environmental report services. The project serves approximately 107 residential connections, 22 commercial connections, and a 495-space RV park.
Water and Sewer Line and Related Structures Construction

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 237210
SLED
Parcel Map (PM) #02520/IS25-0032
Solicitation # PM02520
Parcel Map #02520 and Initial Study #25-0032 involve a proposal by MACC CO, LLC to subdivide a vacant 135-acre parcel, identified as APN 040-380-020-000, into two separate industrial parcels. Parcel 1 will consist of 67.50 acres and Parcel 2 will consist of 67.56 acres. The primary objective of this subdivision is to legally establish independent parcels and improve marketability. The property is located in Imperial County, California, specifically northeast of the City of Imperial near Highway 111 and Harris Road, within the Mesquite Lake Specific Plan Area. Both parcels are intended to remain designated for Industrial Use under the ML-1-3-RE zoning classification, and no development or zone changes are requested at this time. The project has undergone environmental review in accordance with the California Environmental Quality Act (CEQA). An Initial Study and Negative Declaration were prepared, concluding that the subdivision would not result in significant environmental effects. This determination was supported by a Notice of Determination dated December 19, 2025, following approval by the Imperial County Planning Commission. While Caltrans provided comments regarding traffic operations and safety along State Route 111, the final notice confirms that no Environmental Impact Report was required and no specific mitigation monitoring plans were adopted. The project is managed by the Imperial County Planning and Development Services Department.
Land Subdivision

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
CUP 98-0022 Mesquite Mine Expansion
Solicitation # 24-0001
Western Mesquite Mines, Inc. is proposing the Rainbow East Exploration Project on Bureau of Land Management-administered lands in Imperial County, California. This short-term exploratory drilling program involves the construction of up to 22 drill pads for 23 exploration holes, each featuring a lined sump for fluids and cuttings. The project includes the creation of five new short-term access roads totaling 4,500 linear feet and the widening of approximately 1,315 linear feet of BLM Route 949. Approximately 91,000 pounds of material will be removed for testing, resulting in a total surface disturbance of 2.34 acres over a period of up to 24 months. All short-term disturbances will be reclaimed upon completion, and no permanent mining facilities or mineral production are proposed. The project is managed by Imperial County and is subject to the Surface Mining and Reclamation Act through Reclamation Plan No. 24-0001. Environmental reviews, including a CEQA Initial Study and an addendum to the 2002 FEIR/EIS, have concluded that the exploration activities will not result in new significant environmental effects. Additionally, the broader Mesquite Mine Expansion is governed by an Incidental Take Permit from the California Department of Fish and Wildlife to address the impact on 456 acres of endangered desert tortoise habitat. The overall project expiration date has been extended to December 31, 2031.
Environmental Consulting Services

POSTED

11 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS