Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

CUP25-0009/IS25-0023 Winterhaven County Water District

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Winterhaven County Water District is implementing project CUP25-0009/IS25-0023 to replace Water Well No. 2 and upgrade its water treatment plant at 495 Third Avenue, Winterhaven, California. This project is critical for restoring compliance with California Title 22 drinking water regulations, which require two independent water sources to ensure public health, sanitation, and fire protection. The current system relies solely on Well No. 3, as Well No. 2 failed due to structural issues. The new well will be drilled to approximately 500 feet with a 10-inch casing and an estimated production capacity of 400 gallons per minute, or 645.20 acre-feet per year. Additional improvements include a new submersible pump, electrical systems, a concrete pad, a steel shade structure, and updated perimeter fencing and gates to better remove manganese and total dissolved solids. The project was approved by the Imperial County Planning Commission on December 18, 2025, following an environmental review that resulted in a Negative Declaration, indicating no significant environmental effects. The scope of work includes adherence to Imperial County Fire Department and ICDPW drainage standards, as well as specific operational requirements for shielded night lighting and secure waste disposal. Financial estimates for the project include various construction divisions for the administration building, such as general requirements at 88,981.28 dollars and finishes at 77,402.47 dollars, along with 20,000 dollars for legal counsel and 10,164 dollars for environmental report services. The project serves approximately 107 residential connections, 22 commercial connections, and a 495-space RV park.

General Info

Winterhaven County Water District will replace Well 2 and upgrade its treatment plant.

Agency

California → Imperial County

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Third Avenue, CA, 92283

Set-Aside

NONE

Documents

(5)

Notice of Determination for CUP25-0009 Winterhaven Well Project

PDFdetermination-and-findings

CUP25-0009/IS25-0023 Winterhaven County Water District Notice of Completion

PDFnotice-of-completion

Winterhaven County Water District CUP25-0009 IS25-0023 Environmental Summary

PDFenvironmental-summary

CUP25-0009 IS25-0023 Notice of Intent for Winterhaven Water District

PDFnotice-of-intent

Winterhaven County Water District Environmental Initial Study and Negative Declaration

PDFenvironmental-initial-study

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
Contacts

Full Description

Show more
The Winterhaven County Water District applied for a Conditional Use Permit (CUP) for the replacement of a Water Well & improvements of the Water Treatment Plant. The WCWD provides potable water to the small rural community of Winterhaven, California, including approximately 107 residential connections, 22 commercial connections, and a 495-space RV park. The District's system currently relies entirely on Well No. 3, which produces about 350 gallons per minute (gpm). Well No. 2, which was installed about 40 years ago, has been out of service since 2016 due to sand infiltration caused by structural failure of its well screen and gravel pack. Operating only a single water supply well puts the District out of compliance with California Title 22 drinking water regulations, which require at least two independent water sources to ensure reliable and secure water service. This deficiency poses a risk to public health, sanitation, and fire protection if the existing well were to fail or require maintenance. In addition, the system has experienced high manganese and total dissolved solids (TDS) levels, and the current treatment plant requires upgrades to reliably remove manganese. To correct these deficiencies, WCWD will construct a new groundwater well to replace Well No. 2, located at the existing treatment plant site about 50 feet from the other well. The new Well No. 2 will be drilled to about 500 feet deep, with a 10-inch casing and an estimated production capacity of 400 GPM. (645.20 ac-ft/yr). It will include: A new submersible well pump and electrical system, pipeline connections into the existing treatment and distribution systems, a concrete pad and steel shade structure for protection, replacement of the perimeter fencing and gate around the treatment plant. The replacement of Well No. 2 is essential to restoring a safe, reliable, and compliant water supply system for the Winterhaven community.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 12 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 12 hours ago

DEADLINE

in about 20 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS