Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Soda Mountain Solar Project

Forecast
24-OPT-03State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

I-15 and Rasor Road, CA, 92309

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Lisa WorrallSenior Environmental Planner

Full Description

Show more
Soda Mountain Solar, LLC (applicant), proposes to construct, operate, and maintain a utility-scale solar photovoltaic (PV) electrical generating and storage facility and associated infrastructure (operations and maintenance buildings, stormwater infrastructure, and related infrastructure improvements) to generate and deliver renewable electricity to the statewide electricity transmission grid. The project would generate up to 300 megawatts (MW) of renewable energy and include up to 300 MW/1,200 MW-hours (MWh) of battery storage. The batteries would be lithium ion or similar. The project would include a switchyard and substation. The power produced by the project would be conveyed to the regional electrical grid through an interconnection with the existing Mead-Adelanto 500-kilovolt (kV) transmission line operated by the Los Angeles Department of Water and Power (LADWP). The approximately 200 foot wide, 1-mile long 500 kV gen-tie line would run from the project substation, just southeast of I-15, to the switchyard and then to the point of interconnection with the existing LADWP Mead-Adelanto transmission line. A small segment of the gen-tie line, approximately 450 feet, would cross I-15.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

More opportunities from California → Energy Commission

Same awarding agency

NAICS: 237130
SLED
Corby Battery Energy Storage System Project
Solicitation # 24-OPT-05
North Bay Interconnect, LLC and Corby Energy Storage, LLC are proposing the construction and operation of the Corby Battery Energy Storage System (BESS) Project in Solano County, California. The facility will feature a 300-megawatt, 1,200-megawatt-hour system utilizing LG Energy Solution lithium-ion batteries. The project site encompasses approximately 40.3 acres and includes a project substation, inverters, and ancillary infrastructure such as sound barriers, stormwater retention basins, and a SCADA system. Interconnection to the Pacific Gas and Electric Company Vaca-Dixon Substation will be achieved via a 1.1-mile, 230-kilovolt generation tie line consisting of both overhead and underground segments. The initial installation will include 303 BESS enclosures, with planned augmentations every three years starting around year six to maintain output, eventually reaching up to 341 enclosures. The project is overseen by the California Energy Commission and is subject to rigorous environmental and regulatory compliance, including the California Environmental Quality Act and Assembly Bill 205 regarding prevailing wages and a skilled workforce. Construction is estimated to take 14 to 15 months. Technical standards for the build follow a comprehensive list of codes including NFPA, ANSI, and ASME, with oversight provided by a Delegate Chief Building Official and a Safety Monitor to ensure Cal OSHA compliance. Hazardous materials transportation must adhere to DOT and PHMSA regulations. The project involves a minimum investment of 100 million dollars in California and has undergone extensive review by agencies such as the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on special-status species and tribal cultural resources.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
Potentia-Viridi Battery Energy Storage System
Solicitation # 24-OPT-04
The Potentia-Viridi Battery Energy Storage System (BESS) project, identified by solicitation number 24-OPT-04, involves the construction and operation of a large-scale lithium-ion battery storage facility located on approximately 102 acres of retired agricultural land in eastern Alameda County, California. The facility is designed to provide 400 megawatts of power with an energy storage capacity of up to 3,200 megawatt-hours. Key infrastructure components include modular and containerized BESS enclosures, an operations and maintenance building, a project substation, and a 500 kilovolt overhead generation tie-in line that will connect to the PG&E Tesla Substation. The project is being overseen by the California Energy Commission (CEC) under its Opt-In Certification Program and requires compliance with the California Environmental Quality Act (CEQA). The project development process has involved extensive regulatory review and consultation with various state agencies to address environmental, cultural, and resource impacts. The California Department of Fish and Wildlife and the Central Valley Regional Water Quality Control Board have provided oversight regarding biological resources, habitat assessments for special-status species, and water quality protection. Additionally, the Native American Heritage Commission has emphasized the need for tribal cultural resource protection and compliance with AB 52 and SB 18. The project must adhere to strict safety and environmental standards, including Department of Transportation regulations for hazardous materials transportation, EPA methods for air quality testing, and specific mitigation measures for agricultural land preservation and wildlife habitat. Construction of the facility is expected to create prevailing wage jobs and requires specialized biological monitoring for species such as the burrowing owl and Crotch's bumble bee.
Power and Communication Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS