INFINITE: Integrating Flexible Interconnection Technologies for Electrified Resilience

Forecast
EPC-26-011State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Reservation Rd, Colusa, CA, 95932

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Sean AnayahCommission Agreement Manager
Alex KillamProgram Manager

Full Description

Show more
The purpose of this Agreement is to fund the development and demonstration of an advanced microgrid/distributed energy resource (DER) controller for flexible interconnection and to validate its performance using an emulated utility distributed energy resource management system (DERMS), advancing the controller from a Technology Readiness Level (TRL) 3 to TRL 7. This project will demonstrate a replicable approach to reduce interconnection timelines and costs while enhancing grid resilience for tribal and disadvantaged communities. This Agreement will also enable expansion of housing at the Colusa Indian Community, which is currently constrained by limited electricity infrastructure capacity, by enabling flexible interconnection in lieu of immediate long lead time upgrades. The proposed project will be constructed entirely on Tribal Trust Land owned by the Cachil Dehe Band of Wintun Indians of the Colusa Indian Community Council (CICC). As a sovereign tribal government, CICC serves as the Authority Having Jurisdiction (AHJ) for all construction, electrical, environmental, and safety approvals. Accordingly, no county or state building permits are required, and no local jurisdiction has discretionary approval authority over the project. Tribal approval processes covering construction, electrical work, trenching, grading, environmental review, and cultural resource protection will be completed following the 60–90% engineering design milestone and prior to construction. These tribal permits are underway but not yet complete, with preliminary site plans, distribution layouts, and equipment specifications already under review by Colusa Indian Energy and the Colusa Indian Community Council. The project occurs on previously disturbed land within an existing housing development envelope, and the scope consists primarily of underground electrical distribution, battery energy storage, and associated electrical upgrades to meet utility interconnection requirements. Based on this scope, the project should qualify for a Notice of Exemption (NOE) under CEQA (e.g., Class 3 – New Utility Extensions; Class 4 – Minor Alterations to Land; or Class 32 – Infill Development). Construction is expected to begin in 2028, following completion of final design, equipment procurement, and tribal approvals, and to be completed, including commissioning and site acceptance testing, by approximately October 2028. Active construction is anticipated to last approximately three months, consisting of approximately 30 working days for the medium-voltage distribution scope and approximately four weeks for installation of the battery energy storage system (BESS) and associated equipment, followed by approximately four weeks of commissioning. The project is expected to operate for a minimum of 10 years, with an expected operating life of approximately 20 years, beginning in late 2028. Total estimated ground disturbance for the microgrid equals approximately 9,000 square feet, of which approximately 8,250 square feet is underground trenching for approximately 5,500 linear feet of medium-voltage conduit; the remainder consists of concrete equipment pads, including approximately five transformer pads (approximately 6 feet by 6 feet each), one to two sectionalizing cabinet foundations (approximately 5 feet by 15 feet each), and pads for the BESS (approximately 29 feet by 5.5 feet), switchgear (approximately 10 feet by 6 feet), and control panel (approximately 5 feet by 5 feet). The entire microgrid system is to be located on previously disturbed and developed land comprising graded dirt and gravel, entirely on Tribal land. Sitework is expected to require access by approximately 5 to 10 light, medium, and heavy-duty construction vehicles each day for several weeks during active excavation for equipment pads and trenching, and deliveries of equipment and materials for the project. These vehicles will include personal vehicles for construction personnel as the bulk of the traffic, with soil haul trucks (approximately 30 total truckloads of soil import/export), concrete trucks, delivery vehicles, and similar being the remainder. Previously disturbed vacant land in the immediate vicinity will be designated for parking and staging of equipment and materials during construction activities; the site has ample staging and parking area. Major equipment delivery is anticipated to require approximately three to five truck deliveries, including one BESS enclosure approximately 29 feet in length that will be offloaded and set by crane in approximately one mobilization; no major equipment is anticipated on site following installation. During commissioning, staff will require approximately two vehicle trips per day, for approximately one month. Fewer than 20 construction workers will be on-site during active construction, consisting of approximately 9 workers for the medium-voltage distribution scope (an underground/concrete crew of 6 and 3 electricians) and approximately 4 to 6 workers for the BESS scope, with approximately 2 to 4 personnel on-site during commissioning and testing activities. No permanent operational staff are anticipated; the system will be remotely monitored, with periodic maintenance visits. No new security fencing is planned as part of the project; all equipment will be located within an existing secured area. Trenching for electrical conduits and conductors between the battery pad, equipment locations, and existing facilities will be required. Minor excavations of a few feet in depth or less will be required for installation of concrete pad-mounted equipment. Minor clearing, grubbing, and leveling will be required. With respect to hazardous equipment and materials, the BESS uses lithium iron phosphate (LFP) battery chemistry and will be a UL 9540-listed system housed in an outdoor-rated enclosure with integrated fire detection and safety features consistent with NFPA 855; no bulk hazardous materials will be stored on site, and hazardous materials during construction are limited to fuels and lubricants typical of standard construction equipment. The microgrid equipment will be housed in outdoor-rated, pad-mounted enclosures, and no new occupied structures are planned for the project.

More opportunities from California → Energy Commission

Same awarding agency

NAICS: 237130
SLED
Corby Battery Energy Storage System Project
Solicitation # 24-OPT-05
North Bay Interconnect, LLC and Corby Energy Storage, LLC are proposing the construction and operation of the Corby Battery Energy Storage System (BESS) Project in Solano County, California. The facility will feature a 300-megawatt, 1,200-megawatt-hour system utilizing LG Energy Solution lithium-ion batteries. The project site encompasses approximately 40.3 acres and includes a project substation, inverters, and ancillary infrastructure such as sound barriers, stormwater retention basins, and a SCADA system. Interconnection to the Pacific Gas and Electric Company Vaca-Dixon Substation will be achieved via a 1.1-mile, 230-kilovolt generation tie line consisting of both overhead and underground segments. The initial installation will include 303 BESS enclosures, with planned augmentations every three years starting around year six to maintain output, eventually reaching up to 341 enclosures. The project is overseen by the California Energy Commission and is subject to rigorous environmental and regulatory compliance, including the California Environmental Quality Act and Assembly Bill 205 regarding prevailing wages and a skilled workforce. Construction is estimated to take 14 to 15 months. Technical standards for the build follow a comprehensive list of codes including NFPA, ANSI, and ASME, with oversight provided by a Delegate Chief Building Official and a Safety Monitor to ensure Cal OSHA compliance. Hazardous materials transportation must adhere to DOT and PHMSA regulations. The project involves a minimum investment of 100 million dollars in California and has undergone extensive review by agencies such as the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on special-status species and tribal cultural resources.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
Potentia-Viridi Battery Energy Storage System
Solicitation # 24-OPT-04
The Potentia-Viridi Battery Energy Storage System (BESS) project, identified by solicitation number 24-OPT-04, involves the construction and operation of a large-scale lithium-ion battery storage facility located on approximately 102 acres of retired agricultural land in eastern Alameda County, California. The facility is designed to provide 400 megawatts of power with an energy storage capacity of up to 3,200 megawatt-hours. Key infrastructure components include modular and containerized BESS enclosures, an operations and maintenance building, a project substation, and a 500 kilovolt overhead generation tie-in line that will connect to the PG&E Tesla Substation. The project is being overseen by the California Energy Commission (CEC) under its Opt-In Certification Program and requires compliance with the California Environmental Quality Act (CEQA). The project development process has involved extensive regulatory review and consultation with various state agencies to address environmental, cultural, and resource impacts. The California Department of Fish and Wildlife and the Central Valley Regional Water Quality Control Board have provided oversight regarding biological resources, habitat assessments for special-status species, and water quality protection. Additionally, the Native American Heritage Commission has emphasized the need for tribal cultural resource protection and compliance with AB 52 and SB 18. The project must adhere to strict safety and environmental standards, including Department of Transportation regulations for hazardous materials transportation, EPA methods for air quality testing, and specific mitigation measures for agricultural land preservation and wildlife habitat. Construction of the facility is expected to create prevailing wage jobs and requires specialized biological monitoring for species such as the burrowing owl and Crotch's bumble bee.
Power and Communication Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS