Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Rivian, LLC – NEVI 3 Project

Forecast
RNEV-26-001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Jonathan BobadillaEnergy Commission Specialist
Avin ArefzadehAdministrator and Project Manager

Full Description

Show more
Through this project, Rivian will install 94 direct current fast charger (DCFC) electric vehicle charging ports at nine sites in California, each located within one mile of an Alternative Fuel Corridor ramp as required by the National Electric Vehicle Infrastructure (NEVI) formula program.

More opportunities from California → Energy Commission

Same awarding agency

NAICS: 237130
SLED
Corby Battery Energy Storage System Project
Solicitation # 24-OPT-05
North Bay Interconnect, LLC and Corby Energy Storage, LLC are proposing the construction and operation of the Corby Battery Energy Storage System (BESS) Project in Solano County, California. The facility will feature a 300-megawatt, 1,200-megawatt-hour system utilizing LG Energy Solution lithium-ion batteries. The project site encompasses approximately 40.3 acres and includes a project substation, inverters, and ancillary infrastructure such as sound barriers, stormwater retention basins, and a SCADA system. Interconnection to the Pacific Gas and Electric Company Vaca-Dixon Substation will be achieved via a 1.1-mile, 230-kilovolt generation tie line consisting of both overhead and underground segments. The initial installation will include 303 BESS enclosures, with planned augmentations every three years starting around year six to maintain output, eventually reaching up to 341 enclosures. The project is overseen by the California Energy Commission and is subject to rigorous environmental and regulatory compliance, including the California Environmental Quality Act and Assembly Bill 205 regarding prevailing wages and a skilled workforce. Construction is estimated to take 14 to 15 months. Technical standards for the build follow a comprehensive list of codes including NFPA, ANSI, and ASME, with oversight provided by a Delegate Chief Building Official and a Safety Monitor to ensure Cal OSHA compliance. Hazardous materials transportation must adhere to DOT and PHMSA regulations. The project involves a minimum investment of 100 million dollars in California and has undergone extensive review by agencies such as the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on special-status species and tribal cultural resources.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
Potentia-Viridi Battery Energy Storage System
Solicitation # 24-OPT-04
The Potentia-Viridi Battery Energy Storage System (BESS) project, identified by solicitation number 24-OPT-04, involves the construction and operation of a large-scale lithium-ion battery storage facility located on approximately 102 acres of retired agricultural land in eastern Alameda County, California. The facility is designed to provide 400 megawatts of power with an energy storage capacity of up to 3,200 megawatt-hours. Key infrastructure components include modular and containerized BESS enclosures, an operations and maintenance building, a project substation, and a 500 kilovolt overhead generation tie-in line that will connect to the PG&E Tesla Substation. The project is being overseen by the California Energy Commission (CEC) under its Opt-In Certification Program and requires compliance with the California Environmental Quality Act (CEQA). The project development process has involved extensive regulatory review and consultation with various state agencies to address environmental, cultural, and resource impacts. The California Department of Fish and Wildlife and the Central Valley Regional Water Quality Control Board have provided oversight regarding biological resources, habitat assessments for special-status species, and water quality protection. Additionally, the Native American Heritage Commission has emphasized the need for tribal cultural resource protection and compliance with AB 52 and SB 18. The project must adhere to strict safety and environmental standards, including Department of Transportation regulations for hazardous materials transportation, EPA methods for air quality testing, and specific mitigation measures for agricultural land preservation and wildlife habitat. Construction of the facility is expected to create prevailing wage jobs and requires specialized biological monitoring for species such as the burrowing owl and Crotch's bumble bee.
Power and Communication Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS