Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Corby Battery Energy Storage System Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

North Bay Interconnect, LLC and Corby Energy Storage, LLC are proposing the construction and operation of the Corby Battery Energy Storage System (BESS) Project in Solano County, California. The facility will feature a 300-megawatt, 1,200-megawatt-hour system utilizing LG Energy Solution lithium-ion batteries. The project site encompasses approximately 40.3 acres and includes a project substation, inverters, and ancillary infrastructure such as sound barriers, stormwater retention basins, and a SCADA system. Interconnection to the Pacific Gas and Electric Company Vaca-Dixon Substation will be achieved via a 1.1-mile, 230-kilovolt generation tie line consisting of both overhead and underground segments. The initial installation will include 303 BESS enclosures, with planned augmentations every three years starting around year six to maintain output, eventually reaching up to 341 enclosures. The project is overseen by the California Energy Commission and is subject to rigorous environmental and regulatory compliance, including the California Environmental Quality Act and Assembly Bill 205 regarding prevailing wages and a skilled workforce. Construction is estimated to take 14 to 15 months. Technical standards for the build follow a comprehensive list of codes including NFPA, ANSI, and ASME, with oversight provided by a Delegate Chief Building Official and a Safety Monitor to ensure Cal OSHA compliance. Hazardous materials transportation must adhere to DOT and PHMSA regulations. The project involves a minimum investment of 100 million dollars in California and has undergone extensive review by agencies such as the California Department of Fish and Wildlife and the Native American Heritage Commission to mitigate impacts on special-status species and tribal cultural resources.

General Info

North Bay Interconnect and Corby Energy will build a 300MW battery system in California.

Agency

California → Energy Commission

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Kilkenny Rd and Byrnes Rd, Vacaville, CA, 95867

Set-Aside

NONE

Documents

(9)

Corby Battery Energy Storage System Project Notice of Completion

PDFnotice-of-completion

CDFW Comments on Corby Battery Energy Storage System Project NOP

PDFcomment-letter

Notice of Availability for Corby Battery Energy Storage System Project Draft EIR

PDFnotice-of-availability

NAHC Comment on Corby Battery Energy Storage System Project

PDFcomment

Corby Battery Energy Storage System Project Staff Assessment July 2026

PDFstaff-assessment

2025101073_RWQCB_Comment on Corby Battery Energy Storage System Project

PDFcomment

Notice of Completion for Corby Battery Energy Storage System Project

PDFnotice-of-completion

Notice of Preparation Comments for Corby Battery Energy Storage System Project

PDFcomment

Notice of Preparation for Corby Battery Energy Storage System Project EIR

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Energy Commission
Contacts2 people available
OfficeN/A
Organization / Agency
California → Energy Commission
Office AddressN/A
Contacts
Renee LongmanProject Manager
Stephen AhnProject Director

Full Description

Show more
North Bay Interconnect, LLC and Corby Energy Storage, LLC (applicant), propose to construct, own, and operate the Corby Battery Energy Storage System (BESS) Project (Corby BESS or project). The BESS facility would be constructed on an approximately 40.3-acre parcel in Solano County, California. The project would include a 300-megawatt (MW), 1,200-megawatt-hour (MWh) battery energy storage system (BESS), associated project substation, inverters, and other ancillary facilities, such as fencing, sound barrier, roads, optional groundwater well, water tank, stormwater retention basins, storage containers, and a supervisory control and data acquisition (SCADA) system. The project would connect to the Pacific Gas and Electric Company (PG&E;) Vaca-Dixon Substation, northwest of the project site and across Interstate 80 (I-80), via a 1.1-mile-long 230-kilovolt (kV) generation tie (gen-tie) line, portions of which would be installed overhead and underground. The underground portions of the gen-tie line would run east-west parallel to and crossing Kilkenny Road, either within acquired easements on adjacent parcels or within the City of Vacaville roadway right-of-way. The overhead portions would include two structures on the project site, four structures between Kilkenny Road and I-80 on private land owned by the applicant, and up to four structures north of I-80 on PG&E;’s Vaca-Dixon Substation property, for a total of up to 10 overhead gen-tie structures. To accommodate the interconnection of the project and other future projects, PG&E; is currently performing network upgrades which include grading, construction of concrete pads, and relocating existing structures within the Vaca-Dixon Substation. Specifically for the project, PG&E; would install a new 230-kV double bus bay structure (hereinafter “Corby Bay”) with associated foundations and supports on approximately 0.6 acres p

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 7 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
SLED
Radio Tower & Building Tower, San Antonio DHQ - SAT
Solicitation # 15-470426753
The Texas Department of Transportation (TxDOT) is soliciting bids for a turnkey communications site project at the San Antonio DHQ in Bexar County, Texas. This State Let Building Contract involves the demolition of an existing 300ft tower and the design, fabrication, and installation of a new 350ft self-supporting tower, a 10x20 equipment shelter, a 30KW diesel generator, and a heavy hurricane fence. The scope includes all civil site work, power and data hookups, antenna systems, and the installation of Drake Lighting for FAA compliance. All technical drawings and design calculations must be sealed and signed by a Texas licensed engineer and adhere to ANSI/TIA/EIA-222H and AISI structural standards. Bids are due by November 3, 2026, at 12:00 PM CT and must be submitted via the Euna Procurement Portal. The contract will be awarded to the lowest responsive bidder. Required submission documents include a lump sum bid form, a bid bond of 20,000, a HUB subcontracting plan, and a signed E-Verify memorandum. The project has a contract duration of 365 days, and the agency will not disclose an estimated construction cost. Contractors must comply with the Davis-Bacon Act, Texas Government Code Chapter 2258 for prevailing wages, and TxDOT's third-party ethics and Buy Texas requirements. Payment is processed through TxDOT forms and requires the submission of an updated work progress schedule.
Texas Department Of Transportation

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
International
Fibre Optic Infrastructure Expansion 80 Avenue - 202A Street to 216 Street
Solicitation # 26-160
The Township of Langley is soliciting tenders for solicitation number 26-160, titled Fibre Optic Infrastructure Expansion 80 Avenue - 2020A Street to 216 Street. The primary scope of work involves the supply and installation of underground communication conduit infrastructure from 212 Street to 216 Street and the installation of fibre optic cabling from 202A Street to 216 Street along 80 Avenue. This includes the installation of approximately 800 meters of fibre optic duct via horizontal directional drilling, with pavement restoration required at entry and exit pit locations in accordance with the Township's Subdivision And Development Servicing Bylaw 2019 No: 5382. The project includes optional work to connect nearby traffic intersection cabinets to the new fibre optic trunk cable at seven specific locations along 80 Avenue, ranging from 202A Street to 216 Street. This optional scope encompasses the supply and installation of 12F SM fibre optic cable between FOSC vaults, wall mount patch panels, accessories, fusion splices, and cable testing. Contractors must adhere to the project Erosion Control plan for water discharge and follow the Township's Archaeological Chance Find Management Guidelines if any artifacts or remains are discovered. The response deadline for this solicitation is October 14, 2026.
Township of Langley

POSTED

3 days ago

DEADLINE

in 23 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District is conducting market research via Sources Sought Announcement W9128F26SM024 for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This initiative involves the construction of approximately 1,750 to 2,225 miles of underground communications infrastructure, including microducts, manholes, and handholes with a minimum bury depth of six feet, to support the Ground Based Strategic Deterrent system. The project includes complex civil works such as crossings of railways, rivers, and roadways, as well as environmental and cultural support, including Supplemental Environmental Impact Statements and coordination with Tribal Cultural Specialists. The estimated magnitude for the overall effort is between 1.4 billion and 2.0 billion dollars, with incremental funding expected from fiscal year 2029 through approximately 2033. The government intends to utilize a Progressive Design-Build Other Transaction Agreement under 10 U.S.C. Section 2808a, employing a Qualifications Based Selection process that prioritizes team composition, past relevant experience, and innovative problem-solving over price. Interested firms under NAICS 237130 are requested to submit an industry questionnaire and a capability statement not exceeding 12 pages by the response deadline of September 24, 2026. Awardees must be registered in SAM.gov and comply with Davis-Bacon labor laws, OSHA, and EM 385-1-1 safety requirements. The acquisition strategy emphasizes a collaborative, flexible approach to manage risks associated with Montana's specific construction seasons and stringent environmental and cultural resource protections.
W071 Endist Omaha

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS