Electrical Rubber-Tired Gantry (eRTG) Crane Runway Construction & Installation of Electrical Infrastructure
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Port of Long Beach is undertaking a project for the construction and extension of concrete runways and the installation of electrical infrastructure to support four new electrified rubber-tired gantries (eRTG) at Pier J, located at 1521 Pier J Avenue East in Long Beach, California. The scope of work includes extending four existing concrete runways on Pier J South, each approximately 5 feet wide and 910 feet long, and constructing four new runways on Pier J North, each 6 feet wide and 1,540 feet long. Additionally, the project requires the installation and connection of eRTG electrical conduit and infrastructure from the runways to existing substations within the terminal, which involves trenching, backfilling, and the restoration of surfaces. This project is classified as a forecast under NAICS code 237130. It has been granted a Notice of Exemption under the California Environmental Quality Act (CEQA) Guidelines, specifically citing Sections 15301, 15303, and 15304, confirming that the work involves minor alterations and new construction with negligible expansion and requires no further environmental review. The lead agency is the Port of Long Beach City of Long Beach Harbor Department Environmental Planning Division, with primary coordination handled by Tyler Hanks and equipment maintenance oversight provided by Adam Young.
General Info
Agency
NAICS
Place of Performance
Long Beach, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
