Encino Reservoir Floating Solar Pilot Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Encino Reservoir Floating Solar Pilot Project involves the installation of a 5-megawatt floating solar panel array on the southwest portion of the reservoir, complemented by a 30-kilowatt ground-mount photovoltaic system on the same property. All electrical infrastructure—including inverters, transformers, and switchgear—will be situated adjacent to the ground-mount system and connected to the existing 34.5-kilovolt above-ground distribution line within the reservoir property. Additionally, a 5-megawatt, 20-megawatt-hour iron-flow battery energy storage system will be deployed on a 6,500-square-foot area north of the reservoir to support grid stability and energy dispatch. Construction is scheduled from July 2026 through July 2027, with distinct phases for floating solar, electrical connections, inverter installation, system energization, battery deployment, and ground-mount solar completion. The project is led by the Los Angeles Department of Water and Power, with environmental compliance as a central focus under CEQA and state regulations, requiring mitigation for air quality, biological resources, water quality, noise, and greenhouse gas emissions. All environmental assessments and mitigation plans are documented in eight technical appendices covering air quality, biological resources, wetland delineation, special-status plant surveys, avian habitat impacts, cultural resources, greenhouse gas emissions, and noise and vibration. Inspection and acceptance occur on-site at the reservoir property, governed by standards from the Regional Water Quality Control Board, California Air Resources Board, South Coast Air Quality Management District, Clean Water Act, and federal NAAQS, with oversight conducted by LADWP as the Lead Agency. The primary point of contact for submittals and coordination is David Norris, Environmental Planning and Assessment Manager, reachable via mail at 111 North Hope Street, Los Angeles, CA 90012, by phone at (213) 367-3509, or by email at david.norris@ladwp.com. Proposals for public comment are due by January 13, 2026, and must be submitted either electronically through the LADWP environmental notices portal or as 15 hard copies along with a summary form. No formal contract pricing, line items, or federal procurement clauses are specified in the documentation, and while state environmental certifications under the Clean Water Act are provided, no federal acquisition representations, socioeconomic certifications, or payment terms are included. The project reflects
General Info
Agency
NAICS
Place of Performance
Encino Avenue at White Oak Avenue, Los Angeles, CA, 91316Set-Aside
Timeline
Organization & Contact Information
Interested Companies (1)
Full Description
Similar Contracts
Same NAICS industry code
