Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Santa Barbara Community College District Solar Power Array & Battery Energy Storage System Microgrid

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Barbara Community College District is implementing a solar power array and battery energy storage system microgrid at the Cliff Campus in Santa Barbara, California. This project involves the installation of 1.6 megawatts of carport-mounted solar arrays, battery energy storage systems, transformers, inverters, and related electrical infrastructure. The work will be concentrated within existing parking facilities on the East and West Campuses, specifically targeting Parking Lots 1A, 1B, 4A, 4B, 4C, and 4D. The primary objectives of the installation are to provide 8 to 24 plus hours of energy resilience, reduce the district's carbon footprint, and lower long-term energy costs through renewable energy generation. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from the California Environmental Quality Act pursuant to Categorical Exemption Class 1 for Existing Facilities, as the project occurs within previously developed areas with no expansion of use or new land disturbance. Project administration is managed by the Santa Barbara Community College District, with key coordination involving Rachel Hollander and Chris Renbarger. The project is classified under NAICS code 221114 and was formally documented via a Notice of Exemption dated June 4, 2026.

General Info

SBCCD installing 1.6MW solar and battery microgrid for energy resilience and cost reduction.

Agency

California → Santa Barbara Community College District

Place of Performance

Santa Barbara, CA, 93109

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Barbara Community College District
Contacts3 people available
OfficeN/A
Organization / Agency
California → Santa Barbara Community College District
Office AddressN/A
Contacts
Aden FerilloAssociate Planner
Rachel HollanderSr. Planner
Michelle Castilloproject manager

Full Description

Show more
Notice of Exemption for the installation of solar photovoltaic carports, battery energy storage systems, transformers, inverters, and related electrical infrastructure within existing parking facilities on the East and West Campuses. The Board of Trustees of Santa Barbara City College has determined that the project is exempt from CEQA pursuant to the applicable categorical exemptions identified in the Notice of Exemption. The project includes the installation of 1.6 megawatts of carport-mounted solar arrays and associated battery energy storage systems across parking facilities on the East and West Campuses of Cliff Campus. The system will deliver 8-24+ hours of energy resilience, reduce carbon footprint, and lower long-term energy costs through renewable energy generation.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Request for Qualifications for Solar, Wind, Battery Storage, Microgrids, and other Clean Energy Technologies
Solicitation # 0000040569
The California Department of General Services is establishing a Qualified Vendors Pool (QVP) of energy service providers to design, install, operate, and maintain clean energy systems, including solar, wind, battery storage, and microgrids, on state-owned properties across California. This solicitation is a Request for Qualifications (RFQ) where vendors are evaluated on a pass/fail basis to enter the pool. Once qualified, vendors will be invited to compete for specific projects via future Requests for Proposals (RFPs). Projects will be categorized by size into Class 1 (under 0.50 MW), Class 2 (0.51 MW to 10.0 MW), and Class 3 (over 10.0 MW). Awarded projects will be implemented through a Site Lease Agreement (SLA) and a Power Purchase Agreement (PPA) with terms ranging from 20 to 25 years. Vendors must finance the projects with no upfront capital required from state agencies, selling the electrical output at a fixed price per kilowatt hour. Key requirements for qualification include being a creditworthy company in good standing with the California Secretary of State, providing a Darfur Contracting Act Certification, and demonstrating the ability to meet comprehensive insurance requirements. For future installations, vendors must hold appropriate California licenses, such as C-10 Electrical or C-46 Solar certifications.
California Department of General Services

POSTED

6 days ago

DEADLINE

in 2 months
View Details
NAICS: 221114
SLED
Operations Yard and Employee Parking Lot PV Solar and Battery Project (JN 225005)
Solicitation # JN 225005
The Operations Yard and Employee Parking Lot PV Solar and Battery Project, identified by JN 225005, is an initiative by the Padre Dam Municipal Water District located in Santee, California. The project involves the design and installation of a photovoltaic solar panel array, a battery storage system, and Level 2 EV charging stations. Solar panels will be mounted on existing canopy roofs or on newly constructed carport structures within the existing employee parking lot. The scope of work also includes minor alterations to existing structures and mechanical equipment, as well as necessary ADA upgrades. All construction and operational activities will take place within existing District property at active operations facilities and previously developed or disturbed areas. The primary objectives of this project are to improve energy efficiency, stabilize long-term energy costs, and reduce the environmental impacts associated with the District's energy consumption. All work must comply with all applicable codes, regulations, and standards. Regarding environmental regulatory compliance, the project has been granted a Notice of Exemption under CEQA Guidelines Sections 15301, 15303, and 15311, as the work constitutes minor alterations and the construction of new small structures without an expansion of use. The project is managed by the Director of Engineering and Planning, Lewis Clapp, and is situated at 9120 Carlton Oaks Drive in San Diego County.
Padre Dam Municipal Water District

POSTED

18 days ago

DEADLINE

N/A
View Details
NAICS: 221114
SLED
Conditional Use Permit No. PA-2500420
Solicitation # PA-2500420
Conditional Use Permit No. PA-2500420, managed by the San Joaquin County Community Development Department, authorizes the establishment of the North Locust Tree Road Solar Project in Lodi, California. Proposed by RPCA Solar 25, LLC, this utility-scale solar energy system will occupy approximately 18.5 acres of a 20-acre parcel classified as Prime Farmland. The project is designed to generate up to 4 megawatts of alternating current energy, which will be sold to Pacific Gas and Electric Company via an interconnection to their existing electrical distribution system located along the northwest boundary of the site. Construction is expected to take place over a three-year period. To mitigate the impact on agricultural land, the project utilizes driven steel piers for equipment mounting instead of traditional slab foundations, a method intended to prevent soil compaction and allow for the full restoration of agricultural use once the project's operational life concludes. Environmental management strategies include the use of drought-tolerant, pollinator-friendly seed mixes under and between solar rows to maintain soil health, promote stability, and reduce erosion. The project has undergone environmental assessments, including a Mitigated Negative Declaration and an Initial Study, to address impacts on biological resources, air quality, water quality, aesthetics, and greenhouse gas emissions, while ensuring coordination with the San Joaquin Council of Governments regarding habitat conservation and open space plans.
San Joaquin County

POSTED

18 days ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS