Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Award Notice opportunity from California was posted on August 15, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Sonrisa Solar Project

Awarded
2081-2025-003-04State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months

AI Contract Overview

Show more

The Sonrisa Solar Project, managed by the Fresno County Department of Public Works and Planning, involves the construction, operation, and maintenance of a 200 megawatt solar energy facility on 2,000 acres of undeveloped land in western Fresno County, California. The project includes the installation of up to 184 megawatts alternating current of battery energy storage and all associated electrical infrastructure. Located in the central San Joaquin Valley near the communities of Tranquillity, Mendota, and San Joaquin, the project is categorized under NAICS code 221114. A critical component of the project is environmental compliance under the California Endangered Species Act and the California Environmental Quality Act. The project is authorized under Incidental Take Permit 2081-2025-003-04, issued by the California Department of Fish and Wildlife, to allow for the incidental take of the state candidate western burrowing owl. This permit addresses permanent impacts to 1,518 acres of occupied habitat and mandates strict adherence to mitigation, ecological monitoring, and reporting requirements to minimize species impact. The solicitation was posted on August 15, 2025, with primary coordination handled by Jeremy Shaw of Fresno County and Jaime Marquez of the California Department of Fish and Wildlife.

General Info

Fresno County solar project building 200MW facility with battery storage and environmental compliance.

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseAwarded
Posted

forecast

Awarded

Contract was awarded

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Fresno County
Contacts2 people available
OfficeN/A
Organization / AgencyCalifornia → Fresno County
Office AddressN/A
Contacts
Jaime MarquezEnvironmental Scientist
Jeremy ShawDepartment of Public Works & Planning

Full Description

Show more
The Project includes construction, operation, and maintenance of 2,000 acres of undeveloped land into a 200 megawatt (MW) solar energy facility with up to 184 megawatts alternating current of battery energy storage, and other associated electrical infrastructure. The Project is expected to result in incidental take of the State candidate western burrowing owl (Athene cunicularia hypugaea) which is protected under the California Endangered Species Act (CESA). The Project is expected to cause permanent impacts to 1,518 acres of occupied habitat for western burrowing owl. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

More opportunities from California → Fresno County

Same awarding agency

NAICS: 221114
SLED
Rosemary Solar and Energy Storage System Complex
Solicitation # 2024110253
The Rosemary Solar and Energy Storage System Complex project involves the construction, operation, and eventual decommissioning of a 140-megawatt photovoltaic solar and battery energy storage facility in unincorporated Fresno County, California. Spanning approximately 1,172 to 1,212 acres of agricultural land, the project includes three interconnected generation sites, an on-site substation, and a generation-tie line of up to 2 miles connecting to the PG&E Crescent Substation. Additional infrastructure improvements include the reconductoring of 5 linear miles of the PG&E Helm to Crescent 70 kV transmission line and the raising of a portion of the Crescent Switching Station-Schildner 70 kV power line. The project has undergone a comprehensive environmental review process under CEQA, resulting in a Final Environmental Impact Report and a Notice of Determination certifying that the project will not have a significant environmental effect, provided that adopted mitigation measures and monitoring plans are implemented. Key regulatory considerations include the protection of special-status species, such as the Fresno kangaroo rat and blunt-nosed leopard lizard, and compliance with flood control permits and hazardous waste packaging and labeling regulations. The project received approval from the Fresno County Department of Public Works and Planning on May 21, 2026, and from the Westlands Water District on July 21, 2026, with the latter agreeing to provide construction water for up to two years.
Solar Electric Power Generation

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
Unclassified Conditional Use Permit Application No. 3821 & Initial Study No. 8708
Solicitation # 3821
Unclassified Conditional Use Permit Application No. 3821 and Initial Study No. 8708 involve an amendment to the Panoche Rd. Major Interchange Master Plan to allow the installation of an EV Truck Charging Station and associated DC Fast Charging EV Stations. The project, submitted by applicant Jia Lui on behalf of Tesla, is located on two parcels (APNs 027-190-32S and 027-190-42S) at the northwest corner of W. Panoche Rd. and Interstate 5 in Fresno County, within the AE-40 Exclusive Agriculture Zone District. The facility will feature sixteen semi truck charging stalls, eight semi truck parking stalls, and restroom amenities. The Fresno County Department of Public Works and Planning served as the lead agency, conducting an environmental review under the California Environmental Quality Act. The process resulted in a Mitigated Negative Declaration, concluding that the project would not have a significant environmental effect, provided specific mitigation measures are implemented. The project must adhere to the Fresno County General Plan Policy LU-D.6 for aesthetic excellence and the Fresno County Zoning Ordinance Section 860.E.2 regarding landscaping. Administrative milestones included a public review period from November 5 to December 5, 2025, and a public hearing on December 11, 2025, with a final Notice of Determination issued on December 30, 2025.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS