Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Hellman Solar PV Electrical System Project

Forecast
2025080495State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Hellman Solar PV Electrical System Project, managed by the City of Seal Beach, involves the installation and operation of a 1.5 megawatt fixed-tilt ground-mounted solar photovoltaic system at the Hellman Ranch Oil and Gas Production Facility located at 1 Pacific Coast Highway, Seal Beach, California. The system will cover approximately 2.66 acres and consists of three separate solar arrays featuring 56 solar tables and 3,100 solar panels. These panels will be installed facing south at a 10-degree fixed tilt angle and will feature anti-reflective coatings to minimize glare. The project is designed to interconnect with the facility's electrical infrastructure and operate in parallel with the utility grid to provide sustainable energy for facility operations. The project was approved on September 29, 2025, following an environmental review that determined no significant environmental effects. Key operational requirements include maintaining a 30-foot buffer from City waterlines and adhering to strict construction timelines to avoid bird nesting seasons, typically from February 1 through September 15. Environmental compliance measures include pre-construction burrowing owl surveys, the presence of a Native American monitor during ground disturbance, and adherence to SCAQMD Rule 403 regarding fugitive dust. Construction is estimated to take approximately 64 days, encompassing site preparation, support pile installation, equipment installation, and a final testing and commissioning phase. All project drawings are proprietary to Newport Power and are treated as confidential.

General Info

City of Seal Beach installing 1.5MW solar system at Hellman Ranch facility.

Place of Performance

Pacific Coast Highway and 1st Street, Seal Beach, CA, 90740

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Seal Beach
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Shaun TemplePlanning Manager
John Peirson JrPresident

Interested Companies (1)

MRS EnvironmentalSanta Barbara, CA

Full Description

Show more
The proposed Project would consist of the installation and operation of a 1.5 megawatt (MW) fixed-tilt ground mounted solar photovoltaic (PV) system at the Hellman Ranch Oil and Gas Production Facility. This system would interconnect with the Hellman Property's electrical infrastructure and operate in parallel with the utility grid to provide sustainable clean energy in support of the facilities operations. The proposed Project would include three separate solar arrays, consisting of a total of 56 solar tables, which would be comprised of 3,100 solar panels. The proposed PV system would cover approximately 2.66 acres on the north edge of the existing Hellman Ranch Oil and Gas Production Facility.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
San Luis West Solar Project
Solicitation # 2024110679
San Luis West Solar, LLC proposes the construction and operation of the San Luis West Solar Project in southern Fresno County, California, located approximately 10 miles northwest of Kettleman City. The project consists of a 125-megawatt solar photovoltaic electric generation facility coupled with a 30-megawatt battery energy storage system. The total project area encompasses approximately 1,100 acres, including 770 acres of solar panels and associated infrastructure such as a project substation, operations and maintenance building, and transmission easement areas. The facility is designed to inject electricity into the PG&E grid, with the battery system providing energy discharge during peak electrical load periods. The project is subject to comprehensive environmental review under the California Environmental Quality Act, with a Final Environmental Impact Report completed in October 2025. Key technical assessments have been conducted regarding air quality, greenhouse gases, noise, geology, soils, and water supply. Biological evaluations have focused on the protection of special-status species, including the western burrowing owl and Crotch's bumble bee. The project also includes a detailed Reclamation Plan to ensure the site is restored to agricultural conditions following an anticipated operational lifespan of at least 35 years. Construction was anticipated to commence in 2025, with a desired commercial operation date of December 31, 2025.
Fresno County

POSTED

2 days ago

DEADLINE

N/A
View Details
NAICS: 221114
New
SLED
Solar Photovoltaic System(s)
Solicitation # 27-1409465
Connecticut State Colleges and Universities is soliciting proposals for a turnkey project to finance, design, install, operate, and maintain solar photovoltaic systems across multiple campuses, including Central Connecticut State University, Eastern Connecticut State University, and Connecticut State Community College locations at Asnuntuck, Naugatuck Valley, and Norwalk. The selected contractor will provide electricity to these institutions under a long-term power purchase agreement with a 20-year base term, not to exceed 25 years in total. The scope includes all engineering, procurement, and integration into campus energy management systems, with structural components designed for a minimum 30-year life. Proposers are also required to submit for the Eversource large LREC/ZREC program, using an assumed value of 60 dollars per REC for pricing purposes. The contract is subject to various state executive orders and statutory requirements, including Connecticut ethics laws, non-discrimination warranties, and the Iran Energy Investment Certification. Evaluation of proposals will be based on factors such as the minimum yearly kilowatt-hours provided, generation cost per kilowatt-hour, project readiness, and the proposer's experience and funding strength. Performance is expected to commence on February 8, 2027, with a target completion date of December 31, 2028. Payment will be handled via monthly invoices for electricity supplied, with a 12-month window for disputing invoice correctness. All systems must be UL certified and comply with Connecticut Building Codes and FM Global insurance standards. Proposals must be submitted via email by 2:00 PM on December 16, 2026.
DAS Procurement

POSTED

4 days ago

DEADLINE

in about 1 month
View Details
NAICS: 221114
SLED
Grants for Community Solar Photovoltaic (PV) Projects Providing Direct Benefits to Low and Moderate Income Residential Electric Customers
Solicitation # 2026-008
The New Hampshire Department of Energy is offering grants totaling 500,000 dollars for community solar photovoltaic projects designed to provide direct benefits to low and moderate income residential electric customers. Projects must be physically located within New Hampshire, including the grid interconnection point, and are ineligible if they are located within or serve customers of a municipal electric utility. Successful grantees must ensure projects are operational within 24 months of approval by the Governor and Executive Council. The scope of work requires a detailed project plan, itemized financial documentation, a comprehensive management approach for identifying and enrolling low and moderate income participants, and an evaluation of net annual benefits over the first 10 years of operation. Technical specifications require the use of optimal energy modeling, such as Solar Pathfinder, and the provision of labor, equipment, and inverter replacement warranties. Proposals are evaluated on a 100-point scale through a multi-step process involving screening, preliminary evaluation by department staff, a Commissioner's review, and final approval by the Governor and Executive Council. Applicants must submit searchable PDF proposals via email by January 7, 2027, including a letter of transmittal, a project summary sheet, and resumes for key personnel. Required certifications for award include a Secretary of State’s Office Certificate of Good Standing, a Certificate of Vote/Authority, a Certificate of Insurance, and proof of workers' compensation compliance. All proposers must explicitly agree to comply with Form G-1 requirements and register as vendors with the State of New Hampshire.
Department Of Energy

POSTED

7 days ago

DEADLINE

in 2 months
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS