Curry Creek Solar Project
Forecast
2025080634State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Sacramento Municipal Utility District
Place of Performance
Baseline Road, Country Acres Lane, Roseville, CA, 95626Set-Aside
NONE
Timeline
PhaseForecast
Organization & Contact Information
Show more
AgencyCalifornia → Sacramento Municipal Utility District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Sacramento Municipal Utility District
Office AddressN/A
Contacts
Interested Companies (1)
AecomDenver, Colorado
Full Description
Show more
The Curry Creek Solar Project includes construction and operation of a PV solar power and battery storage facility and interconnection facilities, including a generation substation, with interconnection at the Country Acres switch station. The project would provide new power production capacity of up to 156 MW delivered at the point of interconnection with the grid managed by SMUD. The total project site would generally comprise PV solar modules, foundation piles, racking, direct current (DC) collection, alternative current (AC) collection, fencing, roads, inverters, medium voltage transformers, an interconnection line between the generation substation and switch station, battery storage equipment, and interconnection lines to the existing SMUD transmission system.
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Prepare for this forecast
Research this forecast and prepare for the solicitation
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS