Bridge Preventative Maintenance Program Group 5 Project
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Tulare County
NAICS
237310 - Highway, Street, and Bridge ConstructionView NAICS
Place of Performance
CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Tulare County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Tulare County
Office AddressN/A
Contacts
Full Description
Show more
Tulare County (County), in cooperation with the California Department of Transportation (Caltrans), proposes to perform maintenance on 17 bridges throughout various locations within the County. A summary of the 17 bridges, including bridge number and location, included in the Project is listed in the table below.
The County is responsible for the maintenance of 359 bridges within the boundaries of Tulare County. In 2015, the County developed a BPMP, that includes five category groups of maintenance activities, with the following objectives: maintain the existing bridge inventory in a structurally safe and serviceable condition; correct minor structural defects; repair deficiencies early in a bridges life prior to encountering major, more costly rehabilitation, reconstruction, or replacement; and extend the service life of existing bridges. Group 5 includes scour countermeasures (streambed degradation or localized scour), which is often the highest priority, and the repair, restoration, and strengthening of structural elements.
The purpose of the Project is to extend the service life of 17 bridges within the County considered to be in generally good condition. Preventative maintenance activities are needed to provide improved safety and operations on each facility.
The proposed Project would implement preventive maintenance measures primarily consisting of scour protection repairs and other miscellaneous work including but not limited to deck treatment, spall repair, structural connection repairs, joint repairs, bridge bearing repairs, and overlay (asphalt concrete) removal. Erosion control will be placed where necessary and disturbed areas will be revegetated.
Bridge No. 46C0036
Facility Carried/Intersection: Rd. 168/Tulare Irrigation District (TID) Canal
APN: 111-180-015, 111-180-062, 111-180-064
Work Description:
? Clear debris/rubble in TID Canal
? Grout exposed piles and place grout bags in front of piers
Bridge No. 46C0058
Facility Carried/Intersection: D60 / Cross Creek
APN: 045-100-009
Work Description:
? Partially grouted rock slope protection (RSP) along the whole creek width
Bridge No. 46C0059
Facility Carried/Intersection: D60 / Cross Creek
APN: 045-100-009, 045-100-021
Work Description:
? Clear debris/rubble in Cross Creek
? South abutment rubble to be removed and replaced with properly sized RSP
? Drop structure downstream of bridge
? Grout exposed piles at abutments
? Partially grouted riprap along full length of channel
Bridge No. 46C0087
Facility Carried/Intersection: M120 / Deer Creek
APN: 305-060-013, 305-060-014, 305-190-021
Work Description:
? Grout exposed pier piles and place cut-off walls at piers
? Partially grouted riprap at abutments and piers
? Methacrylate deck treatment
? Roadway approach work
Bridge No. 46C0106
Facility Carried/Intersection: Road 144 / Deer Creek
APN: 318-130-005, 318-290-002
Work Description:
? Grout exposed pier piles and place partially grouted riprap around piers
? Methacrylate deck treatment
? Roadway approach work
Bridge No. 46C0108
Facility Carried/Intersection: Avenue 88 / Deer Creek
APN: 319-100-002, 319-110-005
Work Description:
? Place partially grouted riprap around piers
? Methacrylate deck treatment
? Clear debris within Deer Creek
Bridge No. 46C0202
Facility Carried/Intersection: M112 / Deer Creek
APN: 325-030-005
Work Description:
? Replace left rotated wingwall
? Add cut-off walls to both abutment footings
Bridge No. 46C0204
Facility Carried/Intersection: M112 / Tyler Creek
APN: 325-210-053, 325-210-065
Work Description:
? Place downdrains around wingwalls
? Repaint areas where the paint system is damaged or no longer effective
Bridge No. 46C0205
Facility Carried/Intersection: SR56 (Hot Springs Rd.)/Deer Creek
APN: 344-190-004, 344-190-007
Work Description:
? Cut-off wall at abutment 1
Bridge No. 46C0226
Facility Carried/Intersection: Avenue 428 / Friant Kern Canal
APN: 035-250-003, 035-250-008, 035-260-002, 035-260-013
Work Description:
? Methacrylate deck treatment
? Reset bearings at abutment 4
? Remove AC from sliding steel plate joint to allow for joint movement
? Place RSP or turf reinforcement mat at abutments
Bridge No. 46C0269
Facility Carried/Intersection: Road 80 / Elk Bayou
APN: 228-010-019, 228-010-021
Work Description:
? Remove asphalt concrete surfacing (and re-stripe deck)
? Place RSP at piers and abutments
? Replace bridge rail
Bridge No. 46C0318
Facility Carried/Intersection: Road 136 / Deer Creek
APN: 318-120-014, 316-180-008, 316-180-012
Work Description:
? Place RSP along channel and around wingwalls
? Clear debris within Cottonwood Creek
? Roadway approach work
Bridge No. 46C0330
Facility Carried/Intersection: Road 180 / Cottonwood Creek
APN: 053-120-007, 053-160-006
Work Description:
? Place RSP along channel and around wingwalls
? Clear debris within Cottonwood Creek
? Roadway approach work
Bridge No. 46C0403
Facility Carried/Intersection: Avenue 304 / Crocker Cut
APN: 111-050-042, 111-130-011
Work Description:
? Construct cut-off wall along downstream
? Remove asphalt concrete (AC) at both approaches and along bridge
Bridge No. 46C0408
Facility Carried/Intersection: Road 152 / Mill Creek
APN: 103-110-006, 103-500-001
Work Description:
? Place partially grouted riprap at piers
? Replace or add additional grout bags at upstream portions of abutments
Bridge No. 46C0420
Facility Carried/Intersection: Road 108 / Saint Johns River
APN: 077-040-029, 077-040-031
Work Description:
? Grout exposed piles
? Place partially grouted riprap along full channel width
? Methacrylate deck treatment
? Place RSP within Saint Johns River
Temporary road closures and detours will take place at select bridge sites. The anticipated duration of the road closures will be approximately 4-6 hours depending upon access needs of residents and available detour options. Temporary construction easements (TCEs) and partial right-of-way (ROW) will likely be needed on a limited basis to accommodate the construction of the proposed preventative maintenance activities. Full ROW takes are not anticipated. Construction at all bridge locations is expected to be completed in approximately 12 months.
The Project is federally funded through the Highway Bridge Program, as such it requires compliance with both the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The lead agency for the CEQA compliance is the County, and the lead agency for the NEPA compliance is Caltrans.