Tulare County Stream Channel Routine Maintenance Agreement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Tulare County plans to establish a 12-year agreement with the California Department of Fish and Wildlife to conduct routine maintenance on jurisdictional stream channels, drainage facilities, and associated areas throughout the county. The agreement authorizes approximately 30 maintenance projects annually, covering a range of activities such as repairing or replacing drainage structures, clearing debris and sediment under dry conditions, managing vegetation through grazing or direct removal, performing minor erosion control work, repairing prior erosion measures, and conducting geotechnical sampling or cultural resource sensitivity tests. All specific methods, locations, and scope of work will require prior submission and approval via the CDFW’s Verification Request Form process to ensure compliance with environmental regulations. The project is designed to support long-term water flow integrity, reduce flood risks, and maintain public infrastructure while adhering to state wildlife and habitat protections. The agreement will be administered by Tulare County’s Environmental Planning and Economic Development teams, with key personnel including the Chief Planner, Senior Environmental Planner/Biologist, and Associate RMA Director serving as primary contacts. The project is forecasted to be initiated in 2026 and will span the entirety of Tulare County’s jurisdictional waterways, ensuring consistent and regulated upkeep without requiring individual permits for each routine action. The long-term nature of the agreement streamlines compliance, reduces administrative burdens, and fosters consistent collaboration between the county and state wildlife agencies to balance infrastructure needs with ecological stewardship.

General Info

Tulare County and CDFW enter 12-year agreement for 30 annual stream and drainage maintenance projects with prior approval.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Tulare County
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → Tulare County
Office AddressN/A
Contacts
Denise EnglandGrants & Resources Manager

Interested Companies (1)

Dokken EngineeringFolsom, California

Full Description

Show more
Tulare County proposes to enter a long-term, 12-year Streambed Alteration Agreement/Routine Maintenance Agreement with the California Department of Fish and Wildlife (CDFW) for ongoing maintenance within jurisdictional stream channels, drainage facilities, and associated CDFW jurisdictional areas. The County anticipates approximately 30 maintenance projects per year. Activities may include repair or replacement of drainage facilities; channel alignment maintenance; debris, obstruction, and sediment removal; vegetation control and grazing; minor erosion-control work; and limited geotechnical or subsurface cultural-resource testing. Exact methods, locations, and extent of individual activities would be reviewed by CDFW through the Verification Request Form process. The IS/MND identifies potentially significant effects that would be reduced to less-than-significant levels through adopted mitigation measures and the Mitigation Monitoring and Reporting Program (MMRP).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Temporary Stabilization of Bulkhead, Lake Livingston State Park
Solicitation # 802-27-86931
The Texas Parks and Wildlife Department is soliciting bids for the temporary stabilization of the bulkhead at Lake Livingston State Park in Polk County, Texas. The project requires a contractor to provide all labor, equipment, and materials to stabilize the eroding bulkhead, prevent further property loss, and mitigate safety risks to visitors while minimizing environmental impacts and protecting cultural resources. Work must be completed as soon as possible, but no later than December 31, 2026, with standard working hours from Monday through Friday, 8:00 AM to 5:00 PM. The contract will be awarded based on the best value, determined by the base bid, bidder responsiveness, and responsibility. Bidders must demonstrate successful experience with projects of similar size and complexity within the past five years and maintain a satisfactory performance score in the Vendor Performance Tracking System. Key requirements include compliance with prevailing wage scales, E-Verify usage, and the provision of a bid security bond for projects exceeding 25,000 dollars. Payments are made via state warrants within 30 days of receiving a properly prepared invoice. Final acceptance is subject to an inspection by TPWD personnel within five working days of completion, following a five-day advance notice from the contractor.
Parks and Wildlife Department

POSTED

about 7 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
International
Physical Hazard Rehabilitation at the former Hunt, Cornelius Mine
Solicitation # tender_22298
The Government of Ontario, through the Ministry of Energy and Mines, is soliciting bids for physical hazard rehabilitation at the former Hunt, Cornelius Mine. The project scope consists of five primary tasks: the detailed design and installation of a bat gate, fence installation covering 500 meters, project management including mobilization, demobilization, and access maintenance, and progressive rehabilitation reporting. The work must adhere to specific standards, including the Agency Guide to Cave and Mine Gates 2009 and a Physical Mine Hazards Risk Assessment. The anticipated contract start date is January 7, 2026, with a primary term of two years and an option to extend for one additional year. The selection process is a three-stage evaluation. Stage 1 verifies mandatory requirements, while Stage 2 evaluates technical capabilities, requiring a minimum score of 70% to proceed. Technical evaluation focuses on project experience, roles and responsibilities, occupational health and safety, and a plan for Indigenous community beneficial participation. Stage 3 is a commercial evaluation based on the lowest bid price. Bidders must provide a detailed methodology, a Gantt chart schedule, and focused resumes for key personnel, including a Professional Engineer and various technical leads. Mandatory requirements include proof of W.S.I.B coverage, insurance, and tax compliance verification.
Energy and Mines

POSTED

about 8 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
26-8708 South Marco Beach Renourishment 2027 - Grant Funded
Solicitation # 26-8708
Solicitation 26-8708 is a grant-funded project issued by the Collier County Board of County Commissioners for the 2027 South Marco Beach Renourishment. With an anticipated budget of 6,400,000 dollars, the project involves the transport, placement, and grading of pre-purchased beach fill material, as well as turbidity monitoring, surveying, and maintenance of traffic. The contract will be awarded to the lowest responsive and responsible bidder based on their base bid and selected alternates. Bidders must demonstrate performance capability by providing three completed beach restoration references in Florida and submitting a detailed project schedule and subcontractor list. The project requires substantial completion within 55 consecutive calendar days from the commencement date, with final completion due within 30 days after the delivery of a punch list. Delays are subject to liquidated damages of 3,498 dollars per day. The successful contractor must provide performance and payment bonds for 100 percent of the contract amount, a 5 percent bid bond, and comprehensive insurance. Because the project is funded by FEMA Public Assistance, it must comply with 2 CFR Part 200 and the Stafford Act, although it is exempt from the Davis-Bacon Act, the Copeland Anti-Kickback Act, and Build America Buy America preferences. Technical acceptance is based on strict vertical tolerances of 6 inches and volume tolerances between 95 and 105 percent of the design volume.
Coastal Zone Management

POSTED

about 8 hours ago

DEADLINE

in about 1 year
View Details

More opportunities from California → Tulare County

Same awarding agency

NAICS: 238910
SLED
Cardoza Contractor Storage Yard (PSP 26-013)
Solicitation # PSP 26-013
The Cardoza Contractor Storage Yard project, identified as Special Use Permit PSP 26-013, involves the establishment and operation of a storage facility at 13870 Avenue 228, Tulare, California, to support an off-site landscaping business. The scope of work includes the construction of a 3,600-square-foot metal shop building, an on-site wastewater treatment and septic system, and a 20-foot wide all-weather gravel access road. The site is designed to accommodate parking and storage for up to twelve pickup trucks, twelve cargo or flatbed trailers, and various lawn maintenance equipment. Daily operations will support up to twenty-seven employees working one shift from Monday through Saturday, 6:00 a.m. to 4:00 p.m. The project was approved on September 23, 2026, following a California Environmental Quality Act review that resulted in a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program. Key compliance requirements include pre-construction biological surveys and daily inspections to protect the San Joaquin kit fox, the implementation of best management practices for erosion and sediment control, and adherence to regional water quality and air quality standards. Additionally, the project mandates specific visual screening using valley oak trees and hedges at least six feet high, shielded exterior lighting to prevent spillover, and strict adherence to state laws regarding the discovery of Native American remains. Prohibited activities at the site include fuel dispensing, equipment washing, and the storage of hazardous waste, pesticides, or fertilizers.
Site Preparation Contractors

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Pixley Travel Center
Solicitation # 2025100833
The Pixley Travel Center project, managed by the Tulare County Resource Management Agency, involves the development of a comprehensive travel facility on two contiguous parcels totaling 36.47 acres at the intersection of Road 124 and Avenue 120 in Pixley, California. The southern parcel will house the primary infrastructure, including a 20,000-square-foot convenience store, a 3,100-square-foot fast-food restaurant with a drive-thru, 16 gasoline fueling islands, two RV fueling islands, and 18 electric vehicle charging stations. The northern parcel is designated for future development, potentially featuring a 17,000-square-foot truck wash and service building. Additional site features include 10 diesel islands, biodiesel and DEF dispensers, extensive truck parking, two 80,000-gallon fire-water tanks, and a pet and children's play area. The project requires the demolition of an existing cotton-ginning facility and the implementation of a stormwater pollution prevention plan, with water provided by an on-site groundwater well and wastewater managed through septic systems. The project timeline spans from January 1, 2026, through June 16, 2027, progressing through phases of site preparation, grading, building construction, paving, and architectural coating. Environmental compliance is a critical component, as evidenced by a Mitigated Negative Declaration and a Notice of Determination approved by the Tulare County Board of Supervisors on January 27, 2026. Key requirements include adherence to Cal/OSHA safety orders for underground work and strict biological monitoring. This includes pre-construction surveys for special status plant and animal species, employee education programs led by qualified biologists, and compliance with the Migratory Bird Treaty Act during nesting seasons. The project also involves coordination with the State Water Resources Control Board and the Department of Conservation to manage groundwater and protect agricultural land resources.
Highway, Street, and Bridge Construction

POSTED

9 months ago

DEADLINE

N/A
View Details
NAICS: 237310
SLED
Bridge Preventative Maintenance Program – Group 5 Project
Solicitation # 2025091296
The Bridge Preventative Maintenance Program Group 5 Project, solicitation number 2025091296, is a Tulare County initiative designed to extend the service life and improve the safety of 17 bridges currently in good condition. The scope of work focuses on correcting minor structural defects to avoid costly future reconstruction, with primary activities including high-priority scour protection repairs, deck treatment, spall repair, structural connection and joint repairs, and bridge bearing repairs. Additional work involves asphalt concrete overlay removal, erosion control, and the revegetation of disturbed areas. The project is expected to be completed within approximately 12 months and may require limited temporary construction easements and partial right-of-way. The project is subject to strict environmental and regulatory compliance, including NEPA and CEQA standards. Key requirements include the management of lead-based paint to ensure no visible dust and the handling of chemically treated wood waste according to DTSC regulations and Caltrans 2023 Standard Specifications. Environmental safeguards are emphasized, requiring a project biologist to inspect excavated holes and trenches for protected species, such as the California Tiger Salamander, and to monitor bat habitat trees. Construction will involve temporary road closures and detours lasting between 4 and 6 hours at select sites. The project is managed by the Tulare County Resource Management Agency, with oversight provided by the Chief Planner, Project Engineer, and Environmental Planner.
Highway, Street, and Bridge Construction

POSTED

9 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS