Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Midpeninsula Regional Open Space District Open Space Maintenance and Restoration Program

Forecast
EPIMS-SMO-22941State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Midpeninsula Regional Open Space District is implementing the Open Space Maintenance and Restoration Program in San Mateo County, California. Under the amended Lake and Streambed Alteration Agreement EPIMS-SMO-22941-R3, the project adds a specific streambed alteration involving the construction of a 16-foot elevated boardwalk, or puncheon, across an unnamed ephemeral channel that drains into Steven’s Creek Reservoir. This work is designed to provide access to a multiuse trail and will involve excavating approximately one cubic yard of material using hand tools and small equipment such as a mini excavator or skidsteer. The project is governed by California Fish and Game Code section 1602 and the California Environmental Quality Act. The California Department of Fish and Wildlife serves as the Responsible Agency and issued a Notice of Determination on July 11, 2025, concluding that the project will not have a significant environmental effect within its jurisdiction. While mitigation measures have been imposed, no formal Mitigation Reporting or Monitoring Plan was adopted. Key administrative contacts include Matthew Chaney for the Midpeninsula Regional Open Space District and Shannon Husband for the California Department of Fish and Wildlife.

General Info

Add 16-foot boardwalk across ephemeral stream on Picchetti Ranch, minimal excavation, CDFW-approved, no formal contract value.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Midpeninsula Regional Open Space District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Aaron HebertLead Agency Representative
Shannon HusbandEnvironmental Scientist

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has amended Lake and Streambed Alteration Agreement (EPIMS-SMO-22941-R3), pursuant to Fish and Game Code section 1602, the project Applicant, Midpeninsula Regional Open Space District. The amendment to the Agreement includes addition of two Streambed Alteration Projects to Routine Maintenance Agreement EPIMS-SMO-22941-R3. These projects include the Purisima Pond Restoration Project (which involves repairing a damaged berm on Purisima Pond, eliminating a diversion from Purisima Creek to the pond, spillway modifications, and installation of cattle exclusion fencing), and the Meadow Trail Puncheon Project (which involves conducting drainage and tread repairs along the trail and installation of two puncheons over an ephemeral drainage

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CPK2504 - Eldridge Park Improvements
Solicitation # 2026-ITB-049
The City of Sugar Land has issued solicitation 2026-ITB-049 for the Eldridge Park Improvements project located at 2511 Eldridge Rd, Sugar Land, Texas. This invitation for bid seeks a contractor to provide all labor, materials, equipment, and supervision necessary for various site enhancements. The base bid encompasses site preparation, selective demolition, parking lot pavement and curb construction, the installation of a new waterline connected to the city main, irrigation, grading, hydroseeding, the construction of playground walls, and the installation of ADA-compliant sidewalks. Additionally, the project includes a site furnishing cash allowance of 30,000 dollars. The solicitation includes two optional add-alternates. Add Alternate 1 focuses on sidewalk demolition, bench reinstallation, new ADA-compliant sidewalks, resodding, and the installation of decomposed granite around the park building. Add Alternate 2 involves tree removal, light pole relocation, and the construction of a 210 by 345 foot synthetic turf field featuring an underground detention system, fencing, and associated furnishings. Electronic bids must be submitted via the OpenGov portal by 11:00 am on November 12, 2026. The City Council will award the contract, with notice provided within 90 to 180 calendar days following the bid opening. The selected vendor will be required to enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects and maintain all required insurance coverages.
Engineering

POSTED

about 15 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
PIER B ON-DOCK RAIL SUPPORT FACILITY RAIL YARD ACCESS IMPROVEMENTS
Solicitation # HD-S3215
Solicitation HD-S3215, issued by the Long Beach Harbor Department for the Port of Long Beach, covers rail yard access improvements for the Pier B On-Dock Rail Support Facility. The scope of work includes the realignment, relocation, resurfacing, and rehabilitation of existing railroad tracks and the construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor. Key technical requirements involve the installation of new railroad signal systems, modification of the signal system at CP Gaspur, and the implementation of special trackwork such as turnouts and crossovers. The project also encompasses extensive demolition of tracks, pavement, and utilities, as well as earthwork, grading, storm drain improvements, and the relocation of street lighting, all phased around active railroad operations. The contract requires strict adherence to AREMA manuals and CPUC General Orders, with a heavy emphasis on quality control and safety. Deliverables include a Site-Specific Safety Plan, a Railroad Work Plan, and certified Acceptance Test Reports, with testing for equipment and cabling performed by a NETA-certified independent agency. Bidders must submit electronic bids through the Port of Long Beach PB System, including a comprehensive proposal package and an SBE/VSBE Commitment Plan. The project is subject to various federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Americans with Disabilities Act. Performance security is required in the form of payment and performance bonds for 100% of the contract price, and bid security must be at least 10% of the base bid.
Port of Long Beach

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
Project No. 46108-C is a unit price construction contract for the Cayuga Inlet Flood Risk Reduction and Restoration project located at 900 Taber Street in Ithaca, New York. Issued by the New York State Department of Environmental Conservation and the Office of General Services, the project has an estimated value between 23 million and 24 million dollars. The scope of work encompasses comprehensive site preparation, earthwork, and hydraulic dredging operations, including the management of filtrate from geotextile tube dewatering and the off-site disposal of organic, dredge, and construction debris. Key deliverables include a Marine Traffic Control Plan, daily hydraulic dredge reports, and detailed subsurface investigation reports. The project also requires pre-construction and progress bathymetric and topographic surveys, as well as the establishment of a site management facility for staging and spoil management. Bids are due by December 9, 2026, and must be submitted via Bid Express or as sealed paper bids to the Office of General Services in Albany. The contract will be awarded to the apparent low bidder based on a determination of bid responsiveness and bidder responsibility, which includes an evaluation of financial data, past performance on similar contracts, and the qualifications of key personnel such as the Project Manager and Site Safety Officer. Bidders must provide bid security of 599,200 dollars and, upon award, furnish performance and labor and material bonds for 100 percent of the contract price. Compliance with New York State Labor Law, prevailing wage schedules, and MWBE/SDVOB utilization plans is required. All imported materials must be approved by the Director's Representative and verified by a qualified geotechnical testing laboratory.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 16 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Freedom Park Boardwalk Repairs - Boardwalks 1 & 2
Solicitation # 26-8700
Solicitation 26-8700 is an invitation to bid issued by the Collier County Board of County Commissioners for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in Florida. The project has an anticipated budget of 1,300,000 dollars, which includes a 198,120 dollar Owner's Allowance for unforeseen conditions. The scope of work involves replacing deteriorated decking, structural supporting timber, fasteners, and hardware, as well as repairing damaged pilings and support beams. Technical requirements specify the use of IPE Wood and 5500 psi Type IV Portland Cement, with strict adherence to FDOT and ASCE standards and environmental protections for mangroves. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and selected alternates. Bidders must provide a 5% bid bond and, upon award, furnish performance and payment bonds for 100% of the contract amount. The project timeline mandates completion within 134 calendar days from the Notice to Proceed, with work generally limited to weekdays between 7:00 a.m. and 7:00 p.m. Bids must be submitted electronically via the OpenGov portal by November 13, 2026, at 3:00 p.m. Contractors are required to hold a valid State of Florida General Contractors or Building Contractor license and must comply with all Environmental, Health, and Safety requirements, including OSHA and EPA regulations.
Procurement

POSTED

about 19 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → Midpeninsula Regional Open Space District

Same awarding agency

NAICS: 237110
New
SLED
Skyline Field Office Well Installation Project
Solicitation # 20261104035
The Skyline Field Office Well Installation Project, managed by the Midpeninsula Regional Open Space District, involves the design, permitting, and installation of a new potable water well at the Monte Bello Open Space Preserve in San Mateo County, California. The scope of work includes permit development, 8-inch test hole installation, well development activities such as reaming and casing installation, concrete pad construction, and the implementation of erosion control and spoils handling measures. All operations must adhere to San Mateo County Code Chapter 4.68 and specific guidelines to minimize phytophthora contamination. The project must be completed within 60 calendar days from the Notice to Proceed, with a baseline schedule required within ten days of that notice. The contract will be awarded to the responsible bidder providing the lowest responsive base bid. Bidders must submit a signed proposal, a completed Bidder's Questionnaire detailing safety records and EMR, and bid security equal to 10 percent of the maximum bid amount. The successful contractor is required to provide performance and payment bonds for 100 percent of the contract price and must comply with California prevailing wage laws. Work is restricted to Monday through Friday during authorized hours, and final acceptance is contingent upon the completion of all punch list items and the submission of final as-built drawings.
Water and Sewer Line and Related Structures Construction

POSTED

1 day ago

DEADLINE

in 18 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS