Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Buck Gulch Falls Creek Restoration and Trail Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.

General Info

Restore creek, upgrade trails, build bridges and boardwalks, limit access, stabilize banks, protect habitat in Novato, California.

Agency

California → Marin County Open Space District

Place of Performance

Fairway Drive and St. Andrews Drive, Novato, CA, 94945

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Open Space District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Marin County Open Space District
Office AddressN/A
Contacts
Jason HoornSenior Natural Resources Planner
Carrie LukacicPrincipal Environmental Planner

Interested Companies (1)

Show more
PCI Ecological
Sebastopol, CA

Full Description

Show more
Initial Study/Mitigated Negative Declaration. The proposed project would restore Arroyo de San Jose Creek and associated ephemeral streams and to provide safe and sustainable year-round all-abilities access along Spyglass Trail and Buck Gulch Falls Trail leading to Buck Gulch waterfall at Ignacio Valley Open Space Preserve. The proposed project would install two bridges to remove visitor access from the creek; install one puncheon and one boardwalk over unnamed ephemeral streams along the trail; improve conditions along nearly 2,240 feet of existing trail; realign nearly 850 feet of trail segments away from eroding streambanks; change use of the Buck Gulch Falls Trail from hiker/equestrian only to hiker only use; install four fill slope walls to retain the trail alignment near the waterfall viewing area; install new fencing and signage at the waterfall viewing area; decommission and restore nearly 850 feet of trail; and restore nearly 19,500 square feet of eroding streambank and riparian area along Arroyo de San Jose Creek. These actions would meet the project purpose and objectives by reducing the environmental impacts of current visitor access, improving the user experience, safety, and accessibility for all trail users, and enhancing the sustainability of the trail consistent with the RTMP policies, applicable BMPs, and MCOSD's trail design standards and MCOSD's Inclusive Access Plan where feasible. Implementation of the proposed project would substantially reduce the potential for accelerated erosion and sedimentation into the Arroyo de San Jose Creek that could adversely impact water quality and listed aquatic species and their habitats. The proposed project would incorporate erosion control techniques, including placement of straw wattles at the base of realigned trail segments, surfacing the approaches to the proposed bridges with aggregate base rock, and placing of seed and mulch on disturbed ground.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price sealed bid issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole through clearing, grubbing, and stone rework. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the Notice to Proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Award is based on the lowest responsive price, and bidders must provide performance and payment bonds along with a bid guarantee. Key requirements include the submission of an operations plan and performance schedule within 30 days of the Notice to Proceed, as well as the appointment of key personnel including a Project Manager, Superintendent, Quality Control Manager, and Site Safety and Health Officer. The contract is subject to the Davis-Bacon Act and includes liquidated damages of 2,297 dollars per calendar day of delay. Bids must be submitted in sealed envelopes to the USACE Honolulu District, as electronic submissions are not permitted.
Healy Tibbitts Builders, Inc.

POSTED

about 10 hours ago

DEADLINE

in about 22 hours
View Details
NAICS: 237990
New
Federal
Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project
Solicitation # W9123626BA011
The Sandbridge Beach Erosion and Hurricane Protection Beach Renourishment Project, solicitation W9123626BA011, is a firm-fixed-price construction contract issued by the U.S. Army Corps of Engineers, Norfolk District. The project involves the placement of approximately 2.2 million cubic yards of medium-grained sand across a nourishment area roughly 5.25 miles long and 125 feet wide in Virginia Beach, Virginia. Key technical requirements include the creation of a 50-foot-wide berm at an elevation of 6 feet NGVD and a foreshore slope of 1 vertical foot to 20 horizontal feet. The scope of work encompasses mobilization, dredging, beach fill operations, and specialized environmental services, including sea turtle response, relocation, and trawling. The estimated magnitude of construction is between 25 million and 100 million dollars, with a performance period of 365 calendar days. This unrestricted solicitation is awarded to the lowest responsive and responsible bidder based on the total price of base and option contract line items. Bidders must submit proposals through the PIEE Solicitation Module and provide a bid guarantee, with performance and payment bonds required at 100 percent of the contract price. The project is subject to strict environmental and safety standards, including coordination with the Bureau of Ocean Energy Management and the National Marine Fisheries Service, compliance with OSHA and EM 385-1-1 safety requirements, and adherence to DDESB TP-18 for personnel handling munitions and explosives of concern. Payment is administered monthly via ENG Form 93 through the Resident Management System, based on the volume of material placed and accepted.
W2SD Endist Norfolk

POSTED

about 14 hours ago

DEADLINE

in 4 days
View Details
NAICS: 237990
New
SLED
Eddie Vickers Kayak Launch Construction
Solicitation # 26033
The City of St. Augustine's Community Redevelopment Agency is soliciting bids for the Eddie Vickers Kayak Launch Construction project in the Lincolnville Community Redevelopment Area. This initiative aims to enhance public water access and recreational amenities through the construction of a kayak launch, pier, sidewalks, site furnishings, and a parking area. The scope of work is divided into a Base Bid for the Phase 2C kayak pier and launch, and two Add Alternates covering an ADA-accessible launch, overflow parking, a kayak launch plaza, pedestrian crosswalks, and kayak storage. The project is supported by a grant from the Florida Inland Navigation District providing up to 95,000 dollars in matching funds. Qualified respondents must have completed at least two pier or dock projects and one parking lot project with pedestrian crosswalks within the last five years, and must hold valid marine and concrete/paving licenses. The selection process is based on a staff evaluation committee ranking, with cost effectiveness accounting for 10 percent of the score. The contract is subject to the Davis-Bacon Act for prevailing wages and requires performance and payment bonds for contracts exceeding specific thresholds. All work must comply with Florida Department of Environmental Protection and U.S. Army Corps of Engineers permits, as well as WCAG 2 Level AA accessibility standards. Proposals are due by October 29, 2026.
Community Services

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS