Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Buck Gulch Falls Creek Restoration and Trail Improvement Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.

General Info

Restore creek, upgrade trails, build bridges and boardwalks, limit access, stabilize banks, protect habitat in Novato, California.

Place of Performance

Fairway Drive and Spyglass Drives, Novato, CA, 94942

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Open Space District
Contacts1 person available
OfficeN/A

Interested Companies (1)

PCI EcologicalSebastopol, CA

Full Description

Show more
The purpose of the Buck Gulch Falls Creek Restoration and Trail Improvement Project is to implement MCOSD's Road and Trail Management Plan (RTMP) to provide the public with a safe multi-use trail system to enhance the visitor experience, reduce the environmental impacts on sensitive resources by reducing sedimentation and erosion, and establish a sustainable system of roads and trails that meet design and management standards and provide safe, year-round access along the trail alignment. An additional purpose of the project is to implement the Marin County Parks Inclusive Access Plan (IAP) to the greatest extent feasible, given the existing topography of the project area. The project will meet this purpose by constructing two recreational bridges to cross Arroyo de San Jose Creek on the Spyglass and Buck Gulch Falls Trail; improve conditions along nearly 2,240 feet of existing trail including realigning nearly 850 feet of trail segments away from eroding streambanks, installing one puncheon and one boardwalk over unnamed ephemeral streams along the trail; changing the use of Buck Gulch Falls Trail from hiker/equestrian use to hiker-only use; installing four fill slope walls to retain the trail alignment to retain the trail alignment near the waterfall viewing area; and install new fencing and signage at the waterfall viewing area; decommissioning and restoring nearly 850 feet of trail; and restoring nearly 19,500 square feet of eroding streambank and riparian area along Arroyo de San Jose Creek. These actions will meet the purpose and objectives of the project by eliminating the need to cross Arroyo de San Jose Creek by unimproved rock ford crossings and thereby removing recreational access through the creek, which will result in reduced trail erosion and sedimentation that could adversely impact water quality and listed aquatic species and their habitats and would improve visitor safety. The project will also improve in-stream, riparian, and upland habitats along Arroyo de San Jose Creek through the project area, enhance habitat protection and ecological conditions for listed species, provide safe and sustainable year-round all-abilities access along Spyglass Trail and Buck Gulch Falls Trail leading to Buch Gulch Waterfall consistent with the IAP, and improve trail safety and visitor experience consistent with the RTMP policies, applicable Best Management Practices, and trail design.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
Colgate Penstock Rebuild And Tunnel Repair Project
Solicitation # 11494
The Yuba County Water Agency is soliciting qualifications for the Colgate Penstock Rebuild and Tunnel Repair Project in Dobbins, California. This project utilizes a Construction Manager/General Contractor (CMGC) delivery method, encompassing both preconstruction and construction services. The scope is divided into two primary components: the New Colgate Tunnel Project, which involves localized demolition, concrete repair, and anchor installation, and the Colgate Penstock Rebuild Project, which includes the installation of new penstock sections, foundation construction, excavation, and instrumentation. The project follows a phased timeline with design milestones reaching 100% completion by May 2027, with construction anticipated to begin in early fall 2027. The contract will be awarded on a best-value basis, with evaluation weights focusing heavily on project understanding and approach (20%) and constructability analysis methods (20%), followed by representative project experience (15%) and long-lead procurement strategies (10%). Applicants must demonstrate significant financial and operational capacity, including a minimum bonding capacity of $300 million and general liability insurance of at least $10 million per occurrence. All work must comply with California Department of Transportation Standard Specifications and prevailing wage requirements. Submissions must be submitted electronically via the Euna portal by December 17, 2026.
Yuba County Water Agency

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Norwich Waterfront Revitalization
Solicitation # 27-37
The Norwich Waterfront Revitalization project, managed by the City of Norwich, Connecticut, is a comprehensive construction effort with an anticipated duration of 270 days. The base bid scope includes the construction of a restroom and mechanical building, a combined splash pad and ice rink slab with utilities, a pre-engineered band shell with a concrete stage, and various site improvements such as concrete sidewalks, plazas, stairs, retaining walls, and bituminous concrete pavements. Additionally, the project covers essential storm, water, sewer, and electrical utilities, as well as landscaping. Bid alternates include the Rose Alley Pump Station force main replacement, West Main Street access, restroom building façade upgrades, a restaurant expansion at 150 Chelsea Harbor Drive, and boat launch removal and infill. The contract will be awarded to the lowest responsible and qualified bidder, with evaluation based on skill, ability, integrity, and past performance. For projects valued at $1,000,000 or more, contractors must be prequalified by the Connecticut Department of Administrative Services. Key financial and legal requirements include a 5% bid surety, and performance and payment bonds each equal to 100% of the total proposal price. The contractor must adhere to prevailing wage rates under C.G.S. § 31-53c and maintain commercial general liability insurance. Furthermore, the contract mandates a 25% set-aside for DAS-certified subcontractors, with a specific 6.25% goal for minority, women, and disabled-owned businesses. Proposals must be submitted via the City of Norwich Procurement portal by January 11, 2027.
DAS Procurement

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California → Marin County Open Space District

Same awarding agency

NAICS: 237310
SLED
Cascade Canyon Trail Bridge Project
Solicitation # MCP 2026-07
The Cascade Canyon Trail Bridge Project, solicitation number MCP 2026-07, is a construction contract issued by the Marin County Open Space District for improvements within the Cascade Canyon Open Space Preserve in Fairfax, California. The project focuses on enhancing trail access, improving visitor safety, and reducing environmental erosion through the installation of two prefabricated weathered steel connector style truss recreational bridges with redwood decks. Bridge 1 will be 90 feet long and Bridge 2 will be 60 feet long, both with a width of 6 feet. The scope of work includes constructing concrete spread footings, installing engineered fill for bridge approaches, repairing rock riprap slope protection, and installing compacted road and trail surfaces. Additionally, the contractor will realign existing trails, decommission the High Water Trail and a Canyon Trail spur, and install split rail fencing and signage. The contract will be awarded to the lowest responsible and responsive bidder based on the Total Base Bid. Qualified bidders must hold a valid Class A License and demonstrate significant experience, including the successful completion of at least five similar projects in the San Francisco Bay Area and the submission of three similar or larger bridge project references. The project is divided into two phases: preconstruction activities must begin within 15 calendar days of the first Notice to Proceed, while on-site construction is scheduled to begin no earlier than August 1, 2027, with a duration of 48 working days. Key compliance requirements include adherence to 2025 Caltrans Standard Specifications, California Labor Code Section 6705 for excavation shoring, and the payment of prevailing wages as determined by the California Department of Industrial Relations. Bidders must provide a bid bond for 10% of the total bid amount, and the successful awardee must provide performance and payment bonds equal to 100% of the contract. Required certifications include Equal Employment Opportunity and Subcontractor Debarment and Suspension certifications. Bids must be submitted electronically by December 3, 2026.
Highway, Street, and Bridge Construction

POSTED

15 days ago

DEADLINE

in 17 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS