Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Buck Gulch Falls Creek Restoration and Trail Improvement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Buck Gulch Falls Creek Restoration and Trail Improvement Project aims to restore Arroyo de San Jose Creek and its connected ephemeral streams while enhancing safe, sustainable, and inclusive trail access for all users along Spyglass Trail and Buck Gulch Falls Trail to Buck Gulch waterfall within the Ignacio Valley Open Space Preserve. Key improvements include installing two bridges to redirect visitor traffic away from the creek, adding a puncheon and boardwalk across unnamed streams, upgrading nearly 2,240 feet of existing trail, and realigning 850 feet of trail to move it away from eroding streambanks. The Buck Gulch Falls Trail will transition from hiker/equestrian use to hiker-only, and four fill slope walls will be constructed near the waterfall viewing area to stabilize the trail. Additional enhancements involve installing new fencing and signage, decommissioning and restoring 850 feet of degraded trail, and rehabilitating nearly 19,500 square feet of eroding streambank and riparian habitat. These efforts are designed to reduce environmental degradation, protect water quality, and preserve habitats for listed aquatic species by minimizing sedimentation and erosion. The project will employ erosion control measures such as straw wattles at trail transitions, aggregate base rock surfacing at bridge approaches, and seed and mulch applications on disturbed soils to support revegetation. All work aligns with the Regional Trail Management Plan policies, best management practices, Marin County Open Space District trail design standards, and its Inclusive Access Plan to ensure accessibility and sustainability. The initiative is led by the Marin County Open Space District with primary coordination handled by Senior Natural Resources Planner Jason Hoorn and Principal Environmental Planner Carrie Lukacic. The project was posted in June 2026 and is located in Novato, California, with the goal of creating a resilient, low-impact trail system that balances public access with ecological preservation in a sensitive riparian environment.

General Info

Restore creek, upgrade trails, build bridges and boardwalks, limit access, stabilize banks, protect habitat in Novato, California.

Agency

California → Marin County Open Space District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Fairway Drive and St. Andrews Drive, Novato, CA, 94945

Set-Aside

NONE

Documents

(4)

MCOSD Buck Gulch Falls Creek Restoration Draft ISMND 20260622

PDFismnd

2026-06-22 MCOSD Notice of Intent to Adopt MND for Buck Gulch Falls Project

PDFnotice-of-intent

Buck Gulch Falls Creek Restoration and Trail Improvement Project Notice of Completion

PDFnotice-of-completion

Buck Gulch Falls Creek Restoration and Trail Improvement Project Summary

PDFenvironmental-summary

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marin County Open Space District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Marin County Open Space District
Office AddressN/A
Contacts
Jason HoornSenior Natural Resources Planner
Carrie LukacicPrincipal Environmental Planner

Interested Companies (1)

Show more
PCI Ecological
Sebastopol, CA

Full Description

Show more
Initial Study/Mitigated Negative Declaration. The proposed project would restore Arroyo de San Jose Creek and associated ephemeral streams and to provide safe and sustainable year-round all-abilities access along Spyglass Trail and Buck Gulch Falls Trail leading to Buck Gulch waterfall at Ignacio Valley Open Space Preserve. The proposed project would install two bridges to remove visitor access from the creek; install one puncheon and one boardwalk over unnamed ephemeral streams along the trail; improve conditions along nearly 2,240 feet of existing trail; realign nearly 850 feet of trail segments away from eroding streambanks; change use of the Buck Gulch Falls Trail from hiker/equestrian only to hiker only use; install four fill slope walls to retain the trail alignment near the waterfall viewing area; install new fencing and signage at the waterfall viewing area; decommission and restore nearly 850 feet of trail; and restore nearly 19,500 square feet of eroding streambank and riparian area along Arroyo de San Jose Creek. These actions would meet the project purpose and objectives by reducing the environmental impacts of current visitor access, improving the user experience, safety, and accessibility for all trail users, and enhancing the sustainability of the trail consistent with the RTMP policies, applicable BMPs, and MCOSD's trail design standards and MCOSD's Inclusive Access Plan where feasible. Implementation of the proposed project would substantially reduce the potential for accelerated erosion and sedimentation into the Arroyo de San Jose Creek that could adversely impact water quality and listed aquatic species and their habitats. The proposed project would incorporate erosion control techniques, including placement of straw wattles at the base of realigned trail segments, surfacing the approaches to the proposed bridges with aggregate base rock, and placing of seed and mulch on disturbed ground.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 20 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details