Pixley Travel Center
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Pixley Travel Center project is a large-scale transportation and retail facility to be constructed on 36.47 acres at the northwest corner of Road 124 and Avenue 120 in Pixley, California, encompassing two contiguous parcels with APNs 300-010-005 and 300-010-015. The southern parcel, currently occupied by a cotton-ginning facility that will be demolished prior to construction, will house the primary components including a 20,000-square-foot convenience store, a 3,100-square-foot fast-food restaurant with a drive-thru, 10 diesel fueling islands, two RV fueling islands, 16 gasoline fueling islands, 18 electric vehicle charging stations, an on-site groundwater well serving potable, landscaping, and fire suppression needs, fire-water tanks each holding 80,000 gallons, and extensive truck parking. Ancillary features include an outdoor pet and children’s play area, stormwater management systems with two basins, septic tanks with oil-water separators, and surface grading designed to channel runoff. The northern parcel will be reserved for future development and could include a 17,000-square-foot truck wash and service building along with additional infrastructure. The site will be predominantly paved with asphalt or concrete except for the play areas and stormwater basins. Water usage is projected to peak at 4,000 gallons per day, with wastewater discharge potentially triggering the need for a Waste Discharge Permit if it exceeds 10,000 gallons per day. The facility will rely on private and public providers for electricity, natural gas, garbage removal, and telecommunications, with coordination required to ensure grid capacity supports the EV charging infrastructure. The project requires multiple permits including a demolition permit from Tulare County, a Stormwater Pollution Prevention Plan, and approval for the groundwater well as a Public Water System. Construction is scheduled from January 1, 2026, to June 16, 2027, with defined phases for site preparation, grading, building construction, paving, and architectural coating. Compliance must be maintained with the 2022 California Building Code, ASTM standards for geotechnical testing and inspection, and state environmental regulations including SGMA, LEV III, and the Truck and Bus Regulation. Environmental oversight includes monitoring for cultural resources, paleontological finds, and special-status species, with
General Info
Agency
NAICS
Place of Performance
northwest corner of Avenue 120 and Road 124, CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code