Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Galaxy Solar PV and Storage Project by Galaxy Solar Storage, LLC (Terra-Gen)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Galaxy Solar PV and Storage Project is a large-scale renewable energy initiative led by Galaxy Solar Storage, LLC (Terra-Gen) to develop a 600-megawatt photovoltaic solar facility with up to 4 gigawatt-hours of energy storage capacity on approximately 3,519 acres in southeastern Kern County, California. The project spans 184 privately owned parcels across unincorporated land near Mojave and California City, adjacent to State Route 58, and requires extensive land use modifications including zone changes from A-1 (Limited Agriculture) to A (Exclusive Agriculture) across multiple maps, conditional use permits for solar operations and temporary construction areas, general plan amendments to remove road reservations and reclassify land use designations, and zone variances to accommodate substandard parcel sizes. The project includes the installation of solar panels, inverters, medium-voltage collection lines, transformers, a 230-kV switchyard, an operations and maintenance facility, telecommunications infrastructure, and offsite water storage tanks. A generation-tie line will connect the facility to the existing Windhub Substation, enabling delivery of renewable power to the grid. To facilitate development, multiple vesting tentative parcel maps propose the merger and re-subdivision of 118 parcels into six consolidated parcels totaling over 1,300 acres. Offsite infrastructure requires additional zoning changes and conditional use permits for an off-site switchyard and temporary staging areas. All activities are subject to compliance with Kern County zoning ordinances and environmental review under the California Environmental Quality Act, with public input gathered during a review period ending October 6, 2025. The project aligns with state mandates to achieve 100% carbon-free electricity by 2045 and relies on native revegetation, topsoil restoration, and de-compaction techniques to minimize ecological disruption. No federal contract clauses, pricing data, payment terms, or procurement evaluation criteria are included in the documentation, indicating this is a land use and environmental permitting process rather than a federal acquisition. The primary point of contact is Mark Tolentino of Kern County Planning and Natural Resources Department, with Simon Day of Terra-Gen serving as the developer’s representative.

General Info

Galaxy Solar to build 600 MW solar farm with 4 GWh storage in Kern County, CA, requiring zoning changes and environmental approvals.

Agency

California → Kern County

NAICS

221114 - Solar Electric Power GenerationView NAICS

Place of Performance

39th Street and Sunset Avenue, CA, 93501

Set-Aside

NONE

Documents

(6)

Galaxy Solar PV & Storage Project NOC and Environmental Document Transmittal

PDFnotice-of-completion

Galaxy Solar PV & Storage Project Final Environmental Impact Report Volume 6 Chapter 7 Response to Comments

PDFfeir-response-to-comments

NOP Galaxy Solar PV Storage Project 2025

PDFpresolicitation

Galaxy Solar PV and Storage Project Notice of Completion

PDFnotice-of-completion

CDFW Comment on Galaxy Solar PV and Storage Project NOP 2025081409

PDFcomment

NAHC Comment on CEQA Tribal Consultation Requirements

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts
Mark TolentinoPlanner III
Simon DayVice President – Head of Solar Development

Full Description

Show more
The proposed Galaxy Solar PV and Storage Project is a photovoltaic (PV) solar facility with associated infrastructure necessary to generate up to 600-megawatt (MW) of renewable electrical energy, which may include up to 4 gigawatt-hours (GWh) of energy storage capacity (approximately 1,000 MW), on an approximate 3,400-acre project site, across 162 privately owned parcels, in an unincorporated area of southeastern Kern County, California. A temporary offsite laydown area would be placed adjacent to State Route (SR)-58, at the northern extent of the project site. PV solar panels, a power collection system, including medium-voltage (MV) lines that connect the solar facilities, inverters, a switchyard, foundations, and transformers will be installed onsite. Associated project infrastructure includes an operations and maintenance (O&M) facility, telecommunication facilities, energy storage system(s), an onsite collector substation, a 230-kV switchyard, and offsite water storage tanks for construction and operation. The proposed project also includes a generation-tie (gen-tie) line to connect the project to the existing Windhub Substation. Implementation of the project as proposed includes the following land use entitlement requests: Zone Change (a) Zone Classification Change No. 5, Map 195 from A-1 (Limited Agriculture) to A (Exclusive Agriculture) on approximately 966.77 acres; (b) Zone Classification Change No. 4, Map 212 from A-1 (Limited Agriculture) to A (Exclusive Agriculture) on approximately 2,344.05 acres; Conditional Use Permit (a) Conditional Use Permit No. 4, Map 195, to allow for the construction and operation of a solar facility up to 150 MW and associated infrastructure, including energy storage, a switchyard, and temporary construction staging and equipment storage on approximately 966.77 acres in an A (Exclusive Agriculture) District, pursuant to Chapter 19.12.030.G and 19.12.030K of the Kern County Zoning Ordinance. (b) Conditional Use Permit No. 5, Map 195, to allow for a temporary construction laydown area on approximately 17.4 acres of a 41.62 acre parcel, pursuant to Chapter 19.12.030.G and 19.12.030.K of the Kern County Zoning Ordinance. (c) Conditional Use Permit No. 7, Map 212, to allow for the construction and operation of a solar facility up to 450 MW and associated infrastructure, including energy storage, a switchyard, and temporary construction staging and equipment storage on approximately 2,146.29 acres in an A (Exclusive Agriculture) District, pursuant to Chapter 19.12.030.G and 19.12.030K of the Kern County Zoning Ordinance; General Plan Amendment (Circulation) (a) General Plan Amendment No. 5, Map 195, to the Circulation Element of the Kern County General Plan (General Plan) to remove future road reservations on section and mid-section lines within the project boundary; (b) General Plan Amendment No. 6, Map 212, to the Circulation Element of the General Plan to remove future road reservations on section and mid-section lines within the project boundary; (c) General Plan Amendment No. 7, Map 212, to the Open Space, Land Use, and Conservation Element of the General Plan to re-designate two parcels (APNs 244-233-06 and 244-421-01) from General Plan Designation 3.3 (Other Facilities) to General Plan Designation 8.5 (Resource Management). Zone Variance: (a) Zone Variance No. 1, Map 195, to authorize multiple parcels of substandard size where a minimum of 20 acres is required for each change in base zoning from the A-1 (Limited Agriculture) District to the A (Exclusive Agriculture) District across approximately 40.92 total acres. (b) Zone Variance No. 2, Map 212, to authorize multiple parcels of substandard size where a minimum of 20 acres is required for each change in base zoning from the A-1 (Limited Agriculture) District to the A (Exclusive Agriculture) District across approximately 12.66 total acres Vesting Tentative Parcel Maps: (a) Vesting Tentative Parcel Map No. 12577—Proposing a merger and re-subdivision of three (3) parcels into one (1) parcel of Case Map 195, Section 28, Township 11 North, Range 11 West, of County of Kern, consisting of 23.02 acres (gross), resulting in a 23.02 acre (gross) parcel. (b) Vesting Tentative Parcel Map No. 12578—Proposing a merger and re-subdivision of twenty-eight (28) parcels into one (1) parcel of Case Map 195, Section 33, Township 11 North, Range 11 West, of County of Kern, consisting of 302.32 acres (gross), resulting in a 302.32 acre (gross) parcel. (c) Vesting Tentative Parcel Map No. 12579—Proposing a merger and re-subdivision of six (6) parcels into one (1) parcel of Case Map 195, Section 34, Township 11 North, Range 11 West, of County of Kern, consisting of 157.93 acre acres (gross), resulting in a 157.93 acre (gross) parcel. (d) Vesting Tentative Parcel Map No. 12580—Proposing a merger and re-subdivision of twenty-seven (27) parcels into one (1) parcel of Case Map 212, Section 4, Township 10 North, Range 11 West, of County of Kern, consisting of 90.81 (acres (gross), resulting in a 90.81 acre (gross) parcel. (e) Vesting Tentative Parcel Map No. 12581—Proposing a merger and re-subdivision of fifty-two (52) parcels into one (1) parcel of Case Map 212, Section 4, Township 10 North, Range 11 West, of County of Kern, consisting of 298.29 acres (gross), resulting in a 298.29 acre (gross) parcel. (f) Vesting Tentative Parcel Map No. 12582—Proposing a merger and re-subdivision of twenty-four (24) parcels into one (1) parcel of Case Map 212, Section 8, Township 10 North, Range 11 West, of County of Kern, consisting of 500.58 acres (gross), resulting in a 500.58 acre (gross) parcel. Offsite Features: (a) Zone Classification Change No. 5, Map 212 from A-1 (Limited Agriculture) to A (Exclusive Agriculture) to facilitate installation of offsite water storage tanks for construction and operations on approximately 20.26 acres; (b) Zone Classification Change No. 57, Map 197 from A-1 (Limited Agriculture) to A (Exclusive Agriculture) to facilitate installation construction and operation of an off-site switchyard and temporary construction and equipment storage on approximately 34.82 acres; (c) Conditional Use Permit No. 24, Map 197, to allow for the construction and operation of an off-site switchyard and temporary construction staging and equipment storage on approximately 29.4 acres in an A (Exclusive Agriculture) District, pursuant to Chapter 19.12.030.G and 19.12.030K of the Kern County Zoning Ordinance; (d) Zone Variance No. 21, Map 197, to authorize multiple parcels of substandard size where a minimum of 20 acres is required for each change in base zoning from the A-1 (Limited Agriculture) District to the A (Exclusive Agriculture) District across approximately 34.82 total acres.

Similar Contracts

Same NAICS industry code

NAICS: 221114
New
SLED
Power Purchase Agreement For Solar Photovoltaic Systems
Solicitation # 26-27-04
The Chino Valley Unified School District is soliciting proposals for a 20-year Power Purchase Agreement to develop, install, own, and operate approximately 5.5 MW of solar photovoltaic capacity across three district-owned sites in Chino, California. The selected provider is responsible for the entire project lifecycle, including design, Department of State Architect approval, construction, and ongoing maintenance, with the goal of selling generated energy back to the District. Parking canopy systems are highly preferred, while roof-mounted systems are strictly prohibited. The District requires a solution with no out-of-pocket costs, including legal and inspection fees, and a production guarantee of at least 90 percent of estimated annual output. Proposals are due by October 5, 2026, and will be evaluated based on a 150-point scale focusing on pricing, expertise, technical specifications, and team qualifications. Key requirements for respondents include a California Class B license, DIR registration, a Worker's Compensation Experience Modification Rate of 1.25 or less, and a clean safety record with CAL OSHA over the last five years. Financial guarantees include a 100 percent construction cost performance and payment bond for one year and a 500,000 dollar letter of credit to be held until DSA closeout. The contract also stipulates liquidated damages of 500 dollars per day for delays beyond the commercial operation dates and adherence to California Prevailing Wage laws.
Chino Valley Unified School District

POSTED

5 days ago

DEADLINE

in 14 days
View Details
NAICS: 221114
SLED
Solar Services - Eagleville Campus
Solicitation # 26-48
Montgomery County Pennsylvania is soliciting proposals for the design, installation, and maintenance of commercial-scale solar photovoltaic systems at the Eagleville Campus to meet approximately 95 percent of the site's annual electricity needs. The project requires a firm to provide comprehensive Engineering, Procurement, and Construction services, including geotechnical surveys, structural assessments, permitting, and interconnection with PECO. The County is seeking a Power Purchase Agreement using FEOC-compliant equipment, with a preference for equipment meeting Build America Buy America requirements. Selected firms must coordinate with an existing professional engineering consultant and account for approximately 160,000 dollars in remaining grant funding. The contract will be awarded based on best value, emphasizing demonstrated experience with at least five similar projects and the employment of at least three NABCEP PVIP-Certified professionals. Proposals must be submitted via the Bonfire portal as separate technical and cost documents, accompanied by a W9 and completed certifications regarding business status and conflicts of interest. The project includes strict compliance with federal grant addendums, including nondiscrimination and audit provisions. Final acceptance requires the system to be fully commissioned with drone thermal imaging and the procurement of official permission to operate.
Montgomery County Pa

POSTED

10 days ago

DEADLINE

in 18 days
View Details
NAICS: 221114
SLED
Royalston Solar Landfill RFP
Solicitation # BD-27-1321-TORTH-TORTH-133367
The Town of Royalston, Massachusetts, is soliciting proposals from qualified renewable energy developers to design, permit, finance, construct, operate, maintain, and decommission a Solar Generating Facility (SGF) at the Royalston Landfill located at 6 Town Dump Road. The project involves a 78-acre site and seeks a facility capacity between 1 and 6 MW AC, with the potential for battery energy storage systems. The Town's primary objective is to establish a long-term land lease or Power Purchase Agreements (PPAs) for a period not to exceed 30 years to generate financial benefits, energy savings, and ensure the protection of the landfill cap. Proposals are due by October 8, 2026, with a suggested project start date in Spring 2027. Qualified proposers must demonstrate significant technical expertise, including at least one primary staff member registered as a Massachusetts Professional Engineer (Civil) for at least 10 years and a track record of completing at least three similar projects. The selection process will be based on the most advantageous proposal, weighing price against qualifications, technical capacity, and the specific financial benefits offered to the Town. Key requirements include a detailed plan of services, a conceptual site plan, and comprehensive decommissioning financial security. Developers are also responsible for managing utility interconnection risks and adhering to strict environmental and forestry protections, as merchantable timber remains Town property. Required submissions must include signed certifications regarding non-collusion, tax compliance, and non-discrimination.
TORTH - Town of Royalston - Town Hall

POSTED

11 days ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS