Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Imperial County Lithium Valley Specific Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

In 2022, California enacted Senate Bill 125 to authorize the development of lithium resources within the Salton Sea Known Geothermal Resource Area, known as Lithium Valley, in Imperial County. This legislative initiative established the Lithium Valley Specific Plan (LVSP) as the foundational regulatory framework to guide land use, zoning, and economic development around the southeastern edge of the Salton Sea. The LVSP redefines permissible land uses to include green industrial activities such as geothermal energy production and lithium mineral extraction, alongside manufacturing of lithium-based batteries, logistics, renewable energy installations, solar development, playa restoration, floodplain management, and conservation zones, all under an agricultural overlay. The plan incorporates amendments to the County’s General Plan and Zoning Ordinance to align with a sustainable, localized economic model that prioritizes job creation and environmental stewardship. Funding for the plan’s implementation, including the preparation of a Program Environmental Impact Report (PEIR), comes from a newly adopted lithium excise tax, which also supports Salton Sea restoration and community investments. The environmental and land use evaluation of the proposed development relies on the California Agricultural Land Evaluation and Site Assessment (LESA) Model to determine the significance of converting agricultural land. This model weighs land capability and soil quality at 50% and site-specific factors such as project size, water availability, and proximity to protected or agricultural lands at the remaining 50%. Projects scoring above 60 on the LESA scale are considered environmentally significant, triggering deeper CEQA review. While the plan does not function as a traditional procurement contract, regulatory compliance is enforced through state and county oversight, with Imperial County serving as the lead agency for environmental review for projects under 50 MW, and the California Energy Commission overseeing larger developments. Hazardous materials handling during construction and operations must comply with DOT and California hazardous waste regulations, including proper labeling, manifesting, and safety documentation per 49 CFR 172 and CCR Title 13. Inspection and acceptance responsibilities rest with governmental agencies, not contractors, with quality standards derived from the California Building Code, Cal/OSHA regulations, and NPDES stormwater permits. The project is strategically positioned to advance national renewable energy goals by enabling domestic production of critical minerals essential for modern battery technologies, while simultaneously revitalizing the ecological and economic health of the Imperial Valley region.

General Info

California authorizes lithium extraction and green industry in Salton Sea area with tax-funded restoration and strict environmental review.

Agency

California → Imperial County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(32)

LVSP Draft Program Environmental Impact Report Notice of Availability

PDFspecial-notice

Imperial County Lithium Valley Specific Plan PEIR Notice of Completion

PDFnotice-of-completion

Caltrans Comments on Lithium Valley Specific Plan DEIR SCH #2023120104

PDFcomment

Appendix D Biological Resources Technical Report Lithium Valley Specific Plan

PDFtechnical-report

Imperial County Lithium Valley Specific Plan Summary

PDFenvironmental-summary

Appendix A-2 General Plan Amendments - Imperial County Agricultural Element

PDFgeneral-plan-amendment

Appendix L-1 Water Supply Assessment for Lithium Valley Specific Plan

PDFwater-supply-assessment

Extension Request for Comments on Imperial County Lithium Valley Specific Plan DEIR

PDFcomment-extension-request

Appendix J1 VMT Memo for Lithium Valley Specific Plan

PDFtechnical-memorandum

DRAFT Lithium Valley Specific Plan Program Environmental Impact Report SCH# 2023120104

PDFenvironmental-impact-report

Appendix C AQ-GHG-HRA Technical Report

PDF

2023120104_SLC Comment on Lithium Valley Specific Project PEIR

PDFcomment-letter

SCH #2023120104 Imperial County Lithium Valley Specific Plan Memorandum

PDFmemorandum

Appendix B-2 NOP Comments - Lithium Valley Specific Plan Public Comments

PDFother

CEC Comments on Lithium Valley Specific Plan Draft PEIR

PDFcomment

Appendix F Land Evaluation Site Assessment (LESA) Analysis for Lithium Valley Specific Plan

PDFland-evaluation-site-assessment

2023120104_DDW Comment

ZIP

Appendix I Noise Technical Report for Imperial County Lithium Valley Specific Plan

PDFtechnical-report

Appendix A-1 February 2025 Lithium Valley Specific Plan

PDFspecific-plan

2023120104_DOT Comment 2

ZIP

___SCH 2023120104_Extension_Memo

ZIP

_2023120104 Apx E LVSP Cultural Report_1-15-2026_OCR

ZIP

Appendix H Infrastructure Assessment January 2024

PDFinfrastructure-assessment

Response to DOT Comment on Imperial County Lithium Valley Specific Plan DEIR SCH# 2023120104

PDFresponse-to-comment

Appendix L-2 IID Canals - Imperial Irrigation District Lateral Capacities

PDFspecifications

SCH 2023120104 Imperial County Lithium Valley Specific Plan Review Extension Memo

PDFmemorandum

CDFW Comments on Lithium Valley Specific Plan DPEIR SCH# 2023120104

PDFcomment

Appendix G Proposed Land Use Designation Hazardous Material Hazardous Waste

PDFother

Appendix J2 Transportation Report

PDF

DTSC Comments on Imperial County Lithium Valley Specific Plan DEIR

PDFcomment

Comments on Environmental Impact Report for Imperial County Lithium Valley Specific Plan Project

PDFdoc-comments

Imperial County Lithium Valley Specific Plan NOP Initial Study

PDFpresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Imperial County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Imperial County
Office AddressN/A
Contacts
Jim MinnickPlanning & Development Services Director
Matt ValerioSenior Project Manager

Interested Companies (1)

Show more
Dudek
Encinitas, California

Full Description

Show more
On June 30, 2022, Governor Gavin Newsom signed into law Senate Bill (SB) 125 authorizing the state to assist in developing Imperial County’s lithium resource in an area that is a part of the Salton Sea Known Geothermal Resource Area, known as Lithium Valley. SB 125 appropriated funding to develop a Lithium Valley Specific Plan (LVSP) and PEIR, and adopted a lithium excise tax to fund Salton Sea restoration efforts and to fund affected communities. The LVSP facilitates renewable energy development, lithium extraction, associated infrastructure, commercial, and related manufacturing industries, which provide quality local jobs, while minimizing adverse effects on the environment and public health. The LVSP would serve as the land use and zoning regulations on the southeastern side of the Salton Sea. The Project would change the permissible land uses, to include Green Industrial (e.g. geothermal energy, lithium/mineral extraction), Manufacturing (e.g. lithium batteries), Logistics, Renewables, Community Opportunity Areas, Solar, Playa Restoration, Floodplains, and Conservation, with an Agricultural Overlay. This Project would be a pivotal step for Imperial Valley towards a more sustainable and localized economy and support the nations’ ability to produce sustainable energy and technologies. The Project also includes amendments to the County General Plan and Zoning Ordinance /Map.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
Environmental and Site Assessment ServicesThe contract seeks environmental and site assessment services for a leased facility located in Rutland, Massachusetts, with a primary focus on Phase I and Phase II environmental site assessments, asbestos surveys, and structural evaluations to ensure full compliance with regulatory and safety standards. These services are critical to identifying potential environmental contaminants, validating the presence or absence of asbestos-containing materials, and assessing the structural integrity of the facility prior to occupancy or operational use. The work must be conducted in accordance with applicable federal, state, and local environmental and health safety regulations to mitigate risks and ensure ongoing compliance. The solicitation is classified as a subcontract under NAICS code 541620, which pertains to environmental consulting services, and the proposal submission deadline is October 1, 2026, at 5:00 PM. The place of performance is specifically identified as Main Street in Rutland, with a ZIP code of 01543. The contracting entity is the Central Massachusetts Regional Emergency Communication Center under the Massachusetts agency, though no point of contact or set-aside provisions are specified. The contract is accessible via a public posting on the Commbuys platform, and all responsive offers must meet technical, regulatory, and compliance requirements to be considered for award.
CMR01 - Central Massachusetts Regional Emergency Communication Center

POSTED

about 21 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 541620
New
SLED
Environmental & Archaeological AssessmentThe contract encompasses a comprehensive environmental and archaeological assessment to support permitting under the National Environmental Policy Act and Section 106 of the National Historic Preservation Act. It requires the performance of a Phase I Environmental Site Assessment to identify potential contamination, a wetland delineation to determine the extent and boundaries of wetland areas, and archaeological surveys to evaluate the presence of culturally significant resources. These activities are essential for documenting environmental and historical conditions prior to any proposed development or infrastructure projects in Dawson County, Georgia. The work must be conducted in accordance with federal regulatory standards to ensure compliance and facilitate the permitting process. This is a subcontract opportunity posted by the Development Authority of Dawson County, with a response deadline of September 7, 2026. The North American Industry Classification System code 541620 indicates the work falls under environmental consulting services. The performance location is within Georgia, though specific site details are not provided. Interested parties must submit proposals by the stated deadline to be considered, and all activities are intended to support regulatory compliance and due diligence for future development initiatives in the region.
Development Authority of Dawson County

POSTED

about 22 hours ago

DEADLINE

in 30 days
View Details
NAICS: 541620
New
SLED
Environmental Compliance and Historic Site ProtectionThe contract requires full compliance with federal regulations concerning the protection, evaluation, and restoration of historic or prehistoric sites that may be affected by project activities. This subcontract, categorized under NAICS code 541620, mandates that all work be conducted in accordance with established standards to preserve cultural resources, ensuring that any disturbance to significant sites is properly assessed, mitigated, and, where necessary, restored. The awardee must implement measures to identify, document, and safeguard these sites throughout the duration of the project, with specific attention to regulatory frameworks governing federal lands and federally funded initiatives. The solicitation was posted on August 7, 2026, with responses due by August 25, 2026, and is issued by the Utah agency under the Utah state designation. Although specific location details for performance or contact are not provided, the scope of work is tied to any project activity within Utah that impacts historic or prehistoric resources. The obligation extends beyond mere monitoring to include proactive evaluation and, when appropriate, restoration protocols that align with federal preservation mandates. Contractors must demonstrate proven experience and technical capability in cultural resource management to meet the stringent requirements of this agreement.
Utah

POSTED

about 22 hours ago

DEADLINE

in 17 days
View Details
NAICS: 541620
New
SLED
Environmental Compliance and MonitoringThe contract involves comprehensive environmental compliance and monitoring services focused on stormwater management, erosion control oversight, and regulatory reporting throughout the construction phase. The work is tied to a project under the Haralson County School District in Georgia and requires adherence to established environmental regulations, ensuring that construction activities do not negatively impact surrounding ecosystems or water resources. The contractor will be responsible for implementing and maintaining effective erosion and sediment control measures, conducting regular site inspections, documenting compliance efforts, and submitting required reports to regulatory authorities as needed. This subcontract is categorized under NAICS code 541620, which corresponds to environmental consulting services, indicating a professional scope centered on technical environmental management rather than physical construction. The solicitation was posted on August 7, 2026, with a response deadline set for September 9, 2026, providing interested parties a limited window to submit proposals. Performance is expected to occur in Georgia under the jurisdiction of the Haralson County School District, though specific site locations are not detailed in the provided data. The contract emphasizes continuous regulatory alignment and accurate documentation, making it critical that the selected vendor has demonstrated expertise in environmental monitoring and compliance reporting within construction environments.
Haralson County School District

POSTED

about 23 hours ago

DEADLINE

in about 1 month
View Details