Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Black Rascal Flood Control Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Black Rascal Flood Control Project, led by Merced County, involves the construction of flood control infrastructure within the Black Rascal Creek watershed in California. The scope of work includes the creation of a flood detention basin, a basin outlet structure, a 350-foot spillway, and the realignment of a 1,700-foot section of Black Rascal Creek. Additional requirements include the installation of drainage facilities such as culverts and headwalls, access road work, and the restoration of disturbed areas using weed-free native seed mix. A key utility component involves the relocation of a PG&E electric utility pole 100 feet to the north and the authorization of six existing poles within the expanded floodway under Permit No. 20023. The project is subject to strict environmental and regulatory compliance, including the California Endangered Species Act Incidental Take Permit No. 2081-2021-096-04 for the protection of the California tiger salamander and Swainson's hawk, and Lake and Streambed Alteration Agreement EPIMS-MER-26316-R4. Construction of the detention basin is estimated to take 18 months over a two-year period, with work restricted to the dry season between April 1 and October 31 and conducted during standard 8-hour day shifts. The project also requires permits from the U.S. Army Corps of Engineering under Sections 404 and 408, as well as approval from the Central Valley Flood Protection Board.

General Info

Merced County will build Black Rascal flood infrastructure with strict environmental regulatory compliance.

Agency

California → Merced County

Place of Performance

Merced, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Merced County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Merced County
Office AddressN/A
Contacts
Shaelyn LatronicaEnvironmental Scientist
Oscar OrtizLead Agency Contact

Full Description

Show more
This proposed project involves the construction of a flood detention basin, realignment of 1700-foot section of Black Rascal Creek, a basin outlet structure, a 350-foot-long spillway constructed adjacent to the basin outlet, drainage facilities (culverts, headwalls, and end treatments at three locations within the Project), access road work, staging areas, and aquatic, riparian and upland habitat enhancements within the Project footprint. Following the completion of all Project activities, all remaining work areas will be graded and restored to as close to pre-project contours as feasible. All areas subject to ground disturbance will be revegetated with hydroseeding or hand seeding with a weed-free native seed mix unless otherwise required by the property landowner. Construction of the detention basin will take approximately 18 months to complete and will occur over a 2-year period during the dry season (April 1 through October 31). It is assumed that all work will be conducted during the day within a normal 8-hour shift between 7:00 a.m. and 6:00 p.m. The Project will result in impacts to 1.794 acres of California tiger salamander (Ambystoma californiense, CTS) habitat and 40.69 acres of Swainson’s hawk (Buteo swainsoni) habitat, including temporary impacts to 1.6 acres of CTS upland habitat and 40.69 acres of Swainson’s hawk foraging habitat; the Project will permanently remove 0.194 acres of CTS breeding habitat. The Project is expected to result in incidental take of CTS and Swainson’s hawk, which are both designated as threatened species under the California Endangered Species Act. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation. Minor Amendment No. 1 extends the expiration date from January 31, 2027, to January 31, 2032. The Project is delayed pending the approval of the following permits associated with the Project: (1) U.S. Army Corps of Engineering (USACE) Section 404 permit No. SPK-2021-00278; (2) USACE Section 408 permit No. 19653; and (3) Central Valley Flood Protection Board Encroachment Permit No. 19643.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS