Staff Gage Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The El Dorado Irrigation District plans to replace three damaged staff gages located in Pleasant Valley, Cameron Park, and Quintette to restore accurate monitoring of creek water levels. The existing gages, rendered unusable by high flows from storm events, will be carefully removed using excavator claw tools or hand tools to avoid disturbing the streambed and banks. New gages will consist of 4-6 inch wide, 6-8 foot long steel I-beams with integrated rulers, installed either by driving them 1-2 feet into the creek bed using mechanical or manual methods or securing them to adjacent boulders with rock anchor bolts. All work within the wet channel will be conducted by hand crews to minimize environmental impact, while equipment like excavators will remain outside the waterway. Activities are scheduled for the dry season to coincide with naturally low creek flows, reducing disruption and improving safety and efficiency. The project is set to start in late summer 2026 and is expected to last approximately 10 weeks.
General Info
Agency
NAICS
Place of Performance
Sly Park Road and Clear Creek Road, CA, 95667Set-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
