Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Russian River Telemetry Study

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Russian River Telemetry Study aims to modernize water measurement and reporting practices for the California State Water Resources Control Board’s Division of Water Rights by deploying a network of up to 125 telemetered gage stations and associated telemetry gateways across the Russian River watershed. This initiative seeks to improve the accuracy, timeliness, and reliability of water data collection by transitioning from manual to automated, real-time reporting systems, enhancing compliance monitoring and water rights administration. The project will focus on sites throughout the watershed to capture critical flow and usage data, supporting more informed water management decisions. The effort is being led by the SWRCB Division of Water Rights in California, with Christian Fehrenbacher, Water Resource Control Engineer, serving as the primary point of contact. The study is publicly listed with a posted date of July 31, 2026, and is designated as a forecast under the CEQA Net system, indicating its preliminary planning stage. No solicitation number or NAICS code has been assigned at this time, and the project’s full scope, including environmental considerations and technical specifications, is detailed in the uploaded Study Description accompanying the Notice of Exemption. Installation and deployment will occur within California’s Russian River region, with no specific city or zip code designated for the office or performance location.

General Info

Deploy 125 telemetered gage stations in Russian River watershed for real-time water data and compliance monitoring.

Agency

California → SWRCB, Division of Water Rights

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Various locations throughout the Russian River watershed, within Sonoma and Mendocino Counties, CA

Set-Aside

NONE

Documents

(2)

RRT_Study-Description_7-30-26_ACC-ocr

PDF

RRT_NOE_7-30-26_SIGNED-ocr

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Rights
Contacts1 person available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Rights
Office AddressN/A
Contacts
Christian FehrenbacherWater Resource Control Engineer

Full Description

Show more
The Russian River Telemetry Study is proposed to modernize the SWRCB Division of Water Rights' water measurement and reporting by evaluating the use of telemetry in reporting gage data. It will install up to 125 telemetered gage stations and telemetry gateways at sites throughout the Russian River watershed. Additional information is provided in the Study Description uploaded with the Notice of Exemption.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details