Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on June 11, 2012. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Directional Boring

Closed
W911KB-12-R-0036Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237130
New
SLED
Term Agreement with 4 Options to Renew - Fiber Optic Maintenance, Repair and Modernization for IT, Transportation, and Water Departments
Solicitation # REQ00003176
The City of Garland is soliciting bids for a term agreement under solicitation REQ00003176 to provide fiber optic maintenance, repair, and modernization services for its IT, Transportation, and Water Departments. The contract consists of an initial twelve-month term with four optional twelve-month renewal periods. The City intends to award the contract to the two highest-ranked respondents, designating one as the primary contractor and the other as the secondary contractor to ensure redundancy and emergency response capacity. Award decisions are based on best value, evaluated through overall qualifications, client references, and relevant project examples. The scope of work requires the contractor to provide all labor, materials, and equipment for installation, troubleshooting, and emergency repairs of critical infrastructure, including public safety and SCADA systems. Critical priority outages require a two-hour response time. Deliverables include schematic diagrams, OTDR test files, and as-built drawings, with a minimum two-year workmanship warranty required for all services. Bidders must submit comprehensive bids on all items to be considered responsive, adhering to Texas Government Code Chapter 2258 for prevailing wage rates. Materials are to be billed at actual cost plus a markup not exceeding 10 percent. All submissions must be made electronically via the IonWave portal by November 5, 2026.
City Of Garland

POSTED

about 12 hours ago

DEADLINE

in 16 days
NAICS: 237130
New
SLED
North State And Hwy 101 Utility Infrastructure Boring Project
Solicitation # 26-02
The City of Ukiah, Department of Electric Utility, is soliciting bids for the North State and Hwy 101 Utility Infrastructure Boring Project (Solicitation #26-02). This project involves the installation of utility infrastructure through horizontal directional drilling (HDD) and trenching at North State Street and Highway 101 in Ukiah, California. The scope of work includes 1,375 linear feet of HDD and 142 linear feet of trenching, backfilling, and compaction. Key deliverables include the installation of various HDPE and PVC conduits ranging from 1.25 to 6 inches and the installation of six fiber service vaults. The contract will be awarded to the lowest responsive and responsible bidder based on the lowest Base Bid. Eligible bidders must possess a valid State of California Class A Contractor's License and be registered with the Department of Industrial Relations. Submission requirements include a detailed proposal with unit pricing, a Fair Employment Practices Certification, a notarized Non-Collusion Affidavit, and a statement of experience. Bids must be accompanied by a 10 percent bid security. Upon award, the contractor is required to provide a performance bond for 100 percent of the total contract price, as well as a payment bond and appropriate insurance certificates. The City will provide engineering personnel for inspections, and the contractor is responsible for ensuring all materials are stored to preserve quality and fitness for the work. The response deadline for this solicitation is December 1, 2026.
City of Ukiah

POSTED

about 20 hours ago

DEADLINE

in about 1 month
NAICS: 237130
New
SLED
Broadband Implementation Project - FFA
Solicitation # 2001063
The Broadband Implementation Project - FFA, solicitation number 2001063, is a comprehensive infrastructure initiative for the City of San Luis Obispo, California. The project involves the installation of aerial and underground fiber optics, including directional boring for conduit, deep bore casing, and the installation of 288 CT fiber cable. The scope of work encompasses the placement of various sized vaults, copper clad ground rods, pole risers, down guys, anchors, and new wooden poles, as well as cut and kick operations for existing poles. Additional requirements include potholing, tree trimming, public notification, and strict compliance with CPUC grant reporting and archaeological monitoring. The project is structured with a base bid and five additive alternates covering specific street segments, with award decisions based on a total project bid hierarchy capped at 2,400,000 dollars. Contractors must adhere to stringent technical and regulatory standards, including CPUC General Order 95, Caltrans 2024 specifications, and the City of San Luis Obispo 2025 Engineering Standards. Key requirements include the submission of OTDR bi-directional testing results prior to acceptance and the employment of directional drilling personnel with at least two years of experience. Bidders must provide a bid guaranty of 10 percent of the bid amount and, upon award, provide performance and payment bonds equal to 100 percent of the contract price. Compliance with California Labor Code is mandatory, requiring registration with the Department of Industrial Relations and adherence to prevailing wage laws. Sealed bids are due by 11:00 a.m. on November 19, 2026, to the Public Works Administration Office in San Luis Obispo.
City of San Luis Obispo

POSTED

about 20 hours ago

DEADLINE

in 30 days
NAICS: 237130
New
SLED
24-17.11
Solicitation # 24-17.11
The City of Piqua, Ohio, is soliciting bids for Project No. 24-17.11, which involves the construction of the Washington Road 69kV Transmission Line. The scope of work includes the furnishing and installation of approximately 2.0 miles of 69kV transmission line terminating at a new 69kV/13.8kV substation. Key technical requirements include a 12.47kV distribution underbuild from Pole P1 through Pole P18, the installation of all-dielectric self-supporting fiber optic cable along the entire line, and the use of both contractor-furnished materials and owner-furnished self-supporting steel poles. The project has an engineer's estimate of $1,900,000 and requires adherence to the National Electrical Safety Code and various ASTM standards for ductile iron poles and fiberglass crossarms. Bidders must provide evidence of financial and performance experience and are required to submit a bid bond of at least 10% of the total bid amount. The successful contractor must post a combined performance and payment bond for 100% of the contract value. Compliance with State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications is mandatory. Bids must be submitted via Bid Express, email, or sealed hard copy by October 29, 2026. All equipment must be delivered FOB Destination to the City of Piqua, and any bids specifying FOB Factory will be rejected.
City of Piqua

POSTED

1 day ago

DEADLINE

in 8 days
NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and bus support structures. The contractor is responsible for comprehensive site work, including minor clearing, excavation, structural fill, grounding for all equipment, and the installation of above-ground conduits. The project also requires assistance with the start-up and commissioning of all mechanical, electrical, and electronic systems. Bidders must adhere to strict compliance standards, including State of Ohio Prevailing Wage laws, the Americans with Disabilities Act, and Drug-Free Workplace certifications. A bid bond of no less than 10 percent is required, and the successful contractor must provide performance and payment bonds equal to the full contract price. Award selection will be based on a comparison of relative merits and the lowest and best bid. Technical execution must follow NESC, NEC, IEEE, and ANSI standards, with specific quality controls for concrete foundations and equipment shipment integrity. Performance penalties of $500 per calendar day apply for deliveries exceeding the designated completion date.
City of Piqua

POSTED

1 day ago

DEADLINE

in 9 days

General Info

Contract Value

$118,000

NAICS

237130 - Power and Communication Line and Related Structures Construction

Place of Performance

North Pole, Chena Alaska, AK, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

4

CHENA+FIBER+OPTICS+FIGURE+1.pdf

PDF

CHENA+FIBER+OPTICS+FIGURE+2.pdf

PDF

CHENA+FIBER+OPTICS+FIGURE+3.pdf

PDF

CHENA+FIBER+OPTICS+FIGURE+4.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA
Contacts
Justin L. DeArmondContracting Officer

Full Description

Show more
Bid Schedule Chena Fiber Optic Road Borings May 29, 2012 North Pole, Alaska Item Description Quantity Unit Unit Price Amount 1 Mobilization/Demobilization 1 Lump Sum tiny_mce_marker_____ tiny_mce_marker_____ 2 Crossing 1 1 Lump Sum tiny_mce_marker_____ tiny_mce_marker_____ Option 1 Crossing 2 1 Lump Sum tiny_mce_marker_____ tiny_mce_marker_____ Option 2 Crossing 3 1 Lump Sum tiny_mce_marker_____ tiny_mce_marker_____ Option 3 Crossing 4 1 Lump Sum tiny_mce_marker_____ tiny_mce_marker_____ Total: tiny_mce_marker_____ ? Scope of Work ROAD BORING SERVICES Chena Fiber Optic Road Borings May 29, 2012 North Pole, Alaska 1.0 GENERAL The U.S. Army Corps of Engineers - Alaska District (USACE-AD) is installing a fiber optic line on the Moose Creek Dam project in North Pole, Alaska. This scope of work will accomplish directional drilling under three (3) roads and one (1) seepage collector channel. Locations of crossings can be found on Figures 2 and 3. The USACE-AD will provide locations of where the drilling shall start and excavate opening if necessary to start directional drilling operations. The Drill Contractor shall provide all associated materials, labor, supplies, hazardous and toxic waste (HTW) spill clean-up supplies, drill rig, and support equipment to perform the planned work. 1.1 LOCATION OF WORK The Chena Fiber Optic project is located at the Moose Creek Dam which is part of the Chena River Lakes Flood Control Project in North Pole, Alaska southeast of Fairbanks. A project location and vicinity map is presented in the enclosed Figure 1. The Contractor should expect to encounter fill soils, silts, sands, and gravels with an occasional cobble. The fill and native soils are generally loose to dense. Borings will start at a point indicated by USACE personnel. Conditions may require different drill carriages (track or truck-mounted) and the contractor is responsible for mobilizing the most appropriate drill for the conditions at the site. 2.0 STATEMENT OF WORK The Contractor shall furnish an experienced driller and drill helper, drill rig, equipment, transportation, and materials necessary to complete the following work: Provide the directional boring of one (1) crossings with three (3) optional crossings along the Moose Creek Dam. Each crossing shall be with an minimum of 8" HDPE or equivalent pipe that is able to fit two (2) three-inch diameter inner ducts for fiber optic cable. Each boring shall progress to a minimum of four (4) feet below road crossings and ten (10) feet below the seepage channel and then back to the surface. All borings shall not damage the geotextile fabric on the side slopes of the seepage collector channel when in proximity to the channel. Figure 4 shows a typical cross-section of what is expected when boring under roads and the seepage collector channel. Crossing Crossing type Approximate distance across (feet) Minimum Depth of boring under crossing (feet) Crossing 1 Seepage Channel 400 10 Crossing 2 Paved bike path/ gravel road 60 4 Crossing 3 Paved road 180 4 Crossing 4 Gravel road 180 4 The Contractor shall limit rutting or damage to the existing ground surface to the extent possible and is liable for any needed repair. Any cuttings produced from drilling shall be spread out so as to not create any "ant hills". The contractor is responsible for doing utility locates at boring locations and is expected to hire a private locator as well as confer with Chena project office personnel (Bill Davis) to ensure that no utilities are damaged during operations. 3.0 SAFETY The Contractor is responsible for the safety of his and the subcontractor's personnel, equipment, materials, and the public at all times. The contractor shall perform all work in accordance with the latest version the U.S. Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1. Upon selection, the Contractor will be required to submit a site specific safety and accident prevention plan in accordance with EM 385-1-1. A description of all methods and procedures that will be utilized to ensure safe operations will be included in the safety plan. No work shall be performed until these plans have been approved by USACE-AD. SCHEDULE IS CHANGED FROM: 4.0 SCHEDULE This work is anticipated to commence 15 June 2012. The notice to proceed will be coordinated with the USACE-AD. The Contractor shall be able to start fieldwork not more than five (5) days after the notice to proceed. Final schedule and site access will be coordinated with the government after notice to proceed and before the commencement of drilling operations. The contractor shall complete work including final cleanup of premises within 45 days of notice to proceed. SCHEDULE IS CHANGED TO: 4.0 SCHEDULE This work is anticipated to commence 20 June 2012. The notice to proceed will be coordinated with the USACE-AD. The Contractor shall be able to start fieldwork not more than five (5) days after the notice to proceed. Final schedule and site access will be coordinated with the government after notice to proceed and before the commencement of drilling operations. The contractor shall complete work including final cleanup of premises within 45 days of notice to proceed. 5.0 MEASUREMENT AND PAYMENT The measurement and payment for this project will be broken down into the following items: (1) Mobilization/Demobilization: a. Measurement: Mobilization/demobilization for the drill rig, personnel, and all materials and equipment shall be measured as a job item. b. Payment: Payment will be made at the contract job price under Bid Item 1 "Mobilization/Demobilization". This price and payment will represent full compensation for mobilization/demobilization, including mobilization/demobilization for all options/crossings. (2) Crossing 1: a. Measurement: Measurement for drilling shall be made for the base bid item "Crossing 1" that includes one eight-inch directional boring of HDPE that passes under the Seepage Collector Channel a minimum of ten (10) feet below the lowest point in the channel at the point of crossing. Measurement shall be for the competed boring with plastic sealed ends on either side so that water or other debris cannot enter the pipe. b. Payment: Payment will be made at the contract price for the base bid item "Crossing 1" (Bid Item 2) for actual completion of boring. This price and payment will constitute full compensation for the drilling. The "Crossing 1" prices will include all equipment costs, material, per diem and wages for the drill personnel, overhead, and all other costs associated with the drilling operation. (3) Crossing 2: a. Measurement: Measurement for drilling shall be made for the base bid item "Crossing 2" that includes one eight-inch directional boring of HDPE that passes under the paved bike path a minimum of four (4) feet below the centerline of the path. Measurement shall be for the competed boring with plastic sealed ends on either side so that water or other debris cannot enter the pipe. b. Payment: Payment will be made at the contract price for the base bid item "Crossing 2" (Bid Option 1) for actual completion of boring. This price and payment will constitute full compensation for the drilling. The "Crossing 2" prices will include all equipment costs, material, per diem and wages for the drill personnel, overhead, and all other costs associated with the drilling operation. (4) Crossing 3: a. Measurement: Measurement for drilling shall be made for the base bid item "Crossing 3" that includes one eight-inch directional boring of HDPE that passes under the paved road a minimum of four (4) feet below the centerline of the pavement. Measurement shall be for the competed boring with plastic sealed ends on either side so that water or other debris cannot enter the pipe. b. Payment: Payment will be made at the contract price for the base bid item "Crossing 3" (Bid Option 2) for actual completion of boring. This price and payment will constitute full compensation for the drilling. The "Crossing 3" prices will include all equipment costs, material, per diem and wages for the drill personnel, overhead, and all other costs associated with the drilling operation. (5) Crossing 4: a. Measurement: Measurement for drilling shall be made for the base bid item "Crossing 4" that includes one eight-inch directional boring of HDPE that passes under the gravel access road a minimum of four (4) feet below the centerline of the road. Measurement shall be for the competed boring with plastic sealed ends on either side so that water or other debris cannot enter the pipe. b. Payment: Payment will be made at the contract price for the base bid item "Crossing 4" (Bid Option 3) for actual completion of boring. This price and payment will constitute full compensation for the drilling. The "Crossing 4" prices will include all equipment costs, material, per diem and wages for the drill personnel, overhead, and all other costs associated with the drilling operation. 6.0 CONTRACT AWARD Award shall be based upon the lowest total bid. See Provision 52.212-2 Evaluation--Commercial Items (JAN 1999). This contract shall be awarded on a unit price basis. Quantities and work shall be paid on units completed. 7.0 TECHNICAL POINT OF CONTACT All technical questions regarding this scope of work shall be addressed to Coleman Chalup at USACE-AD. He can be reached by telephone at 907-753-2686 or by email at coleman.j.chalup@usace.army.mil.

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 237990
New
Federal
Lowell Creek Tunnel Repairs, Seward, Alaska
Solicitation # W911KB27BA005
The Department of Defense, through the Alaska District of the U.S. Army Corps of Engineers, is issuing a presolicitation notice for the Lowell Creek Tunnel Repairs in Seward, Alaska. This project involves repairing worn areas and installing new center rails within a 2,100-foot, horseshoe-shaped tunnel that diverts Lowell Creek through Bear Mountain into Resurrection Bay. The scope of work includes structural repairs to the intake transmission tunnel and outlet, the construction of a concrete channel, and the use of abrasion-resistant concrete featuring silica fume and fly ash or slag for alkali-silica reactivity mitigation. The contractor will be responsible for providing all labor, equipment, materials, and supervision, including managing tunnel dewatering and winter construction challenges and implementing a temporary flood management plan. The project will be awarded as a firm-fixed-price contract under NAICS code 237990, with an estimated construction magnitude between 10 million and 25 million dollars. The solicitation is expected to be available via SAM.gov on or after November 3, 2026, with an anticipated award date in December 2026. The period of performance is estimated at 1,000 calendar days. Bids will be accepted electronically through the PIEE Solicitation Module under solicitation number W911KB27BA005. All offerors must be registered in SAM.gov, and the contract will adhere to Construction Wage Rates.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Federal
Market Intelligence for EIE483 and EIE484
Solicitation # W911KB27RWP11
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence via a Request for Information for two Military Construction projects at Eielson Air Force Base, Alaska. The first project, EIE483, involves the design and construction of a Joint Mobility Center Expansion, including a Deployment Processing Facility, hazardous materials storage, and exterior covered storage canopies, with an estimated magnitude of 249.2 million dollars. The second project, EIE484, consists of constructing a 225-bed permanent party dormitory with an estimated magnitude of 305 million dollars. Both projects are planned for a period of performance from FY27 through FY31, with design starting in FY27 and construction beginning in FY28 for the dormitory and FY29 for the mobility center. The government intends to utilize Other Transaction Agreements under 10 U.S.C. 2808a, with a planned two-phase approach consisting of design and pre-construction services followed by final design and construction. Potential delivery methods under consideration include Progressive Design-Build or Construction Manager at Risk. This RFI is strictly voluntary and is being used to assess industry capabilities, budget realism, and preferred acquisition strategies. Interested parties must submit the Market Intelligence Questionnaire by October 29, 2026, at 14:00 Alaska Time. The projects fall under NAICS code 236220 for Commercial and Institutional Building Construction, with a small business size standard of 45 million dollars.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS