Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Director’s Order _1T990_ SBD-40 San Bernardino- Truck Fire

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 8 is preparing to address significant roadway damage on westbound Interstate 40 between Hector Road and the Desert Oasis Rest Area in Newberry Springs, California, resulting from a major truck fire involving five vehicles, three of which were fully engulfed. The incident caused extensive harm to the pavement and dike structure, blocking all westbound lanes and necessitating urgent repair work within Caltrans’ right of way. The project is authorized under a Director’s Order, indicating a streamlined process for emergency or high-priority repairs, and is assigned the internal reference number 1T990 SBD-40. The work is forecasted to proceed under the agency’s administrative control without a formal solicitation, as the nature of the damage calls for immediate response. All activities will be conducted in compliance with environmental and safety protocols under the oversight of Caltrans personnel in San Bernardino/Riverside. Gita Tokhmafshan, Senior Environmental Planner, is the primary point of contact for inquiries, and the project is officially recorded in the Caltrans CEQA Net system with the identifier 2026060193, with a posted date of June 4, 2026, suggesting the project is scheduled for implementation in the near future.

General Info

Emergency repair of I-40 westbound pavement and dike after truck fire, no solicitation, Caltrans District 8.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Interstate 40 (I-40) between Hector Road and the Desert Oasis Rest Area in Newberry Springs., CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Director's Order SBD-40 San Bernardino Truck Fire

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Gita TokhmafshanSenior Environmental Planner

Full Description

Show more
The proposed Director’s Order (DO) project consists of repairing roadway damage caused by the incident on westbound Interstate 40 (I-40) between Hector Road and the Desert Oasis Rest Area in Newberry Springs. The incident involved five vehicles, including three semi-trucks that became fully engulfed in flames. The fire blocked all westbound lanes and caused significant damage to the roadway, including the pavement and the dike. All work will occur in Caltrans’ right of way (ROW).

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 21 hours ago

DEADLINE

in about 1 month
View Details