Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Agriculture was posted on February 25, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Disaster Recovery Limepoint Fire Trails Stabilization Payette National Forest

Closed
12363N26Q0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 11 hours ago

DEADLINE

in about 19 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 16 hours ago

DEADLINE

N/A

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Council, ID, 83612, USA

Set-Aside

SBA

Documents

7

Amendment 0001 to Solicitation 12363N26Q0005 Limepoint Fire Trails Stabilization

PDF, High priority: read this first4 pages · amendment
High

Limepoint Fire Trail Stabilization Plans - Payette National Forest

PDF, High priority: read this first7 pages · specifications
High

Limepoint Fire Trail Stabilization Specifications 10/30/2014

DOC, High priority: read this first35 pages · specifications
High

Limepoint Fire Trail Stabilization Statement of Work

DOCX, High priority: read this first2 pages · sow
High

RFQ 12363N26Q0005 Payette Limepoint Fire Trails Stabilization

DOCX, High priority: read this first12 pages · rfq
High

Wage Determinations ID0036 and 95-0228 for Idaho Heavy Construction

PDF, High priority: read this first14 pages · wage-determination
High

ATT 4 Select Pictures

PDF, Low priority3 pages · other
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Feb 26, 2026 to Mar 7, 2026. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Stewardship Contracting Branch Usda-Fs
Contacts2 people available
OfficeWashington, DC, 202501138, USA
Office AddressWashington, DC, 202501138, USA
Contacts
Stefanie Thomas-Fox

Full Description

Show more

Date for quotes extended to 06MAR2026 and Completion Date extended to 15NOV2027.  See Q&A attached.



This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12.  This announcement constitutes the only solicitation; offers are being requested, and a separate written solicitation will not be issued. 



Solicitation number 12363N26Q0005 is issued as a Request for Quotation (RFQ) for Trails Stabilization on the Payette National Forest.



This acquisition  is set-aside for small business concerns.  This solicitation incorporates provisions and clauses by reference.  The full text of provisions and clauses may be accessed electronically at www.acquisition.gov.



The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Construction  The small business size standard is $45 Million  This acquisition is a Total Small Business Set-Aside.  All responsible sources may submit a quotation which will be considered by the agency. 




Statement of Requirement



Background The 2024 Limepoint Fire affected nearly the entirety of the 12.2 mile long trail system accessed from the Kinney Creek, Allsion Creek, and Eckels Creek Trailheads along Hells Canyon Reservoir on Payette National Forest.



Description of Project Work must be performed to restore sustainable trail tread to portions of the trail where this has been affected by loss of anchoring vegetation and post fire run-off, as well as to make the trail system more resistant to future runoff due to long-term fire effects. As such, the overall goal is to restore a full trail bench (see Plans) to the entirety of the trail system or, as much as possible with the funding available, as well as adding drainage features where necessary to withstand erosion. Install signs at junctions of 222 and 221, 514 and 223, 223 and 225; Install Kinney Creek Trailhead sign the beginning of the 221 and Hells Canyon Road junction.



Location All work will be performed on the sections of National Forest System (NFS) Trails no. 221 (Kinney Cr.), 222 (Kinney Cr.-Eckels Cr.), 223 (Eckels Cr.), and 514 (Allison Cr.) shown on the attached map.  These trailheads are in the general vicinity of the Big Bar Recreation Area along Hells Canyon Road. All are located on the Council Ranger District of Payette National Forest. This is located approximately 54 road miles north of Cambridge, ID, accessed via State Hwy 71 to Hells Canyon Road.                                                                                                                                                                                                                                                            


Period of Performance The period of performance for the base and optional items begins on the effective date of the Notice to Proceed (NTP) and runs through November 15, 2026. The end date may be extended depending on the availability of funds.

More opportunities from Department Of Agriculture → Stewardship Contracting Branch Usda-Fs

Same awarding agency

NAICS: 113310
New
Federal
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon
Solicitation # 12363N26Q4181
Solicitation 12363N26Q4181 is a request for quotations for the Corral G-Z Integrated Resource Stewardship Contract (IRSC) within the Bly Ranger District of the Fremont-Winema National Forest in Oregon. This small business set-aside project follows the G to Z model to restore forest health and mitigate catastrophic wildfire risks by reverting stand density and species composition to historical ranges of variability. The scope of work includes professional forestry services such as harvest layout, timber marking, and cruising, as well as the commercial harvest and removal of approximately 191,379 tons of timber across 7,000 acres and fuels reduction on 17,000 acres. Specific restoration activities include whole tree yarding, removing encroaching conifers in meadows, and performing release cuts in whitebark pine stands. The government will award a firm-fixed price contract based on a best-value tradeoff, evaluating technical approach, relevant past performance from the last three years, and benefits to the local community within 60 miles of Bly, Oregon. The period of performance extends from the date of award through October 31, 2031. Key requirements include compliance with Federal Geographic Data Committee standards for geospatial deliverables, adherence to a strict fire plan, and following specific road maintenance and traffic control specifications. Performance is subject to a quality-based payment scale, where work quality below 85 percent is considered unacceptable and ineligible for payment. Quotes must be submitted as separate technical and price proposals by November 16, 2026.
Logging

POSTED

6 days ago

DEADLINE

in 27 days
View Details
NAICS: 113310
Federal
Bitterroot Front 10 Year G-Z IRSC
Solicitation # 12363N26R4014
Solicitation 12363N26R4014 is a Request for Proposal for the Bitterroot Front G-Z Long Term Integrated Resource Service Contract, a total small business set-aside under NAICS 113310. The project covers approximately 145,000 acres across the Stevensville and Darby Ranger Districts of the Bitterroot National Forest in Montana. The primary objectives are to reduce wildfire risk to nearby communities and restore forest health through thinning, harvesting, mechanical fuel reduction, and prescribed burning. Secondary goals include providing a consistent timber supply for local industries. The contract encompasses a wide scope of work, including unit layout, timber cruising, road reconstruction, and timber removal, with a period of performance spanning ten years from June 15, 2027, to October 15, 2037. The government will award the contract based on a best-value tradeoff decision, where non-price factors are approximately equal in importance to price. Technical evaluation focuses on the work activity plan, equipment suitability, key personnel experience, and quality control, alongside the benefit to the local community and relevant past performance. Mandatory road reconstruction work is estimated between 350,000 and 550,000 dollars. Contractors must comply with Davis-Bacon and Service Contract Act wage determinations and adhere to strict environmental and safety standards, including erosion control and OSHA requirements. Proposals must be submitted as separate technical and price volumes via email to the designated points of contact by October 22, 2026.
Logging

POSTED

7 days ago

DEADLINE

in 1 day
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS