Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Mexico was posted on August 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades

Closed
State & Local
Submission Closed
Solicitation #
FY27-Const. ITB-008

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
FY27 Euclid Creek Fishway Construction
Solicitation # W912P427BA001
The U.S. Army Corps of Engineers, Buffalo District, is soliciting bids for the FY27 Euclid Creek Fishway Construction project located at the Euclid Creek Spillway in Cleveland, Ohio. The project scope includes the construction of a fishway within the existing spillway, necessary spillway modifications, and the construction of an access road, retaining wall, railing, and road gate. Additional requirements involve tieback design and installation for the retaining wall, site restoration, concrete removal, excavation, and dewatering. While tree felling is no longer a project requirement, the contractor remains responsible for removing felled trees from the site. The estimated magnitude of construction is between $5,000,000 and $10,000,000, and the procurement is a Small Business Set Aside - Total. The government intends to award a firm-fixed-price contract to the lowest priced responsive and responsible bidder. Bids must be submitted electronically via the PIEE suite by December 17, 2026, at 10:00 AM EST. The period of performance is expected to begin with a Notice to Proceed around January 26, 2027, with a total completion timeline of 600 calendar days. Notably, in-water work is generally prohibited from September 15 through June 30 annually, though specific waivers for 2026 and 2027 allow work during May-June and September-December. The project is subject to the Davis-Bacon Act and requires strict adherence to EM 385-1-1 safety standards and NIST SP 800-171 cybersecurity requirements.
W072 Endist Buffalo

POSTED

about 22 hours ago

DEADLINE

in 19 days

AI Contract Overview

Show more

The City of Santa Fe Wastewater Division is soliciting bids under solicitation FY27-Const. ITB-008 for the upgrade of Dissolved Air Floatation Thickener Units 1 and 2 at the Paseo Real Water Reclamation Facility. The scope of work involves modifying the air water saturation system, installing new air-entraining pumps, constructing a structural stand for the break tank, and performing SCADA and control integration for all new equipment. The project also includes necessary demolition, abandonment, and replacement activities across multiple disciplines as detailed in the project manual and technical plan sets. Bids must be submitted electronically via OpenGov by September 29, 2026. The contract will be awarded to the responsive and responsible bidder providing the lowest base bid. Key requirements for bidders include providing a valid New Mexico Resident Certificate, a bid security of 5 percent of the total item prices, and maintaining a valid license from the Construction Industries Division. For contracts exceeding 25,000 dollars, the successful bidder must provide 100 percent performance and labor material payment bonds. The project is subject to strict labor and safety standards, including compliance with the New Mexico Public Works Minimum Wage Act and the use of Wage Scale H for heavy engineering trades. Contractors must ensure all subcontractors are registered with the Public Works and Apprenticeship Application website and submit required wage documentation. On-site superintendents must hold at least an OSHA 10 certification. Final inspection and acceptance will occur at the destination, with the City of Santa Fe determining if the work meets the specified quality and workmanship standards.

General Info

Upgrades to PRWRF air water saturation systems, including pumps, structural work and SCADA.

Documents

8
PDF, High priority: read this first24 pages · itb
High
PDF, High priority: read this first476 pages · sow
High
PDF, High priority: read this first2 pages · specifications
High
PDF, High priority: read this first24 pages · itb
High
DOCX, High priority: read this first3 pages · wage-determination
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this first5 pages · wage-determination
High
DOCX, Low priority1 page · industry-day
Low

Read all 8 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Solicitation requirements

72 mandatory

72 requirements in 9 areas

  • Submission19 · 19 must
    001

    Bid Validity Period

    Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades.pdf
  • Compliance17 · 17 must
    021

    Agreement to Contract

    Dissolved Air Floatation Thickener Unit 1 AND 2 Upgrades.pdf
  • Quality Assurance10 · 10 must
    054

    Operational Performance Verification

  • 69 more requirements, each with its source quote

Read every requirement with its source and proposal context.

Read all 72 requirements

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
  • Imperial Irrigation District – East Highline ReservoirOpen now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Mexico → Wastewater Division
Contacts2 people available
OfficeSanta Fe, NM, 87501, USA

Interested Companies (20)

AnchorBuiltAlbuquerque, NM
AUIAlbuquerque, NM
Ballew ConcreteSanta Fe, NM

See All 20 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
The Work to be performed as per the DAF Unit 1 & 2 Upgrade Project Manual includes, but is not limited to, constructing the Work described below and all appurtenances related to the Work. The Work shall be as follows: 1. Modification of the air water saturation system for the dissolved air floatation process at the PRWRF. Scope includes new air-entraining pumps, necessary electrical connections, structural stand for break tank which supplies non-potable water to the air entraining pumps. 2. SCADA and control integration associated with all newly installed equipment 3. Associated demolition, abandonment, and replacement of all required disciplines/divisions.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS