Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

District 12 Pavement Management Program Implementation Project, Specification No. 3065, and Plan Nos. 1-3119, 2-419, 49-269.

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The District 12 Pavement Management Program Implementation Project, identified by Specification No. 3065 and Plan Nos. 1-3119, 2-419, and 49-269, involves street resurfacing and pavement rehabilitation within the northern area of the City of Glendale, California. The project area is bounded by Sky Ridge Road to the north, Emanuel Drive to the south, La Crescenta Avenue to the east, and Lowell Avenue to the west. The primary objective is to rehabilitate existing pavement that has deteriorated beyond routine maintenance to enhance ride quality, restore structural integrity, and extend the service life of the roadway. The technical scope of work includes milling and removing the upper 2 inches of existing asphalt concrete pavement. This will be followed by the placement of either a 2-inch Asphalt Rubber Hot Mix wearing surface or a 1.5-inch Asphalt Rubber Hot Mix wearing surface over a 0.5-inch or variable thickness asphalt concrete leveling course. The project is classified under NAICS code 237310 and is exempt from the California Environmental Quality Act under Class 1 Existing Facilities, as it involves minor repairs to existing roadways with negligible expansion. Dennis Joe, Principal Planner for the City of Glendale, serves as the primary point of contact.

General Info

Pavement rehabilitation in Glendale with asphalt milling and ARHM resurfacing to restore road integrity and extend lifespan.

Agency

California → City of Glendale

Place of Performance

Bounded by Emanual Dr (south), La Crescenta Ave (east), Lowell Ave (west) & Sky Ridge Rd (north), Glendale, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Glendale
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Glendale
Office AddressN/A
Contacts
Dennis JoePrincipal Planner

Full Description

Show more
The project consists of improvement along multiple right-of-way segments within the northern area of the City of Glendale bounded by Emanual Drive (south), La Crescenta Avenue (east), Lowell Avenue (west) and Sky Ridge Road (north). The scope of work improvements to these right-of-way corridors include include street resurfacing to rehabilitate existing pavement that has deteriorated beyond the scope of routine maintenance. The work generally consists of milling and removing the upper 2 inches of existing asphalt concrete (AC) pavement, followed by either the placement of a 1.5-inch Asphalt Rubber Hot Mix (ARHM) wearing surface over a 0.5-inch (or variable thickness) AC leveling course, or the placement of a 2-inch ARHM wearing surface. These improvements will enhance ride quality, restore the structural integrity of the pavement, and extend the service life of the roadway.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; extensive pipeline and utility work involving tunneling, boring, jacking, and the installation of steel casing and cathodic protection; and surface improvements including asphalt paving, lighting, and landscaping. Additionally, the project requires environmental and support services such as storm water pollution prevention, quality control, and waste management, as well as the supply of ready mix, precast concrete, and manhole materials. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. All quotes must be submitted via the Building Connected system by the deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
STP-011-2(046) VOLCANO RD REHAB, OSHIRO RD TO ALII KOA ST
Solicitation # B27000729
The Hawaii Department of Transportation is soliciting bids for the Volcano Road Rehabilitation project, spanning from Oshiro Road to Alii Koa Street in Lanai, Hawaii. The scope of work focuses on comprehensive roadway reconstruction and maintenance, including cold planing, resurfacing, the reconstruction of weakened pavement areas, pavement marking and striping, guardrail improvements, and the installation of milled rumble strips. Key deliverables include the leveling of roadway dips using A.C. Mix No. V and the deployment of Type II OM warning signs. The project mandates strict adherence to environmental mitigation, including NPDES Permit requirements for water pollution and erosion control, and requires that all lanes remain open during morning peak hours from 6:00 a.m. to 8:00 a.m. Contractual compliance requires the submission of performance and labor and material payment bonds, as well as certifications for Workers' Compensation and Temporary Disability Insurance. The project is subject to the Davis-Bacon and Related Act and the Contract Work Hours and Safety Standards Act. Technical acceptance is based on the Mean Roughness Index for pavement smoothness, with specific HMA tolerances for asphalt content and mixture temperature. Specialty items for the project include hot mix asphalt pavement, guardrails, and work zone traffic control. Bidders must submit their proposals via the HIePRO portal, with a virtual pre-bid conference scheduled for November 16, 2026.
Department of Transportation

POSTED

about 17 hours ago

DEADLINE

in 27 days
View Details
NAICS: 237310
New
SLED
Downtown Traffic Management Project Components 1 and 2 - Intelligent Transportation System (ITS) and Wilson Street Improvements
Solicitation # 2095-SCP
The City of Rock Hill is soliciting competitive bids for the Downtown Traffic Management Project, which is divided into two primary scopes: Component 1, focusing on the Intelligent Transportation System (ITS), and Component 2, involving Wilson Street Improvements. The ITS component requires the installation of Dynamic Message Signs, Blank-Out Signs, CCTV, and fiber optic infrastructure, including a specific 90-day window for conduit installation following the Notice to Proceed. The Wilson Street Improvements involve widening the roadway from two to three lanes with the addition of bike lanes, milling, resurfacing, and ADA ramp installations. The project has a substantial completion timeline of 730 calendar days. Bidders must be SCDOT prequalified and submit their proposals electronically via the OpenGov eProcurement Portal by November 18, 2026, at 2:00 p.m. Required submission materials include a 5% bid guaranty, proof of prequalification, AIA document A305, and signed certifications regarding lobbying and debarment. The contract will be awarded to the responsible and responsive bidder offering the lowest Total Base Bid. Awardees must adhere to the Davis-Bacon Act, the Build America, Buy America Act, and NIST cybersecurity frameworks for any access to SCDOT electronic data. Payment terms include a 30-day processing window with a 10% retainage withheld until project completion.
Project Management

POSTED

about 18 hours ago

DEADLINE

in 11 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS