This Solicitation opportunity from District of Columbia was posted on March 21, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

District of Columbia Power Line Undergrounding (DC Plug) Feeder 15021

Closed
DCKA-2025-B-0024State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This contract involves comprehensive civil construction work for the PEPCO feeder 15021 as part of the DC Power Line Undergrounding (DC PLUG) Program within Ward 4 of the District of Columbia. The scope includes removing existing roadway pavement, curb, gutter, and sidewalks to facilitate underground utility installation, and subsequently restoring these elements to their original or improved condition, including pavement milling and overlay, curb and sidewalk replacement, and high-visibility crosswalk upgrades. The work also encompasses installing PEPCO-supplied materials such as conduits, precast manholes, and transformer enclosures, along with ductbank encasement using pea gravel concrete and thermal fill. Excavation, backfilling, and utility cut restoration are integral parts of the project, with an emphasis on maintaining traffic flow, access to local establishments, and utility service continuity throughout construction. Additional responsibilities include implementing erosion and sediment controls, dust suppression, and rodent control measures, as well as mobilization, field layout, and project documentation. The contractor must ensure the protection of existing utility infrastructure—including water, sewer, gas, electric, and communication lines—without separate compensation, integrating these costs into the overall project budget. The work aims to deliver a fully completed, functional underground utility system while adhering to DDOT standards for safety, traffic management, and environmental protection. The project is valued between 5 million and 15 million dollars, with a response deadline of April 28, 2025, and is managed by the District of Columbia Department of Transportation.

General Info

Agency

District of Columbia → D.C. Department of Transportation

Place of Performance

DC, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDistrict of Columbia → D.C. Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
District of Columbia → D.C. Department of Transportation
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Work under this Contract consists of the civil construction for PEPCO feeder 15021 of the DC Power Line Undergrounding (DC PLUG) Program, located in Ward 4 and bound by Madison St NW, Colorado Ave NW, 13th St NW, and Blagden Ave NW as shown on the contract plans, indicated in the specifications / Special Provisions (J.8), as directed by the Contract Administrator. The specifications in this document and related Contract Drawings cover the work which includes, but is not limited to the following: The removal and disposal of existing roadway pavement, curb, gutter, and sidewalks to the extents shown on plans or as necessary for access to trench excavation. The installation of PEPCO supplied materials such as PVC and fiberglass conduits, precast manholes, precast tapholes, precast transformer enclosures, and other related items and components. The furnishing and installation of pea gravel concrete for ductbank encasement. The furnishing and installation of thermal fill for ductbank encasement at transmission feeder crossings. The furnishing and installation of concrete and reinforcing steel for cast-in-place manhole construction. Excavation and backfilling of all utility cuts. Temporary restoration of all utility cuts. Permanent restoration of all utility cuts. Restoration of all pavement markings disturbed by the utility cut and pavement restoration work. Upgrade crosswalks to the high visibility type at all intersections within the project limits. Pavement profiling (milling) and overlay (approximately 2 inches) of utility cuts and per plan in accordance with DDOT standards. Installation of topsoil, seed, and mulch on all disturbed earth and grass areas. Installation of replacement curb (in-kind), curb and gutter (in-kind), and sidewalk (in-kind) sections. The installation and use of erosion and sediment control measures meeting DDOT/DOEE standards and per plan. Dust control during pavement saw cutting and excavation operations. Mobilization and demobilization, completion of field layout, provision and maintenance of engineer's field facilities, progress photographs, and rodent control. Maintain vehicular, bicycle and pedestrian traffic per DDOT Standard Specifications Section 612 and Attachment J.14 or as directed by the Contract Administrator. Maintain access to residential, institutional and commercial establishments using appropriate means as approved by the Contract Administrator. Maintain service of all existing utilities during construction. Work includes the disposal of all unsalvageable materials and all labor, materials, tools, equipment and incidentals necessary to obtain a complete and finished product. The Contractor shall be fully responsible for protection against damages for the duration of the Contract of all the utility structures within the Contract limits and adjacent thereto. The utilities include but are not limited to public and/or private water, sewer, electricity, gas and communications lines. No separate measurement or payment will be made. Cost of this protective work shall be reflected and distributed among the Contract pay items. Work also includes all incidentals needed to complete the project as shown on the Contract Drawings and within the Special Provisions

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS