DIVERTING DAM ANNUAL MAINTENANCE

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Helix Water District is proposing a maintenance project for the Diverting Dam in San Diego County, California, to remove trash, debris, silt, and vegetation. This work is essential to facilitate inspections and ensure the continued safe operation of the dam and its associated metering station. The Diverting Dam serves as a critical point for accounting for the District's storage rights in the El Capitan Reservoir, allowing an average of 6,565 acre-feet of water per year to be transferred to Lake Jennings or the R. M. Levy Water Treatment Plant. This process supports the local water supply and reduces the region's reliance on imported water. The project is scheduled to begin after September 15 and must be completed by February 1, 2027. All activities will be conducted in compliance with a Streambed Alteration Agreement with the California Department of Fish and Wildlife, which prohibits vegetation or sediment removal between February 2 and September 15 to protect nesting birds. The project is categorized as exempt under CEQA Class 1 and Class 4. Beyond operational efficiency and downstream safety, the project aims to reestablish a small pool of water behind the dam for wildlife use.

General Info

Helix Water District maintenance of San Diego Diverting Dam from September to February 2027.

Agency

California → Helix Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Helix Water District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Helix Water District
Office AddressN/A
Contacts
Debbie LundySenior Right of Way Agent/Environmental Analyst
Manual BaronProject Manager

Full Description

Show more
Background: Upon completion (in 1887) the Cuyamaca and Diverting dams became integral pieces of infrastructure for the San Diego Flume Company (Helix Water District isthe successor). Water was stored behind Cuyamaca dam during the rainy season and then transferred via Boulder Creek and the San Diego River to the Diverting dam. Once at the Diverting dam, water was released into the flume, and eventually stored in La Mesa for distribution to its customers. By 1937, the flume was abandoned, due to the construction of EI Capitan Dam and Reservoir. The District retains the right to store up to 10,000 acre-feet of water annually in EI Capitan Reservoir. The Diverting Dam continues to be used as a metering station to account for the District's storage rights in EI Capitan Reservoir, and will continue to be used in this manner for the foreseeable future. An average of 6,565 acre feet per year flows through this metering station and is ultimately transferred from EI Capitan Reservoir to either Lake Jennings, or Helix Water District's R. M. Levy Water Treatment Plant thusly serving as local water supply and helping to reduce the amount of imported wafer required in the County. Project: The District is proposing a maintenance project to remove trash, debris, silt and vegetation that facilitates the inspection and continued safe operation of the dam and metering station. Since 2003 the district has maintained a Streambed Alteration Agreement with the California Department of Fish and Wildlife. The current agreement is EPIMS-SDO-57397-R5, issued on January 7, 2026. All project work will be in compliance with the SAA; per SSA Section 2.1 (Work Period), no vegetation or sediment removal work will be performed between February 2 and September 15, to avoid potential impacts to nesting birds. The benefits associated with the proposed project include the ability to transfer local water supply in an efficient manner, reduce the dependence on imported water, and the continued integrity of the dam. Another benefit will be the reestablishment of a small pool of water behind the dam that in the past has been used by wildlife. This will benefit both the customers of Helix Water District as well as the continued safety of downstream properties. Project is slated to begin after September 15th in accordance with the SAA permit and be completed by February 1, 2027.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
9585 - Castle Creek Channel Improvements at Warner Park
Solicitation # 9585
The City of Madison is soliciting bids for contract 9585, project 13863, to perform the Castle Creek Channel Improvements at Warner Park in Dane County, Wisconsin. The scope of work involves reconstructing an existing concrete lined channel by lowering and widening the channel from Sherman Avenue to Warner Lagoon, implementing storm sewer improvements, and performing native plant restoration. The project includes the potential removal, salvage, and reinstallation of existing bridges following final grading and riprap placement. Contractors must adhere to various environmental permits, including authorizations from the US Army Corps of Engineers, the WDNR for hydrologic restoration and storm water construction, and the City of Madison for erosion control. Bidders must be prequalified, specifically in category 246 for Ecological Restoration, or utilize a prequalified subcontractor for related work items. The contract is designated as a Best Value Contract for multi-trade bids equal to or greater than 386,500 dollars. A 5 percent bid bond is required, and the project carries a Small Business Enterprise goal of 12 percent. Awardees must provide payment and performance bonds and comply with the City of Madison Affirmative Action Ordinance. Performance is subject to strict quality standards, including a one-year guarantee on seeded areas and compliance with Wind Sock Standards for erosion control. Failure to comply with specific contract articles may result in liquidated damages of 0.5 percent of the award price per week, capped at 5 percent or 10,000 dollars. Grant funds for the project are administered on a reimbursement basis.
City of Madison

POSTED

2 days ago

DEADLINE

in 11 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS