This Solicitation opportunity from Illinois was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DNR Blackhawk State Historic Site- Trail Rehab
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the Illinois Department of Natural Resources seeking a qualified vendor to undertake trail rehabilitation work at Blackhawk State Historic Site, including the replacement of an overlook structure, a trail bridge, and general trail restoration to address erosion and site degradation. The scope encompasses removal of existing timber structures, construction of new pedestrian facilities such as a boardwalk and viewing platform, installation of concrete foundations, and erosion control measures, all in accordance with Illinois Department of Natural Resources standards and specifications. The project emphasizes environmental compliance, utility verification, debris management, and site restoration, with detailed plans and special provisions governing construction procedures, safety, and quality standards. The contract size ranges between 500,000 and 1.5 million dollars, with a focus on timely completion, adherence to environmental permits, and record documentation. Bidders must submit comprehensive certifications and disclosures, including vendor registration, business enterprise utilization plans, and certifications related to lobbying, drug-free workplaces, and ownership disclosures, primarily through the Illinois Procurement Gateway or alternative forms if not registered. The procurement process is structured around electronic bid submissions via the IPG portal, with detailed instructions for proposal formatting, required documentation, and compliance with state and federal regulations. The contract stipulates inspection and acceptance procedures conducted on-site by IDNR representatives, emphasizing adherence to specifications, proper utility protection, erosion control, and site restoration. Overall, the project aims to enhance trail safety, accessibility, and environmental sustainability at the historic site, with contractual obligations clearly defined through detailed plans, special provisions, and certification requirements.
General Info
Place of Performance
Set-Aside
Documents
10AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 3 days
- North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1Open now, due in 18 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
