Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of the United Kingdom was posted on October 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DNWP0027- Lot 1B / WAGR B55 Demolition - Sellafield - A2R JV

Closed
C4N121802017International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation number SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. The scope of work involves the rehabilitation of covered and open concrete structures, relining and replacement of steel and ductile iron pipes and supports, and the installation of valves and piping appurtenances. Key technical requirements include the installation and operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, and the modification of sluice and slide gates. Additionally, the project encompasses the installation of platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying of reactor areas. The estimated contract value for this project ranges between 18.5 million and 19.5 million dollars. This solicitation is designated as a Small Business set-aside, including SBA certified Veteran Owned Small Business, Service-Disabled Veteran Owned Small Business, Women-Owned Small Business, and HUBZone Small Business. The bid opening is scheduled for December 2, 2026. Ranger Pipelines Incorporated is seeking quotes from certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and welding. All subcontractors must comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 4 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The B55 and B55.2 demolition project at Sellafield, managed by the Altrad AtkinsRealis Joint Venture for the Government of the United Kingdom, involves the controlled dismantling of the B55 Office Complex and B55.2 Turbine Hall within the WAGR complex. The scope of work encompasses soft stripping, asbestos remediation, and high-reach mechanical demolition of structural frames, cladding, and reinforced-concrete floors down to the ground-floor slab. Additional requirements include the segregation and processing of demolition arisings, backfilling of voids, and final site clearance to reduce redundant infrastructure and accelerate hazard reduction. A critical operational constraint is the protection of Substation 65, which is located within the structures and must remain fully functional and shielded from dust, water, and demolition impacts. The project also requires the protection of retained basements and the management of risks associated with aging structures, buried services, and incomplete historical data through detailed surveys and risk-informed planning. This demolition-led approach is designed to minimize workforce exposure and support the broader decommissioning goals of the WAGR programme.

General Info

Altrad AtkinsRealis Joint Venture will demolish B55 and B55.2 complexes at Sellafield site.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 8 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 8 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of the United Kingdom → Altrad AtkinsRealis Joint Venture (A2R JV)
Contacts1 person available
OfficeMoor Row, CA24 3HY, GBR

Full Description

Show more
The B55 and B55.2 demolition project at Sellafield involves the controlled demolition and dismantling of the B55 Office Complex and B55.2 Turbine Hall, located within the WAGR complex, down to existing ground-floor slab level. The scope includes soft stripping, asbestos remediation, high-reach mechanical demolition of the structural frame, cladding and reinforced-concrete floors, together with segregation and processing of demolition arisings, backfilling of voids and final site clearance. A key constraint is Substation 65, which is located within the B55/B55.2 structure and must remain operational and be protected from demolition impacts, dust and water ingress throughout the works. Retained basements and associated structures also require protection, while uncertainties associated with ageing structures, buried services, below-ground voids and incomplete historical information must be managed through robust surveys, demolition engineering and risk-informed planning. Overall, the project is intended to provide a safe, demolition-led solution that reduces workforce exposure, removes redundant infrastructure and supports accelerated hazard reduction across the wider WAGR decommissioning programme. Additional information: https://www.linkedin.com/company/a2r-altrad-atkinsrealis-remediation https://www.gov.uk/government/news/sellafield-ltd-awards-high-hazard-risk-reduction-framework-contract

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS