Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on April 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Doe Neck Road Bridge Replacement over Price Creek

Closed
26-B-71SRState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with environmental support services including storm water pollution prevention. Required materials include ready mix supply, precast concrete, and aggregate. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered, responsive bidders must possess a valid California Contractor's license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested firms must be issued an Invitation to Bid through the Building Connected electronic system, with a response deadline of November 18, 2025. Primary contact for this effort is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 237310
New
SLED
On-Call And Emergency, Repair, Maintenance, Replacement, And Installation Services For Various Public Infrastructure Facilities
Solicitation # 27-037A
The City of Santa Ana is soliciting Statements of Qualifications for solicitation 27-037A to establish a pre-qualified list of contractors for on-call and emergency repair, maintenance, replacement, and installation services for public infrastructure. The scope of work is divided into two primary functional areas: water and sewer systems, including groundwater well equipment, pump stations, and treatment facilities, and channelization, covering the installation and maintenance of signage, striping, and guardrails. All work must adhere to the City of Santa Ana Standard Plans, the California Manual of Uniform Traffic Control Devices, Greenbook Standard Specifications, and Caltrans standards. To be eligible, contractors must hold a General Class A License and possess at least five years of experience working with public agencies. The selection process for the pre-qualified list is based on technical expertise, responsiveness to requirements, and conformance to instructions. Once on the list, individual project awards will be determined by the contractor's response time for quotations, cost, and availability to start work. This is a public works project subject to California prevailing wage rates, and contractors must comply with various federal and state regulations, including the ADA, Section 504 of the Rehabilitation Act, and CARB fleet compliance. Submissions must be made electronically via the PlanetBids portal by November 4, 2026. A complete submittal package requires a detailed implementation plan and several signed certifications, including a notarized non-collusion affidavit and SAM.gov UEI verification for federally funded projects. Payments are processed via ACH transfers within 45 days of receiving a proper invoice. The contract includes a multi-year term with the possibility of extensions granted by the City Manager, and the City maintains the right to inspect all work for up to three years following final payment.
CITY OF SANTA ANA

POSTED

about 9 hours ago

DEADLINE

in 8 days

AI Contract Overview

Show more

The Doe Neck Road Bridge Replacement over Price Creek project in Volusia County, Florida, involves the construction of a new bridge situated north of the intersection of 9 Mile Point Road and Cedar Way Road within the Lake George Wildlife Management Area. The project scope includes the installation of dual pre-cast box culverts topped with concrete pavement, along with concrete traffic railings and headwalls, designed to accommodate maintenance, brush, pickup, and logging vehicles. The bridge replacement does not involve increasing traffic lanes or altering the existing road alignment. Coordination with local entities managing the wildlife area and compliance with environmental and archaeological protections, including the presence of monitoring personnel during ground disturbances, are critical parts of the project. The contractor is responsible for furnishing all necessary labor, equipment, materials, and supplies to complete the work in accordance with Volusia County’s technical specifications and applicable regulatory standards. The contract requires substantial completion within 210 days from the Notice to Proceed, with final completion scheduled 30 days thereafter. Inspection and acceptance of the work occur onsite, with oversight by the County and their authorized representatives, ensuring adherence to quality standards and compliance requirements such as testing protocols and certified material documentation. Proposal evaluations emphasize a combination of factors, including cost, technical capability, experience, resource sufficiency, and local business participation, without strict numeric scoring; the award is based on the lowest responsive and responsible bidder judged to best serve the County’s interests. Safety provisions mandate OSHA trenching compliance and prohibition of illegal labor, while required certifications include debarment status, drug-free workplace commitment, and local business affirmations. All submissions must be electronic via the County’s eProcurement Portal, with strict adherence to specified formats and deadlines. The contract includes necessary permits management, environmental oversight, and signage installation per County specifications, but lacks detailed packaging or delivery term requirements, formal clause listings, or contract value disclosures within the available documents.

General Info

Replace Doe Neck Road Bridge with precast culverts in 210 days, complying with environmental and safety standards.

Documents

32

DOE Neck Road Bridge Replacement Bid Tab

XLSX, High priority: read this firstbid-tab
High

Environmental Assessment for Doe Neck Road Bridge Replacement ZC25090

PDF, High priority: read this firstenvironmental-assessment
High

Exhibit B Special Conditions 26-B-71SR

PDF, High priority: read this firstspecial-conditions
High

Exhibit C Insurance Requirements 26-B-71SR

PDF, High priority: read this firstinsurance-requirements
High

FDEP General Permit 466189-001 for Doe Neck Bridge Replacement

PDF, High priority: read this firstpermit
High

ITB No. 25-B-##XX Prime/Subcontractor Form

XLS, High priority: read this first1 page · prime-sub-form
High

Volusia County Roadway Technical Specifications August 11, 2025

PDF, High priority: read this firsttechnical-specifications
High

DOE Neck Road Bridge Replacement Cost Estimate Summary Sheet

PDF, Low prioritycost-estimate-summary
Low

20251120_-_ACOE_NWP_-_Permit_Letter_Signed.pdf

PDF

Attachment_A,_Scope_of_Work,_26-B-71SR_(REVIEW).pdf

PDF

BID_TAB.pdf

PDF

C2076,_Construction_Contract,_26-B-71SR_(REVIEW).pdf

PDF

CIVIL_PLANS_-_DOE_NECK_ROAD_BRIDGE_REPLACEMENT_OVER_PRICE_CREEK.pdf

PDF

Doe_Neck_Rd_Bridge_Replacement_-Construction_Bid_Request.pdf

PDF

Doe Neck Road Bridge Replacement over Price Creek.pdf

PDF

Exhibit_A,_General_Conditions,_26-B-71SR.pdf

PDF

Exhibit_C,_Bid_Form,_26-B-71SR_(SUBMIT_WITH_YOUR_BID).xlsx

XLSX

Exhibit_C,_PRIME-SUB_FORM,_26-B-71SR.xls

XLS

Exhibit_C,_Required_Bid_Documents,_26-B-71SR_(SUBMIT_WITH_YOUR_BID).pdf

PDF

Exhibit_D,_Payment_and_Performance_Bond,_26-B-71SR.pdf

PDF

Exhibit_E,_CIVIL_PLANS,_26-B-71SR.pdf

PDF

Exhibit_F,_STRUCTURE_PLANS,_Bridge_Culvert,_26-B-71SR.pdf

PDF

Exhibit_G,_VC_Technical_Specifications,_26-B-71SR.pdf

PDF

Exhibit_H,_Environmental_Assessment,_26-B-71SR.pdf

PDF

Exhibit_I,_Geotechnical_Report,_26-B-71SR.pdf

PDF

Exhibit_J,_FDEP_General_Permit,_26-B-71SR.pdf

PDF

Exhibit_K,_ACOE_NWP_Permit,_26-B-71SR.pdf

PDF

Exhibit_L,_FWC_Agreement,_26-B-71SR.pdf

PDF

Final_UES_Geotech_Report_#_2149365R2_dated_9-30-25.pdf

PDF

FWC_Agreement_1997_Appendix_B.pdf

PDF

PC4064-STRUCTURE_PLANS-BridgeCulvert.pdf

PDF

Project_Description_-_Scope_of_Work.docx

DOCX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Engineering & Construction
Contacts2 people available
OfficeDeLand, FL, 32720, USA
Office AddressDeLand, FL, 32720, USA
Contacts
Wayne JacksonConstruction Mgr
Shaira RestoProcurement/Contracts Manager

Interested Companies (49)

VMAX UsaOrlando, FL
Gravity ServicesDeland, FL
RJ Engineering ConstructionLake Worth, FL

See All 49 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Doe Neck Road Bridge Replacement over Price Creek project is located north of the 9 Mile Point Road and Cedar Way Road intersection in the City of Pierson, Volusia County, Florida – Section 17, Township 14 South, and Range 28 East within the Lake George Wildlife Management Area. The latitude and longitude coordinates for the approximate center of the new bridge are 29? 16' 39.87"N, 81? 29' 36.23"W. The Lake George Wildlife Management area is managed by a joint agreement between Volusia County and the St. Johns River Water Management District. The proposed bridge will consist of dual pre-cast box culverts with concrete pavement on top, concrete traffic railings, and headwalls. The bridge will be used to support maintenance vehicles, brush trucks with 400-gallon water tanks, pickup trucks, and logging trucks. This project will not expand the number of traffic lanes or realign Doe Neck Road.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS