This Solicitation opportunity from Washington was posted on September 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Donovan Creek Enhancement and Exclusion Project, Jefferson County Conservation District, Quilcene, WA #2025.08
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Jefferson County Conservation District is seeking bids for the Donovan Creek Enhancement and Exclusion Project located at 193 McInnis Rd in Quilcene, Washington. The scope of work involves instream habitat restoration through the construction of ten post-assisted log structures, the planting of a 50-foot riparian forest buffer, and the installation of livestock exclusion fencing. All work must adhere to Engineering plans and NRCS conservation practice standards 382 and 422, with specific requirements for erosion and sediment control. Critical timing constraints apply to this project, as all work at or below the ordinary high-water mark must be completed between July 16, 2026, and October 15, 2026, in compliance with the WDFW Hydraulic Project Approval permit. The entire project must be substantially complete by May 30, 2027. This is a public works contract requiring the payment of prevailing wages per Washington State law. Interested parties must attend the mandatory pre-bid meeting on August 14 at 1:00 pm at the project site.
General Info
Agency
NAICS
Place of Performance
Port Hadlock, WA, 98339, USASet-Aside
Documents
(201)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (9)
See All 9 Interested Companies
Start a free trial to view all interested companies, their contact details, and full contractor profiles.
Full Description
As detailed in the Engineering Plans, the planned work will require erosion and sediment control measures.
The construction of the PALS will occur at or below the ordinary high-water mark (OHWM) and must be completed within the permitted in-water work window defined by the Washington Department of Fish and Wildlife’s (WDFW) project Hydraulic Project Approval (HPA) permit. All work must be completed in compliance with the HPA and, all work at or below the OHWM must occur between July 16, 2026, and October 15, 2026. All Work must be substantially complete by May 30, 2027. This is a public works contract requiring payment of prevailing wages in accordance with Washington State laws.
Pre-Bid Meeting: Mandatory: 8/14 @ 1:00 pm at 193 McInnis Rd, Quilcene
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
