Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Dormitory Bathroom Renovation

Active
BR081310Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The North Texas Job Corps is seeking bids for the renovation of a dormitory restroom located in Dorm 8, Room 126, McKinney, Texas. The project involves a comprehensive update of the bathroom's floor, walls, and ceiling, including electrical, lighting, ventilation, plumbing, and interior decoration elements. Key tasks include the removal and replacement of wall ceramic tiles, floor tiles where necessary, exhaust fans, and plumbing fixtures such as faucets, drains, and shower heads designed to conserve water. The renovation will also feature new recessed lighting in showers, ceiling-mounted motion detectors controlling lighting and exhaust fans, and the installation of new roof-mounted exhaust fans per NRCA recommendations. Architectural work will include demolition and preparation, refurbishment of showers with specialized waterproofing systems, and installation of matching accent tiles and cove bases. Safety and functionality are top priorities with requirements to relocate emergency lighting, fire alarm components, and fire suppression systems to maintain safety compliance throughout and after construction. The project is funded by the American Recovery and Reinvestment Act and must be completed by September 24, 2010. Interested contractors can obtain bid packages starting August 16, 2010, and are encouraged to participate in a pre-bid meeting and site walkthrough on August 20, 2010. Bids are due by August 24, 2010, at 4:30 p.m. CST, with all inquiries directed to Assistant Center Buyer Janet Dickey. The scope excludes site work, utilities, and structural remodeling, focusing solely on interior renovations and associated mechanical, electrical, and plumbing upgrades.

General Info

Renovate Dorm 8 restroom in McKinney, Texas: tiles, plumbing, lighting updates, safety compliance required.

Agency

N/A

NAICS

238390 - Other Building Finishing Contractors

Place of Performance

1701 North Church Street, MCKINNEY, TX, 75069, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseCombined Synopsis
Posted

Combined Synopsis

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Janet DickeyAssistant Center Buyer

Full Description

Show more
The North Texas Job Corps is soliciting bids for the Renovation of a Dormitory Restroom. Bid Packages will be available on August 16, 2010 and may be obtained by contacting Janet Dickey, Assistant Center Buyer via email (preferred) at contact@example.gov or by phone at +1 (555) 000-0000. There will be a Pre-Bid Meeting/Site Walkthrough held on August 20, 2010 at 2:00 p.m. CST. The work required consist of: A. DESIGN Dorm 8, Room 126 will receive within the existing bathroom square footage: a. Renovation of floor, walls, & ceiling to include electrical, lighting, ventilation, plumbing and interior decorating. B. SITE WORK AND UTILITIES - N/A C. STRUCTURAL - N/A D. ARCHITECTURAL 1. DEMOLITION AND PREP WORK a. Dorm 8, Room 126 i. Removal & replacement of all wall ceramic tile work. Floor tile replaced as necessary. ii. Removal & replacement of all exhaust ventilation fan assembly. iii. Toilet partitions, mirrors and vanities will be removed and re-installed. 2. INTERIOR DECORATION a. Attached Specification Sheet applies to all installed products b. Walls i. All interior walls will be covered with ceramic tile from floor level to drywall ceiling; includes sink area, toilet area, shower area. Accent color tiles will be installed to match Dorm 8, Room 117 tile. Matching trim pieces will be utilized at all locations excepting the cove base which will match the floor tile ii. Each existing shower will have the tile removed to the base CMU and the shower pan replaced including a new shower drain. Shower pans shall be: A system consisting of liquid-latex rubber with VOC content of 65 g/L or less and fabric reinforcement. (LATICRETE can provide this product). c. Floors i. Existing floor may remain where feasible. Floor repair shall be of the same tile as existing so as to match. Floor drains will be replaced so that brass covers are flush with floor tile surface. ii.Cove base of the same tile product will be installed around the entire perimeter of the bathroom and attach to the floor tile d. Lighting i. Recessed can lighting will be included above each shower with all shower fixtures switched together. e. Paint/Finish i. Ceiling will be painted white E. MECHANICAL 1. Install new roof mount exhaust fan 2. Install roof mount by recommendation of NRCA 3. Replace all HVAC vent covers/registers F. ELECTRICAL 1. Relocate light switches to ceiling mounted motion detector 2. Install power to exhaust fan to ceiling mounted motion detector G. LIGHTING 1. Install light fixtures in all showers H. PLUMBING 1. Dorm 8, Room 126 a. Install new faucets and complete new drains in all 4 showers. Shower heads will be 1.5 gpm b. All shower floor drains must be replaced c. All plumbing will have new main shut off valves located in access doors in ceiling. I. LIFE SAFETY 1. Relocate any existing emergency lighting and other devices affected by the construction. 2. Relocate all fire alarm components during demolition. Contractor must assure that the Alarm system is functional following construction daily. 3. Relocate all fire suppression components as required by construction Due to the nature of this project and its funding, this project MUST BE completed by September 24, 2010. The due dates for all bids will be August 24, 2010 4:30 p.m. CST. This project is funded by the American Recovery and Reinvestment Act.

Similar Contracts

Same NAICS industry code

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS