Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Dottin Place I Mechanical Room Waterproofing

Closed
BD-22-1221-MOD00-MOD-121000State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 5 days
NAICS: 238160
New
SLED
REPLACE THE GUTTERS AT THE DEFUNIAK COURTHOUSE
Solicitation # 05-27
Walton County is soliciting competitive quotations for the complete removal and replacement of the internal and concealed gutter system at the three-story DeFuniak Springs Courthouse in Florida. The selected contractor must provide all labor, supervision, equipment, and materials necessary to install a durable, watertight drainage system, including the removal of deteriorated flashing, sealants, and liners. Key requirements include performing a preconstruction assessment to verify dimensions, conducting a controlled water test upon completion, and ensuring all restoration materials are compatible with the existing building. The project requires a final walkthrough with the owner and a comprehensive site cleanup to return the area to its preconstruction condition. Qualified respondents must hold a valid Florida contractor license, such as a Certified General, Building, Roofing, or Sheet Metal Contractor license. Submissions must include a total lump-sum base quotation with an itemized breakdown, a proposed project schedule detailing mobilization and duration, warranty information for both workmanship and materials, and two professional references. The deadline for responses is November 19, 2026, at 12:00 pm, with all submissions and clarifications handled through the OpenGov Procurement portal. Award consideration will be based on price and the ability to meet technical and administrative requirements.
Facility Maintenance

POSTED

about 18 hours ago

DEADLINE

in 22 days

AI Contract Overview

Show more

The contract involves a project to waterproof and improve the mechanical rooms at Dottin Place I in New Bedford, Massachusetts, with an estimated value of $130,000. The scope includes removing the bottom 16 inches of wall gypsum board in 93 mechanical rooms, replacing it with PVC to prevent moisture and staining, and applying heavy-duty waterproof paint to ceilings and walls in the boiler rooms. Bids must be submitted electronically via the designated online platform by October 1, 2025, with a mandatory pre-bid conference scheduled for September 24, 2025. A bid deposit of at least 5% of the maximum bid amount is required, except for projects under $50,000. The project is governed by Massachusetts state laws, specifically M.G.L. c.149, which stipulate bidding procedures and minimum wage requirements, but no federal FAR clauses are incorporated. The procurement process emphasizes transparency and compliance with state statutes, with no specific evaluation criteria beyond the lowest responsible bid. The documents specify no particular packaging, marking, or security requirements, and no detailed technical specifications or performance periods are provided beyond the scope of work. All bid submissions are to be made electronically, with no hard copies accepted, and the process is managed by the New Bedford Housing Authority, with supporting documents accessible via the bid platform.

General Info

Place of Performance

MA, USA

Set-Aside

NONE

Documents

2

Advertisement to Bid - Mechanical Room Waterproofing at Dottin Place I

DOCX, High priority: read this firstadvertisement-to-bid
High

logo.doc

DOC, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → New Bedford Housing Authority
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The Project consists of the removal of the bottom 16â?? of the wall gypsum board in the Ninety-Three (93) mechanical rooms and replace with PVC to prevent stains and moisture build up. Paint ceiling & walls of the boiler room with a heavy-duty waterproof paint to prevent staining and moisture build up.

More opportunities from Massachusetts → New Bedford Housing Authority

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS