Double Springs Energy Storage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Double Springs Energy Storage LLC proposes the construction of a 100 MW utility-scale battery energy storage system (BESS) on approximately 15 acres in Valley Springs, Calaveras County, California. The project consists of up to 240 prefabricated modular outdoor enclosures containing lithium-ion batteries, power inverters for AC/DC conversion, medium-voltage transformers, switchgear, and a collector substation. The facility is designed to stabilize the local transmission grid and will interconnect at the PG&E Valley Springs Substation, with additional associated improvements planned for the Tiger Creek Powerhouse, Electra Powerhouse, and Bellotta Substation. The system will feature a battery management system for charging and discharging control, integrated cooling for temperature monitoring, and remote monitoring capabilities. The project is being processed under solicitation 2024-086 CUP with the Calaveras County Planning Department as the lead agency. Environmental review has been conducted pursuant to the California Environmental Quality Act (CEQA), resulting in a Mitigated Negative Declaration and a Notice of Determination approved on September 14, 2026. Key environmental considerations include impacts on biological resources, such as the California tiger salamander and nesting birds, as well as coordination with Caltrans regarding right-of-way encroachments and pedestrian safety. Mitigation measures include worker training, pre-construction surveys, and adherence to seasonal work restrictions to protect native plants and wildlife. Coordination involves multiple agencies, including the California Department of Fish and Wildlife and the Central Valley Regional Water Quality Control Board.

General Info

Double Springs Energy Storage will build a 100 MW BESS in Calaveras County.

Agency

California → Calaveras County

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Double Springs Road, 0.20 miles west of Highway 26, CA, 95252

Set-Aside

NONE

Documents

(7)

Double Springs Energy Storage Project Summary Form

PDFenvironmental-summary

Caltrans Comments on Double Springs Energy Storage System Initial Study

PDFcomment

Double Springs Energy Storage Project Notice of Completion

PDFnotice-of-completion

Double Springs BESS_ Draft IS-MND

PDF

5B05CR00138 - Double Springs Battery Energy Storage System Project NOD

PDFspecial-notice

CDFW Comments on Double Springs Energy Storage Project MND

PDFcomment

Double Springs BESS Notice of Intent to Adopt Mitigated Negative Declaration

PDFspecial-notice

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Calaveras County
Contacts3 people available
OfficeN/A
Organization / Agency
California → Calaveras County
Office AddressN/A
Contacts
Katherine StefaniSenior Planner
Paul GascoigneDirector, Site Acquisition and Strategy
Cindi HooverCEQA Project Manager

Interested Companies (1)

Show more
Dudek
Oakland, CA

Full Description

Show more
Double Springs Energy Storage LLC (Applicant) proposes to construct the Double Springs Energy Storage Project (Project), a utility-scale battery energy storage system (BESS).The proposed Project would consist of lithium-ion batteries installed within modular outdoor enclosures, inverters, medium-voltage transformers, switchgear, a collector substation, and other associated equipment to interconnect the proposed Project at the Pacific Gas & Electric (PG&E) Valley Springs Substation (point of interconnection). Within the enclosures, the batteries would be arranged on battery storage racks with relay and communications systems for automated remote monitoring and managing of the batteries to optimize design performance. A battery management system would be provided to control the charging/discharging of the batteries, along with temperature monitoring and control of the individual battery cell temperature with an integrated cooling system. Power inverters to convert between alternating current (AC) and direct current (DC), along with transformers to step up the voltage, would be included as part of the proposed Project. Associated improvements to the PG&E Valley Springs Substation, Tiger Creek Powerhouse, Electra Powerhouse and Bellotta Substation are analyzed as part of the proposed Project.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 17 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS