Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Kansas was posted on June 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Douglas L. Smith Middle Basin Asset Renewal Project

Closed
2026-005 Addendum 1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
C26863031 CASWELL MEMORIAL STATE PARK - Campground and Day Use Improvements
Solicitation # C26863031
The California Department of Parks and Recreation is soliciting bids for contract C26863031 to upgrade the campground and day use areas at Caswell Memorial State Park in San Joaquin County. This lump sum project, with an engineer's estimate between 4.2 million and 5.8 million dollars, requires the contractor to provide all labor, materials, and equipment to perform work including asphalt demolition, clear and grub operations, and AC overlay. The project must be completed within 365 calendar days from the notice to proceed, with a maximum of 30 days allocated for punch list items and final completion. Eligible bidders must hold a Class A and/or B license and be registered with the Department of Industrial Relations per SB 854. Award is based on the low price method, though incentives are provided for Disabled Veteran Business Enterprise participation exceeding the mandatory 6 percent goal, subject to a 100,000 dollar cap. Certified small businesses may also receive a 5 percent preference. Bids must be submitted electronically in PDF format to the designated email address by the specified deadline. The contractor is responsible for adhering to local prevailing wage rates, ADA compliance, and strict material storage and labeling standards. Quality control will be managed through on-site inspections, required testing logs, and the use of approved mockups to establish aesthetic and workmanship standards.
California Department of Parks & Recreation

POSTED

about 3 hours ago

DEADLINE

in 27 days
NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

The Douglas L. Smith Middle Basin Asset Renewal Project, managed by Johnson County Wastewater in Kansas, involves comprehensive construction, renovation, and infrastructure upgrades across multiple wastewater treatment facilities and site areas. The scope encompasses the new construction of MB-17 Sodium Hypochlorite Storage, including pre-engineered fiberglass-reinforced buildings, storage tanks, fill stations, an access roadway, and installation of excess flow and relocated effluent chemical metering pump systems. Simultaneously, extensive work is required at existing structures: MB-2 will see replacement of grit classifiers and conveyors, demolition of a belt filter press, and structural repairs; MB-3 will undergo motor control center and process valve replacements; MB-7 will receive a new natural gas-powered standby generator with automatic transfer switch; MB-8 will be upgraded with modified primary sludge pumps and replacements for scum, settled sewage, and sidestream control valves; MB-10 will be fully demolished of its existing sodium hypochlorite infrastructure; MB-11 will relocate an effluent flow meter; and MB-13 will replace primary sludge pumps, odor control fans, building makeup air units, and electrical room air conditioning. Site-wide improvements include yard piping, electrical upgrades, paving, grading, erosion control, and general restoration. All materials must be delivered in original manufacturer packaging, protected against damage and contamination, with specific protocols for mechanical equipment, unpainted components, and structural steel. Equipment must be properly labeled with manufacturer details, electrical specifications, and safety ratings. The contract mandates strict compliance with the Standard General Conditions of the Construction Contract (EJCBC No. 1910-8, 1996 Edition), supplemented by additional contractual conditions covering indemnification, dispute resolution, survival of obligations, Kansas nondiscrimination law, and audit rights. Bidders must demonstrate capability through relevant experience, facilities, reputation, and financial strength, and fully comply with all specifications. The award will go to the lowest and best responsive and responsible bidder, with a preference applied if all factors are equal. The contract requires a lump sum bid submitted exclusively through IonWave by the deadline of July 16, 2026, with mandatory pre-bid conference attendance and site visit. Performance and statutory bonds, each equal to 100% of the contract price, are required, along with liability insurance covering the County, Engineer, and consultants as primary additional insureds. The project must be substantially completed within 870 consecutive calendar days and

General Info

Construction and renovation for Douglas L. Smith Middle Basin project, including tanks, buildings, and equipment upgrades.

Documents

4

2026-005 Addendum 1 Douglas L. Smith Middle Basin Asset Renewal Project IFB

PDF, High priority: read this firstamendment
High

Addendum No. 1 to IFB No. 2026-005 Douglas L. Smith Middle Basin Asset Renewal Project

PDF, High priority: read this firstamendment
High

Bidder Manufacturer Questionnaire for Contract 39 Asset Renewal Project

PDF, High priority: read this firstquestionnaire
High

Douglas L. Smith Middle Basin WWTF Asset Renewal Project - Contract 39 Technical Specifications

DOCX, High priority: read this firsttechnical-specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyKansas → Johnson County
Contacts1 person available
OfficeKS, USA
Organization / AgencyKansas → Johnson County
Office AddressKS, USA

Full Description

Show more
The Work includes the furnishing of the labor, materials, equipment and services for construction of the new process area MB-17 Sodium Hypochlorite Storage and improvements made in the following existing buildings and site work improvements (yard piping, yard electrical, paving and grading, erosion control, and general restoration): MB-2 Solids Processing Building, MB-3 Gravity Thickener Building and Fermenter, MB-7 Administration Building, MB-8 Settled Sewage Pump Station, MB-10 Sodium Hypochlorite Building, MB-11 UV Disinfection Building, and MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building. The work consists of the following:· The Work in MB-2 Solids Processing Building includes the replacement of grit classifiers and conveyors, demolition of an existing belt filter press, and structural beam and elevated slab repairs. The Work in MB-3 Gravity Thickener Building and Fermenter includes the replacement of a motor control center and various process valves.· The Work in MB-7 Administration Building includes the installation of a new natural gas powered standby generator and automatic transfer switch.· The Work in MB-8 Settled Sewage Pump Station includes primary sludge pump modifications and the replacement of the primary scum pumps, settled sewage pumps, and sidestream control valves.· The Work in MB-10 Sodium Hypochlorite Building includes the demolition of existing sodium hypochlorite storage tanks, piping, and pumps.· The Work in MB-11 UV Disinfection Building includes the relocation of an existing flow meter on the plant effluent water pumping system.· The Work in MB-13 BNR Train No. 4 Primary Sludge Pump Station and Odor Control Building includes the replacement of primary sludge pumps, odor control fans, building make-up air unit, and the electrical room air conditioning unit.· The Work associated with new process area MB-17 Sodium Hypochlorite Storage includes the construction of new sodium hypochlorite storage tanks and fill stations, an access roadway, and a pre-engineered fiberglass reinforced building. Within the pre-engineered building, new excess flow chemical metering pumps are to be installed along with the relocated plant effluent water chemical metering pump skid. All questions and bids shall be submitted through IonWave.

More opportunities from Kansas → Johnson County

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS