Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on October 5, 2015. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

DPEZ102007 REPAIR APRON

Awarded
W912L3-15-C-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Fire Alarm engineering for Lewis County
Solicitation # 2026-RFQ-040
Lewis County is soliciting qualifications under solicitation 2026-RFQ-040 for a professional engineering firm to provide comprehensive design and engineering services for fire alarm systems. The project encompasses several County-owned facilities, including the IT Building, Historic Courthouse, Health Building, and Lewis County Jail. The selected firm will be responsible for conducting on-site evaluations to determine the remaining useful life of existing systems, assessing code compliance with NFPA 72, IBC, and IFC standards, and developing bid-ready construction drawings and technical specifications. All designs must be stamped by a licensed electrical engineer familiar with Washington State fire alarm requirements and must integrate smoothly with existing infrastructure to ensure standardized maintenance and operations. Proposals are due by November 10, 2026, via the OpenGov platform and will be evaluated by a committee of at least three County employees using a points-based system. The evaluation criteria are equally weighted at 20 percent each across four categories: firm qualifications (including NICET certifications and licensed engineer availability), responsiveness and capacity to begin work within 30 days, regulatory compliance and permitting records, and the clarity and detail of blueprint designs. Applicants must provide a statement of qualifications, three public agency references from the last five years, and resumes of key personnel. The contract is administered by Matt Patana, Capital Infrastructure Specialist, based in Chehalis, Washington.
Capital Infrastructure

POSTED

about 14 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
International
Provision of Consulting Services for Regional Basement Flooding Mitigation Program Strategic Plan
Solicitation # P-1353-26
The Region of Halton is soliciting proposals for a consulting firm to conduct a comprehensive review of its existing Basement Flooding Mitigation Program and develop a three-year Strategic Plan. The primary objectives are to reduce basement flooding risks, enhance wastewater system resilience, and decrease wet-weather flows. The project is expected to be completed within nine months of kick-off and includes key deliverables such as a current-state assessment report, a prioritization framework for initiatives, a final strategic plan with an implementation roadmap, and a performance measurement and reporting framework. The selected consultant must provide a Project Manager with PMP certification or equivalent credentials. The contract will be awarded based on a scoring system where the technical proposal accounts for 80 points and the cost proposal accounts for 20 points. Proponents must achieve a minimum technical score of 70% to be considered for award and may be invited to a 30-minute presentation. Mandatory submission requirements include a technical proposal, a signed Vendor Code of Conduct Acknowledgement Form, and a cost proposal submitted via the online bidding system by November 12, 2026. The agreement is governed by a modified Standard Agreement and Supplementary Conditions, requiring the consultant to maintain specific insurance coverages: 5 million dollars for Commercial General Liability, 2 million dollars for Automobile Liability, and 2 million dollars for Professional Liability. Additionally, the consultant must provide a WSIB clearance certificate upon award and with every monthly electronic invoice. All produced materials remain the sole property of the Region of Halton, and deliverables must comply with the Ontario Building Code and the Accessibility for Ontarians with Disabilities Act.
Region of Halton

POSTED

about 15 hours ago

DEADLINE

in 23 days
NAICS: 541330
New
SLED
REQUEST FOR PROPOSAL (RFP) STAR Centre Energy Modernization Project Energy Audit
Solicitation # BPM059233
The City of Havre de Grace is seeking proposals for a comprehensive energy audit of the STAR Centre, the city's largest public building, as the first phase of an Energy Modernization effort. This grant-funded project, supported by the Maryland Energy Administration Local Government Energy Modernization Program Grant 52-600796, requires a contractor to perform an ASHRAE Level 1 walkthrough Energy Audit. The scope includes documenting baseline operating conditions, analyzing utility billing data, evaluating eligibility for utility rebates, and providing a detailed report of energy efficiency measures for lighting, HVAC, and building envelope weatherization. Additionally, the contractor must develop a Monitoring Based Commissioning Plan (MBCx) to support future energy management and continuous performance monitoring. The contract will be awarded based on the best value to the city, considering the technical approach, cost factor, and the bidder's experience. Eligible offerors must be established businesses with at least five years of industry experience and must be in good standing with the State of Maryland, Harford County, and the City of Havre de Grace. Required submission documents include a Maryland Business License, a Certificate of Good Standing, an IRS W-9, and evidence of insurance covering General Liability, Workers' Compensation, and Errors and Omissions. Proposals must be submitted electronically via Beacon Bid by November 23, 2026. The selected vendor must be able to complete the audit and deliverables within a 60-day period, with a final project completion deadline of February 5, 2027. Payment will be made upon the successful completion of services, with the possibility of progress payments based on a satisfactory schedule.
City of Havre de Grace

POSTED

about 16 hours ago

DEADLINE

in about 1 month

General Info

NAICS

541330 - Engineering Services

Place of Performance

Cheyenne Wyoming Airport Wyoming ANG, CHEYENNE, WY, 82009, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Justification (J&A)

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7N9 Uspfo Activity Wy Arng
Contacts1 person available
OfficeCHEYENNE, WY, 82009-3338, USA
Office AddressCHEYENNE, WY, 82009-3338, USA
Contacts
Bryan E. ScottContracting Officer

Full Description

Show more
Authority Cited: Citations: 10 U.S.C. 2304(c)(1) or 41 U.S.C. 3304(a)(1). The supplies or services required by the agency are available from only one responsible source. (2) (iii) For DoD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-- (A) Substantial duplication of cost to the Government that is not expected to be recovered through competition. (1) Facts and rationale to justify the use of the specific authority cited. The State of Wyoming awarded an A&E contract #13063327702 with Vogt Construction Engineering, LLC on 15 Nov 2012 that included a $196,594.00 for the Apron Rehabilitation Design. The design was completed but did not include UFGS specifications, and it also needed to be updated. It would not make sense to have another company do the update because they would have to re-validate all of the work that was already accomplished in the $196,594.00 project. Since Vogt did the original project it will only cost $57,471.00 to include the UFGS specifications and to update the project. I consider this a follow-on contract action. (2) Nature and/or description of the action being approved. The Wyoming Air National Guard needed a previous design updated prior to asking for funds to perform the construction project. The original contract #13063327702 with Vogt Construction Engineering, LLC on 15 Nov 2012 that included a $196,594.00 for the Apron Rehabilitation Design needed to be updated and needed to include the UFGS specifications required for Air Force airfields. We awarded a sole source contract to Vogt Construction LLC for the update because they designed the original project so they would not have to re-verify all the work that was accomplished in that design and were already intimately aware of the previous design and the area that needed to be updated. (3) A description of the supplies or services required to meet the agency's needs (including the estimated value). Scope of Work for Apron Rehabilitation/Reconstruction - Project 2 Update Wyoming Air National Guard Cheyenne Airport DPEZ102007 REPAIR APRON This project consists of: Project #2 Update - Revise and Repackage Design Documents The current design documents for the apron expansion and reconstruction work are essentially packaged into three separate construction schedules. Those three are as follows: - Project 1: A best-case apron expansion, approximately 20,300 SY - Project 2: Reconstruction of approximately 10,800 SY of existing apron - Project 4: A reduced-size apron expansion, approximately 3,400 SY Presently, Project 1 and 2 are bound as one set of construction documents. The scope of work described in this attachment separates Project 2 from Project 1 so that Project 2 will serve as a stand-alone construction project complete with its own construction plans and specifications. Additionally, the scope described below updates the plans and specifications for Project 2. This update is necessary to reflect the changes requested during Guard review. The design and supporting design documents including construction plans, design report and construction specifications will be revised as described below: 1. Replace FAA specs with equivalent UFGS specifications (where UFGS specs don't exist, "special" specifications will be developed). 2. Replace the ETL 97-5 spec with the current UFGS specification for concrete pavement. 3. Update any plan sheet details that reference FAA specs to reference the appropriate UFGS and/or "Special" specification. 4. Modify Details 7 & 8/Sheet 14 and Details 2, 3 & 4/Sheet 26 to remove the " bevel at the top of the sawcut joint. 5. Add notes to Details 7 & 8/Sheet 14 and Details 2, 3 & 4/Sheet 26 referencing manufacturers recommended depth: width ratio for the silicon joint sealants. 6. Prepare report discussing the pros/cons of sealing the HMA/PCC joint along the perimeter of the apron with silicone joint sealant, versus using hot applied bituminous sealant. 7. Prepare report that includes a risk analysis of the proposed concrete mill and overlay versus full depth reconstruction. 8. Provide separate bid package (plans and specs) for Project 2 (Apron Reconstruction - 10,800 SY). 9. Participate in teleconference calls to discuss 65%, 95% and 100% design. Type A Services, Preliminary Design Activities include: 1. Pre-design conference and prep 2. Concept Development Meeting & preparation 3. Review and assess comments from ANG. Type B Services, Design Activities include: Type B Services, Phase I, 65% 1. Pavement section design report discussion 2. Update plans 3. Update technical specifications 4. Update design report 5. Solicit comments on preliminary design Type B Services, Phase II, 95% 1. Incorporate Preliminary Design Comments, RFI Responses 2. Complete drawings 3. Prepare technical specifications, with material approval submittals 4. Schedule estimate 5. 95% Docs per ANGETL 10-03 Type B Services, Phase III (FINAL), 100% 1. Incorporate final comments 2. Final drawings 3. Final technical specifications 4. 24 x 36 Sepia drawings 5. Final schedule estimate for 2015 6. Final design reports per ANGETL 10-03 The final Estimate was $60,000. (4) An identification of the statutory authority permitting other than full and open competition. Authority Cited: Citations: 10 U.S.C. 2304(c)(1) or 41 U.S.C. 3304(a)(1). The supplies or services required by the agency are available from only one responsible source. (2) (iii) For DoD, NASA, and the Coast Guard, services may be deemed to be available only from the original source in the case of follow-on contracts for the continued provision of highly specialized services when it is likely that award to any other source would result in-- (2) Substantial duplication of cost to the Government that is not expected to be recovered through competition. (5) A demonstration that the proposed contractor's unique qualifications or the nature of the acquisition requires use of the authority cited. The supplies or services required by the agency are available from only one responsible source. Vogt Construction Engineering was selected as the original firm to conduct the initial design for the Apron Rehabilitation Design and a contract in the amount of $196,594.00 was awarded to them based upon their specialty in working on airfield projects. To have anyone else come in and update the current design would require them to re-validate all of the work that was done in the original design which would result in an additional cost and re-duplicate the effort that was already accomplished in the original design by Vogt. (6) A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable, including whether a notice was or will be publicized as required by Subpart 5.2 and, if not, which exception under 5.202 applies. The contract action is for an amount not expected to exceed the simplified acquisition threshold. (7) The anticipated cost to the Government will be fair and reasonable (8) A description of the market research conducted and the results or a statement of the reason market research was not conducted. Market research was conducted and it was determined that Vogt was the most logical choice because they designed the original project and would not have to re-validate all of the work that was done on the initial project. (9) Any other facts supporting the use of other than full and open competition, such as: If another A&E firm was contracted to do this work the estimate of the cost to the Government that would be duplicated is $200,000, more than three times the estimate of Vogt's update. This estimate was arrived at by estimating the number of hours an engineering firm would have to spend to re-validate the original design and then multiplying that times the average cost of an A&E engineer in this specialty area $180 per hour. (10) A listing of the sources, if any, that expressed, in writing, an interest in the acquisition. N/A (11) A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required. N/A (12) I certify that the justification is accurate and complete to the best of my knowledge and belief.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS