Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

DPW Spring Valley Sidewalk Project Troy Street Phase II

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The DPW Spring Valley Sidewalk Project Troy Street Phase II is a CDBG-funded initiative by the County of San Diego to advance pedestrian infrastructure improvements on the north side of Troy Street between Central Avenue and Bancroft Drive in the Spring Valley community. The project includes the construction of approximately 1,044 linear feet of concrete sidewalk, two ADA-compliant pedestrian ramps, a marked crosswalk, and incidental surface enhancements aimed at improving public safety and accessibility. Funding will support the continuation of the design phase, right-of-way acquisition, coordination with utilities and agencies, advertising and awarding of the construction contract, and potential construction costs. The project has been determined exempt from environmental review under CEQA Guidelines Section 15301 as a minor alteration to an existing public facility, and a Notice of Exemption has been filed and posted in accordance with state requirements. The place of performance is clearly defined as San Diego, California, with all administrative filings directed to the County Assessor/Recorder/Clerk’s office. The solicitation was posted on August 28, 2025, with a deadline for submission on the same date, and project approval was granted on March 11, 2025. The primary point of contact is Kelly Salmons, Deputy Director of Health and Human Services, who serves as the county liaison, while Annisa Busch of the Department of Public Works Environmental Services Unit is designated for payment-related inquiries. No contract value is disclosed, and there are no specified evaluation factors, contract type, or detailed payment procedures beyond the funding source. Federal Acquisition Regulation clauses, special contract requirements beyond CEQA compliance, and offeror certifications are not detailed in the available documentation, and no packaging, marking, or inspection standards are outlined. The project is administered through San Diego County without reference to federal contracting categories, small business set-asides, or military standards, reflecting its status as a locally managed CDBG-funded public works effort.

General Info

CDBG-funded sidewalk and ADA ramp project on Troy Street, San Diego, with environmental exemption and local administration.

Agency

California → San Diego County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Troy Street and Central Avenue, San Diego, CA

Set-Aside

NONE

Documents

(1)

NOE FY25-26 CDBG Troy Street Phase II

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Diego County
Contacts1 person available
OfficeN/A
Organization / Agency
California → San Diego County
Office AddressN/A
Contacts
Kelly SalmonsDeputy Director, Health and Human Services

Full Description

Show more
The proposed project is requesting funds to be used to support phase II of the Department of Public Works (DPW) Spring Valley Sidewalk Project at Troy Street. The funding will continue to support the design phase, right-of-way acquisition and coordination, utility coordination, coordination for advertising and awarding the construction contract, and potential construction costs. The project will consist of approximately 1,044-feet of concrete sidewalk, 2 ADA-complaint pedestrian ramps, a marked crosswalk, and other incidental surface improvements on the north side of Troy Street from Central Avenue to Bancroft Drive in the Spring Valley community.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Sanibel Bridge Fender System Repairs
Solicitation # B260308JAK
Lee County, Florida, is inviting qualified contractors to submit sealed bids for the repair, rehabilitation, replacement, and restoration of the Sanibel Bridge fender system and associated marine components, including timber and composite fenders, prestressed concrete piles, pile head repairs, catwalks, navigation lighting, clearance gauges, handrails, and related structural elements. The scope of work must be fully understood and addressed according to the official specifications available exclusively on the County’s procurement portal at https://leegov.ionwave.net, and bidders are responsible for verifying all documents, addenda, and updates posted there, as submissions based on incomplete or incorrect information from other sources will not be accepted. All bids must be submitted electronically via Ion Wave or hand-delivered in a sealed envelope clearly labeled with the solicitation number B260308JAK, project title, bidder name, and contact details to the Procurement Management Division at 2115 Second Street, 1st Floor, Fort Myers, FL 33901 no later than September 9, 2026, at 7:30 PM, with electronic submissions strongly recommended to avoid technical failures. Bidders are required to complete and sign the Bid Invitation, accurately fill out all attributes and bid lines, and include all requested attachments, ensuring files are uncorrupted and fully accessible. Submissions that are incomplete, unreadable, or improperly formatted may be disqualified. All bids will be publicly opened at the same office on the deadline date and time, and selection will be based on compliance with the solicitation’s technical requirements and overall responsiveness. Questions about the solicitation must be submitted electronically through the official portal’s questions tab, and bidders are cautioned that the County bears no responsibility for internet outages or system failures, urging early submission to ensure timely receipt. The point of contact for inquiries is Jason Koza at jkoza@leegov.com or 239-533-8898, and the official posting site remains https://leegov.ionwave.net for all solicitation-related information.
Lee County

POSTED

about 11 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to address per- and polyfluoroalkyl substances in the water supply. The project aims to enhance the plants' capacity to effectively remove these contaminants in compliance with evolving regulatory standards and public health priorities, requiring integrated engineering solutions across multiple disciplines. All work must be performed in California, with specific attention to local infrastructure constraints and environmental considerations. The solicitation, issued by Pyramid Building & Engineering, Inc. under number lacsd-surface-water-pfas-removal-project-no-251-ca, is open for responses until September 3, 2026, and is designated for Disadvantaged Business Enterprises as defined by the Department of Transportation. It is classified under NAICS code 237310 for water and wastewater treatment construction and seeks qualified contractors with expertise in complex treatment system implementations. Primary communication and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005, with all proposals expected to meet the required standards for DBE participation and technical delivery under the terms of the solicitation.
Pyramid Building & Engineering, Inc.

POSTED

about 12 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237310
New
SLED
4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project, Specification No. PW 23-59
Solicitation # PW 23-59
The City of Oxnard is soliciting sealed bids for the 4th Street Mobility Improvements Project and Downtown Bus Stop Improvements Project under Specification No. PW 23-59, with bids due by 2:00 PM on September 9, 2026. The project encompasses a comprehensive range of infrastructure enhancements along 4th Street from C Street to Oxnard Boulevard, including new concrete sidewalks, curb and gutter, road and driveway reconstruction, electrical conduit and pull boxes for street lighting, traffic signals, bus shelters, street furniture, bike lanes, landscaping, and an irrigation system, with striping improvements extending to Meta Street and the intersection with 6th Street. Additionally, approximately fifty downtown bus stops will be upgraded. Work will involve demolition of existing pavement, curbs, gutters, and sidewalks; removal and replacement of street lighting and trees; excavation and reconstruction of roadways; installation of storm drains and concrete structures; adjustment of utility covers to finished grade; placement of asphalt concrete; and final traffic striping. All work must comply with the 2018 edition of the Standard Specifications for Public Works Construction and all amendments through the 2021 edition, collectively referred to as the Greenbook. Bidders must obtain all contract documents exclusively through the City’s electronic bidding portal at Planet Bids, as the Public Purchase platform is not used for this solicitation. Questions regarding the project should not be posted on any public forum. The project is administered by the City of Oxnard’s Public Works Projects Department, and inquiries can be directed to pw-publicprojects@oxnard.org or (805) 385-8280. Bid submissions are required to be sealed and delivered by the stated deadline, and the work is to be performed entirely within the City of Oxnard, California. No set-aside designation is specified, and all prospective contractors are expected to meet the full scope of construction requirements as detailed in the contract documents.
City of Oxnard

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details