Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on February 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

drain line repair

Closed
31060PR250000079Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves comprehensive plumbing repair services at Pier 4 in Honolulu, specifically targeting the men's restroom connected to the sewer and water lines. The scope includes locating and removing a suspected blockage in the pipes connected to the shower, sink, and urinal, with work conducted either within a confined space or by removing sections of flooring and concrete to access the pipes approximately four feet below the surface. If the blockage cannot be cleared through confined space entry, the contractor is authorized to remove and replace the affected pipe and restore the flooring with matching concrete and tile, subject to approval by the project manager. The work also entails securing the sewer and water lines before and after repairs to ensure proper re-establishment of service. The project is scheduled for a site visit on January 30, 2025, and requires submission of quotes via SF-18 by February 13, 2025. It is a small business set-aside under the SBA, with the NAICS code 237110, and is overseen by the Department of Homeland Security's Base Honolulu office. The contracting officers involved are Justin Hinkle and John Treme, who can be contacted for further details. The contract emphasizes the need for specialized skills, including confined space certification, to safely and effectively complete the plumbing repairs while matching existing flooring and tile conditions to maintain the facility’s integrity.

General Info

Drain line repair contract for small businesses, deadline February 20, 2025, Honolulu, Hawaii.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

HI, 96813, USA

Set-Aside

SBA

Documents

5

31060PR250000079 - Drain Line Repair

DOCX, High priority: read this firstrfp
High

Base Honolulu - Remove Blockage from Pier 4 Drain Line SOW

DOCX, High priority: read this firstsow
High

P-7 Sanitary & Water Piping Diagram

PDF, High priority: read this firstspecifications
High

USCG CEU Honolulu - First Floor Plumbing Plan (P-6)

PDF, High priority: read this firstspecifications
High

SF-18.doc

DOC

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

1 update
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Feb 13, 2025 to Feb 20, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base HONOLULU(00034)
Contacts2 people available
OfficeHONOLULU, HI, 96819, USA
Office AddressHONOLULU, HI, 96819, USA

Full Description

Show more
update 13FEB2025: updated solicitation close date to 20FEB2025. USCG will be providing pictures of the confined space early next week. This should make things more clear, and more competitive. SCOPE OF WORK: Furnish all labor, materials, equipment,and professional services. necessary to conduct the following for Base Honolulu: BASE ITEMS: Work includes but is not limited to: Determine the location of the blockage in the pipes connecting the shower, sink, and urinal in the men's restroom in Pier 4. Secure sewer and water lines to the restroom as required. Provide a Confined Space Certified member to enter the confined space adjacent to the suspected area of blockage. See attached image of the confined space in figure 1. In the confined space, remove the blockage in the pipe. If that is not feasible, remove and replace the pipe. If the confined space does not allow access to the site, begin work in the bathroom. Remove the tile and concrete flooring to gain access to the pipe. The current flooring and suspected floor area to be removed is shown in figure 2. The pipe is believed to be approximately 4 feet below the floor. Remove the blockage. If that is not feasible, remove and replace the clogged pipe. Pour new concrete to replace the flooring to match existing conditions and match the height of the existing floor. Install tile to match existing conditions. Tile must be submitted to and approved by the Project Manager (PM). Re-open sewer and water lines. LOCATION: Pier 4: 433 Ala Moana Blvd, Honolulu Hi. 96813, Honolulu Coast Guard Regional Exam Center Contracting Officer: Justin Hinkle (808) 842-2822, justin.n.hinkle@uscg.mil COR: DCCS John Treme (414) 510-5813, John.P.Treme@uscg.mil secondary COR: DC1 Colin Forey (808)590-6225, Colin.D.Forey@uscg.mil Site Visit: 30JAN25 at 10:00 AM. Must contact DCC John Treme to attend. please submit quote via SF-18

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS