Drainage and Culvert Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for Drainage and Culvert Installation supports Virginia Department of Energy landslide projects located in Wise County. The selected contractor will work under prime contractors to deliver a complete drainage and culvert system, which includes the installation of underdrains on mine bench areas and 30 inch diameter HDPE double-wall flexible pipe adhering to ASTM F2648 standards. Additionally, the scope of work involves the construction of riprap-lined ditches utilizing VDOT No. 57 stone. The opportunity is categorized under NAICS code 237110 and was posted on October 9, 2026. Interested parties must submit their responses by the deadline of October 30, 2026.

General Info

Subcontract for drainage and culvert installation for Wise County landslide projects.

Place of Performance

Wise County, VA, USA

Set-Aside

NONE

Documents

This scope was carved out of 27AML05.

The full solicitation package (5 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Pen Hollow Landslide

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyVirginia Department of Energy
ContactsNo contacts available
OfficeN/A
Organization / AgencyVirginia Department of Energy
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs drainage controls and culverts for prime contractors on Virginia Department of Energy landslide projects. Installs 30 inch diameter HDPE double-wall flexible pipe per ASTM F2648 and constructs riprap-lined ditches using VDOT No. 57 stone. Installs underdrains on mine bench areas. Delivers a completed drainage and culvert system.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
IEUA RMPU Basin Improvements Project Montclair Basin Improvements
Solicitation # ieua-rmpu-basin-improvements-project-montclair-basin-improvements
The IEUA RMPU Basin Improvements Project involves construction improvements at Montclair Basin 2 and 3 in Chino, California. The primary objective is to divert available storm flows from the San Antonio Creek Channel into existing basins to facilitate groundwater recharge. The scope of work is comprehensive, requiring all materials, labor, tools, equipment, and incidentals necessary to furnish, install, commission, and deliver a fully functional project. Key activities include civil and site work such as grading, demolition, saw cutting, cold planing, and trucking, as well as the installation of concrete pipes and structures. Specialized services required for the project include electrical work, welding, construction surveys, preconstruction video, and traffic control. Norstar Plumbing and Engineering, Inc. is managing the solicitation and is specifically seeking certified and qualified DBE, MBE, SBE, and WBE subcontractors and suppliers to support these efforts. The project falls under NAICS code 237110. Interested parties must submit their bids by October 29, 2026, at 2:00 PM. Detailed plans and specifications are available through the Inland Empire Utilities Agency bidding website, and coordination is handled by primary points of contact Nathan and Destiny Plummer.
Norstar Plumbing and Engineering, Inc

POSTED

about 4 hours ago

DEADLINE

in about 21 hours
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The project also encompasses the installation of new gravity sewers, manholes, site grading, and the provision of a fully operating pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with responsiveness contingent upon the submission of a completed EJCDC C-410 Bid Form, a bid bond, and required MWBE documentation, including a Good Faith Efforts Form and Table A. The contractor must provide performance and payment bonds equal to the contract price and maintain insurance with an A.M. Best rating of A-VII or better. Performance is governed by a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to achieve substantial completion. Payments are processed monthly via applications for payment submitted to the Engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 4 hours ago

DEADLINE

in 13 days
View Details
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work includes the rehabilitation of covered and open concrete structures, the relining, modification, or replacement of steel and ductile iron pipes and supports, and the installation or replacement of valves and piping appurtenances. Additionally, the project requires the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, improvements to instrumentation and electrical systems, replacement of motor control center components, modifications to sluice and slide gates, installation of access platforms, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates submitted at the time of the bid. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Bids will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines or comments along with the quote.
Garney Pacific, Inc.

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 237110
New
IEUA RP-5 Offsite Facilities Project No. EN19001.03 and Butterfield Lift Station Improvements Project No. EN26054
Solicitation # EN19001.03 / EN26054
Filanc is soliciting quotes for the IEUA RP-5 Offsite Facilities Project No. EN19001.03 and the Butterfield Lift Station Improvements Project No. EN26054 located in Chino and Chino Hills, California. The comprehensive scope of work involves significant wastewater infrastructure improvements, including the installation of approximately 6,200 linear feet of 14 to 16-inch diameter HDPE DR 11 dual force mains from El Prado Road to Kimball Avenue. Additionally, the project requires the construction of the Mountain Avenue Lift Station with two submersible pumps, modifications to the RP-2 Lift Station to include an elevated electrical platform and standby generator, and the replacement of the motor control center, pumps, and motors at the Butterfield Lift Station while maintaining continuous operational service. Filanc is seeking quotes across a wide array of trades, including SWPPP, survey, aggregates, demolition, fencing, paving, striping, precast concrete, rebar, masonry, metals, coatings, signage, process equipment, pre-engineered FRP enclosures, fire suppression, piping, valves, pipe supports, and E&IC. This solicitation is open to small businesses, including SDB, WOSB, HUBZone, and VOSB certifications, with a strong emphasis on equal opportunity and DBE participation. All bids and quotes must be submitted by October 29, 2025, at 2:00 PM.
Filanc

POSTED

about 4 hours ago

DEADLINE

in about 21 hours
View Details

More opportunities from Virginia Department of Energy

Same awarding agency

NAICS: 237990
SLED
Pen Hollow Landslide
Solicitation # 27AML05
Solicitation 27AML05, issued by the Virginia Department of Energy, seeks a contractor for the Pen Hollow Landslide Project located in Wise County, Virginia. The scope of work includes landslide stabilization, construction of drainage controls, relocation of a water line in accordance with Wise County PSA specifications, road upgrades for off-road trucks, and site revegetation. The contract will be awarded to the lowest responsive and responsible bidder, with award priority given to DSBSD-certified micro or small businesses. Bidders must submit their proposals electronically via eVA by October 30, 2026, and must include a Small Business Subcontracting Plan and a signed Abandoned Mine Lands Contractor Information Form to be considered responsive. The project requires the contractor to commence work within five calendar days of the Notice to Proceed, with a total performance period of 240 calendar days. Key compliance requirements include adherence to the Davis-Bacon Act, the Build America Buy America Act, and various occupational safety and health regulations. The contract mandates the provision of standard performance and labor and material payment bonds. Financial penalties for delays are set at $1,902.82 in liquidated damages per calendar day. Invoicing must be based on documented actual costs and actual units used, as the agency reserves the right to verify all quantities prior to payment. Materials must be delivered in original manufacturer packaging with legible identification, and any non-complying or damaged materials must be replaced at no cost to the owner.
Other Heavy and Civil Engineering Construction

POSTED

18 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS